Forwards IE Insp Rept 50-346/80-23 on 800714-0815 & Notice of Violation
ML19345C188
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19345C189 List:
References
NUDOCS 8012040093
Download: ML19345C188 (2)


See also: IR 05000346/1980023

Text

.\\

.

,W

.

CN ro

'o

UNITED STATES

y

o

!

NUCLEAR REGULATORY COMMISSION

s.,

g

g .l-

a z ^

- REGION lli

o,,

~f

799 ROOSEVELT ROAD

f

%*

,o '

GLEN ELLYN, ILLINots 6o137

  • * " *

SEP 2 6 $80

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. L. A. Reyes of this office on

July 14-18, 21-25, 28-31, August 1, 4-8, 11-15, 1980, of activities at the

Davis-Besse Nuclear Power Station authorized by NRC Operating License No.

NPF-3 and to the' discussion of our findings with Mr. T. Murray on July 21

and August 7, 1980 and through the course of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of. procedures and representative records, observations, and inter-

views with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A

and B.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within twenty days of

your receipt of this notice a written statement or explanation in reply,

including for each item of noncompliance:

(1) corrective action taken and

the results' achieved;.(2) corrective action to be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved. The

inspection showed that action had been taken to correct the noncompliance

identified in Appendix A of the Notice of Violation and no reply to the non-

compliance is required.

Certain areas examined during this inspection concern a subject matter which

is exempt from disclosure according to Section 2.790 of the NRC's " Rules of

' Practice," Part 2, Title 10, Code of Federal Regulations. Consequently,

Appendix B to this letter, an enclosure to our report of this inspection,

and your response to the noncompliance identified in the subject appendix

to this-letter will-not be placed in the Public Document Room. Therefore,

,sc320 40 0E0

$

.

'

=-

.

.

.

.

Toledo Edison Company

-2-

SEP 2 6 E80

your statement of corrective action regarding the noncompliance identified

in the enclosure should be submitted as a separate enclosure to your trans-

-

mittal letter.

In addition,'if the enclosures contain informatica that you

or your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public ~ disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

% Y

'haan,vChief

f

'~

JR. F. Hei

,

Reactor Operations and-

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

Appendix B, Notice

of Violation (Part

2.790(d) Information)

,

3.

IE Inspection Report

-

j^

No. 50-346/80-23, (Attach. A

~

to Rpt Part 2.790(d) Information)

cc w/ encl:

Mr. T. D. Murray,-Station

-Superintendent

Central Files-

_

Reproduction Unit NRC 20b

AEOD-

Resident Inspector, RIII

.cc w/encls~1 and 3, w/o Attach. A

to Rpt,- (Part 2'.790(d) Information)

PDR

Local PDR

.

.

w

r

,

p

'q ) l

'

-s '

_

.

.

"

.L

.

Appendix A-

.

NOTICE OF VIOLATION

Toledo Edison Company

Docket No. 50-346

-

Based on the inspection conducted on July 14-18, 21-25, 28-31, t.ngust 1,

4-8, 11-15, 1980, it appears that certain of your activities were in

noncompliance.with NRC requirements as noted below. This item is a non-

compliance of the deficiency level.

Technical Specification 6.8.1 requires that written procedures recommended

in Appendix A of Regulatory _ Guide 1.33, November,1972, shall be implemented.

Y

Appendix A of Regulatory Guide '1.33, November,1972, includes t.dministrative

Procedures.

Administrative Procedure AD 1839.00 Revision 6, " Station Operations" re-

quires that the Operations Engineer shall make periodic detailed tours of

the unit conducted at a_ minimum of once per. week. Each of these tours

shall be documented by an entry'in the Unit log.

>

. Contrary to -the above, no entries of plant tours tur the Operations Engineer

>

were made for the period of June 11 through June 25, 1980.

.