Responds to Re Environ Qualification of safety- Related Equipment.Qualification Test Schedules Encl
ML19345B756
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/31/1980
From: Anderson T
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19345B754 List:
References
NS-TMA-2332, NUDOCS 8012020462
Download: ML19345B756 (8)


Text

,

._a..

Y

\\

ATTACHf1ENT 1 Tj Westinghouse.

Water Re3C10r i

- Electric Corporation Divisions W 'e n:sf0m m sed!5 P rtscurg# tnt'sstet3152 0 NS-TMA-2332

.i i

Darrell G. Eisenhut, Director October 31,1980

-i I

Division of Licensing i

Office of Nuclear _ Reactor Regulation U.S. Nuclear Regulatory Commission Phillips Building 7920 Norfolk Avenue Bethesda, Maryland ' 20014

Dear Mr. Eisenhut:

In response to your letter dated October 1, 1980 concerning the en qualification of safety related equipment, attached please find the qualifi schedules for the safety related equipment within the Westinghouse sc (NSSS).

est The attached Table 1 includes only the equipment which is curre supply or is scheduled to be tested within the next two years and doesn't incl ested equipment which may require testing as a result of TMI, i.e., incore thermo c onal containment monitor, etc c uples,

-The information in Table 1 Includes:

1.

Equipment description (type, manuf acturer, etc.),

2.

The safety-related system in which the equipment operates, 3.

The test location and schedule.

equipment committed to be ~ qualified to IEEE-373-1974T ng WRD supplied described in WCAP B587.

Mr. G. Butterworth (412-373-5761) or Mr. A. Ball (412-373-4091 my staff.

Very truly yo

,th '

T. M. Anderson, Manager Nuc! car Safety Department e c.

AB/ keg Attachment (s) 8 0130g0 h

+

'N.

ATTACHMENT 1

~ s TABLE 1(Sheet I of 4)

Scheduled Testing W-E40P Test E qu ipnen,t_

Reference fianuf acturer System Location Thermal Aging Radiation Sels.nic I!E t B Saf ety Related HE-1 & 4 Limitorque CVCS Limitorque Start 9-29-80 10-28-80 12-05-t:0 1-04-81 valve Electric SIS Complete 10-07-80 12-05-80 12-18-60 2 '2-81 Hator Operators CCS RitRS Safety Related IIE-2 & S ASCO CVCS ASCO Start 9-23-80 10-22-80 11-19-80 2-16-81 Solenold Valves SIS Complete 10-08-80 11-15-80 12-22-80 3-30-81 RCS WPS SS SGBP RHR i

Saf ety Related HE-3 NMCO CVCS NAMCO St art 9-23-80 10-10-80 11-25-80 1-01-81 Externally SIS Complete 10-07-80 11-25-80 12-08-80 2-01-81 Limit Switches CSS T

AllR RCS

('

')

HE-6 MMCO WPS Start 10-03-80 11-14-80 1-20-81 2-10-81 SS Complete 10-30-80 1-20-91 2-0$-81 3-19-81

(

3 SGUP P essure ESE-1 Barton RPS Barton Start 7-22-80 12-01-80 1-10-81 2-10-81 Ir.n sm i t t er s PM W-Forest Hills Complete 11-15-80 12-31-80 2-01-81 3-01-81 l _3 Group A W-AESD ISOMEDIX u

Piessure ESE-2 Barton RPS Barton Start f] Y 1ransmitters PM W-forest Hills Complete 1979 Geoup 8 W-AE SD Mu; ISO:4EDix Dif f erential ESE-3 Barton RP$

W-Forest Hills Start 7-22-80 12-01-80 1-10-81 2-10-81 g

Pressure PM W-AESD Complete 11-15-80 12-31-80 2-01-81 3-01-80 b

G,oup A ISOMEDIX Ditferential ESE-4 Barton PAM W-Forest Hills Start Pressure RPS W-AESO Complete 1979 Transmitter iSOME01X Group 8 Hesistence ESE-S Rdf

.RPS W-Forst Hills Start 5-19-80 6-27-80 9-24 80 11-01-60 femperature W-AESD Complete 6-13-80 7-23-80 10-22-80 11 20-80 Detector ISOMEDIX

, 'I (UC-Bypass)

SURGICui Univ. of Buffalo Resistence ESE-6 Rdf PAMS W-rorest Hills Start 5-19-80 6-21-80 9-24-80

!!-01-80 9

temperature W-A E SO Complete 6-13-80 7-13-80

, 10-22-80 l'.-20-80 i

Detector IS0:tEDIX k.-.J (Wtil-mounted)

SURGICUT Ualv. of Buffalo J

j l il 9A

. ATTACHMENT 1 FABLE 1 (Sheet 2 of 4)

Scheduled I sting 5

titl e

,, ' ),

)-

Seismic Radi at ton Test 9-24-80 11-01-80 j

Thermal Agi_ng l oc ation 6-27-86 10-22-80 Il-20 }

j

,4 W-EQDP Manuf acturer $ntes

'5-19-80 7-13-80

.};

1 Start 6-13-80 Reference W-forest lillis Complete y

1 pgqignaent RPS Ndf

,W AE50 ESE-7 s

Hes ntence 150MEDIX SURGICUT Temperature Univ, of Buf f alo 4t4 Quarter 1981 --

hetettors (f451 response)

W. forest liills Complete St art RP5 W lGTD W-AE5D E5E-9

~ '

W-!GID

~

Enore tkutron

- 1979 -

Detectors 5 tert l

W-AESD Complete (Source)

RPS ESE ~

W-ID t-W-ID

- 4th Quarter 1981 -

i' Nuclear j'

Instrumentation W-forest tillis Complete Start System (NIS)

APS ESE-Il

.W-AE50 W-ID Source Range

. W-10 i

- 1st Quarter 1981 Preet.plifier (outside Con-5 tart-1 W-AESD Complete talmaent)

Electroswitch RP5 11-30-80 N/A l

ESF N/A 12-05 ~ E5E-12 Main Control N/A 1: w d Switch Start W-AESD Complete ibiales RP5 W-ISD 5-01-80 N/A E5E-13

~

N/A 8-01-80 Process

'N/A P,otection 5 tart W-AESD

. Complete 8-01-19 N/A Systera PAM ESE-14

.W-RID N/A 10-10-79 N/A Start t

Y Indicators W-AE50 Complete PAM L)

ESE-15

~

5' tart W-CID

- 1979

(<

>)

He(orders W-AE50 Cunplete RPS W-ID W-ID ESE-16 E5F Solid State Prutection b,

Syston g

& Saf eguard TestCabinet(2 Train)

Start

- 1979 -

W-AE5D Complete RPS W-ID W-ID b

solid state ESE-17 E5F Protection system

- 1979 -

g

& Safeguard TestCabinet (3 Trains Electrical W-AESD Complete Start W-PED ESE-18 Power Instruncut Bus Supply 3

Pineer Supply

- 1979 _-

U 15 tat 6c Inverter)

Start L

7,5 KVA Electrical W-AE50 Complete W-RED

'g E5E-19

~

Poser Instrument Bus Supply

- 1979 Distribution 5 tart W-AE50 Coraplete

~

Panel 7.5 KVA RPS -

W-LVSD CSE-20 Reactor Trip

% is.h year

1 N

ATTACHMENT 1

}

TABLE I ($heet 3 of 4)

Scheduled Testing W-EQOP Test Ergulpsnent Reference Manufacturer System tocation Thermal Aging Radiation Selselc itEt B Pressure E5E-21 Bartors RPS Barton Start 1-22-80 12-01-80 1-10-81 2-10 P#t5 W-Forest Hills Complete 11 15-80 12-31-80 2-01 3-61-81

.5ensor W-AESD ISOMEDIX 4 Section ESE-22 W-lGTD RPS W-IGID Start 8-20-80 9-20-80 12-01-80 1-10-81 Escore Neutron W-AESD Cunplete 9-15-80 10-05-80 12-31-80 2-01-81 Detector toop Stop E5E-23 W-ID RPS Analysis Start Not Scheduled value Cabinet

~

Only Complete RCP E5E-24 W-ISD RPS W-150 5 tart Not Scheduled Speed Sensor Electro Corp.

Complete Main Control ESE-25 W-CID RPS W-AESD Start Board ESF Conplete 3rd Quarter 1980 PAN Reactor Trip ESE-26

~W-LVSD RPS W-AESD Start Not Scheduled Complete Switch gear Nitrogen-16 ESE-27 W-lGTP RPS W-IGID Start 9-15-80 10-05-80 10-22-80 11-10-00

~

W-AE50 Complete 10-01-00 10-18-80 11-05-80 12-01-00 D

petector Huel Position ESE-28 Productos RPf W-AESD Start Not Scheduled Detector Electronicos, W R&D Coniplete Inc.

Puerto Rico Nod Position ESE-29 W-ID RP5 W-AESD Start Not Scheduled 04ta Cabinet Complete D

Integrated ESE-30

-W-ISD RPS

  • W-AE50 5 tart 3rd Quarter 1981 -

Protection Cabinet W-150 Complete togic Cabinet

~

RPS W-AE50 5 tart 3rd Quarter 1981 int egr ated ESE-31 W-15D W-150 Complete Cabinet

~

RPS W-AESD 5 tart Not Scheduled f ield termir stion ESE-32 W-150 Co mplete Distr ibut ion

~W-AESD Electrical W-AE50 5 tart Nat Scheduled Instrument Bus ESE-33 Power Complete Panel Supply instrument Bus ESE-34 W-AESD Electrical W-AESD Start Not Scheduled I

Distr ibut ion

~

Power Complete Panel Supply

%pply

~

Electrical W-AESD Start Not Scheduled 8

lustronent Power ESE-35 W-AESD

~

Power Complete a

y Supply

ATTACHMEilT 1 TABLE I (Sheet 4 of 4) l-Scheduled Testing TM plu tgnment Reference Manufacturer System tocation Thermal Aginj Radiatha

. Se lyg lif t,n Prcampilfler RPS W-Forest tillis Start 4th-Quarter 1981 source Range ESE-36 W-ID W-AE50 Compiete (In Contaltunent)

Demultipleser

~W-ISD PAM W-AESD Start Not Scheduled PAMS ESE-31 Complete Muttipleser

~

- RPS W-AES!5 Start Not Scheduled Control Board ESE-38 W-ISD ESF Complete Fiber Optic ESE-39

-W-ISD RPS W-ISD Start Not Scheduled

~~

Cable Complete Saf ety Related AE-1(Medium) ~W-19tLG W-AESD Start 4th Quarter 1980 Punp Motors ISOMEDIX Complete 2nd Quarter 1981 W.RLD AE-2(Large) -W-LHD Buffalo CVCS

.W-AESD Start 3rd Quarter 1980 EBS

- 15DMEDIX Complete 1st quarter 1981 515 AllRS CCWS SIS AE-3(Canned) Chempump W -AESD 5 tart 1978

=- -- - --

Lockheed Complete 1st Quarter 1981 Permagrain AE-4(CBS)

WEIR Start Not Scheduled Complete h

N0l[5:

CVCS = Chemical Volume Control System SIS = Safety injection System g

WP5 = Waste Processing System SG6P = Steam Generator Blowdown (Waste) Processing (System)

Rifft. = Residual lleat Removal (System)

C PAf4 = Post Accident Monitoring M

RPS = Reactor Protection System E5f = Engineered Saf eguard Feature RC5 = R. actor Caolant System g

q

~55

= Sampilng System a

CSS = Contaltunsnt Spray System 7

E8. = Emergency Boration System CCW) = Component Coollag Water System,

b

^

nm

ATTACHMENT 2

'A.

1.

Equipment

Description:

Type: Modular. Type Electrical Penetration Assemblies Ca.nister Type Electrical Penetration Assemblies Manufacturer: Conax Corporation 2300 Walden Avenue Buffalo, New York 14225

2.. System where equipment is installed:

Containment Electrical -Penetrations to provide electrical circuits to the containment.

2 3.

Test Location and Schedule:

.(a)

Irradiation - Georgia Tech, Atlanta Splices, Connectors Tenninal Blocks 1/5/81 -2/4/81 Terminal' Blocks 2/6/81-3/16/81 (b) ' Short Circuit Current - GE/HPC, Philadelphia Medium Voltage Penetration 12/8/80-12/15/80 l

(c) Maximum Environment - Conax, Buffalc Medium Voltage Penetration 10/10/80-10/28/80 Splices, Connectors, Terminal Blocks 3/6/81-3/24/81 Terminal Blocks 6/22/81-7/22/81 B.

1.

Equipment

Description:

Main Feedwater Isolation Valve -

Type: Double disc gate with self-contained hydraulic actuator Model:

900 DD

~

Manufacturer: Anchor / Darling Valve, Williamsport, Penn.

2.

System where equipment is-installed _.

Locatt.d in the main feedwater line to the steam generators.

Must close on receipt of containment isolation / SIS signal.

DBE will be a main steam line break.

ATTACHMENT 2 (Continued)

Page 2 B.

(Continued) 3.

Test Location and Schedule:

Test program and schedule has not been firmed as yet. The follow-ing are tentative:

(a) Testing Labs:

Wyle Labs - Huntsville, Alabama - 6/81-l'/81 SDRC - Cincinnati, Ohio

- 6/81-11/81 C.

1.

Equipment

Description:

Main Steam Safety Valves Type:

Spring Actuated Safety Valve Model:

6 RIO HA-75-FN Manufacturer:

Crosby Valve and Gage Company Wrentham, Massachusetts-2.

System where equipment is installed:

Main Steam Line, Upstream of Main Steam Isolation Valve 3.

Test Location and Schedule:

Crosby Valve and Gage Company, Wrentham, Massachusetts 2/1/81-8/1/81 0.

1.

Equipment

Description:

Main Steam Power Actuated Relief Valve Type: -Atmospheric Steam Dump Valve with Hydraulic Actuator Manufacturer:

Control Components International Irvine, California 2.

System where equipment is installed:

Main Steam Line, Upstream of Main Steam Isolation Valve

l ATTACHMENT 2 (Continued)'.

Page'3 D.-

(Continued) 4

3. aTest' Location and Schedule:

Test program and schedule has not been firmed as yet. :The following are tentative:

L(a) Testing Lab:

Wyle Labs - Norco, California-1/ 81 -2/ 81 P

C.

1. - Equipment

Description:

Containment Isolation Valves Type:, Nuclear Butterfly Valves Model: :No. 9220 t

Manufacturer: -Fisher Controls Company Marshalltown, Iowa 2.

System where equipment'is installed:

(a) : Component cooling water supply and-return to the containment coolers.

(b) Post-LOCA' purge exhaust system.

'3.

Test Location and Schedule:

-(a) Testing Labs:

Wyle Labs Huntsville, Alabama Present-1/8/81' Isimedix - Parsippany, New Jersey 12/80-1/9/81 I

__