ML19345B590
| ML19345B590 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 09/30/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19345B585 | List: |
| References | |
| NUDOCS 8012020133 | |
| Download: ML19345B590 (2) | |
See also: IR 05000369/1980025
Text
{{#Wiki_filter:, . . mig4 UNITED STATES
' [ V. -- N NUCLEAR REGULATORY COMMISSION - 2 nE REGION ll [[ g 101 MARIETTA sT., N.W., sulTE 3100 , ATLANTA, GEORGIA 3o303
SEP 3 01980 In Reply Refer To: RII:WHM 50-369/80-25 50-370/80-15 Duke Power Company ATTN: . W. O. Parker, Jr. Vice President, Steam Production P. O. Box 2178 Charlotte, NC 28242 Gentlemen: This refers to the inspection conducted by W. H. Miller of this office on September 2-5, 1980, of activities authorized by NRC Construction Permit Nos. CPPR-83 and CPPR-84 for the McGuire facility, and to the discussion of our findings held with J. C. Rodgers at the conclusion of the inspection. Areas examined during this inspection included fire protection and prevention. Within these areas, the inspection consisted of selective examinations of pro- cedures and representative records, interviews with personnel, and observations by ...ie inspector. We have examined actions you have taken with regard to previously identified enforcement matters and unresolved items. The status of these items is discussed in the enclosed report. Two new unresolved items resulted from this inspection and are discussed in the enclosed report. These items will be examined during subsequent inspections. During the inspection, it was found that r ertain activities under your license appear to be in noncompliance with NRC requirements. These items and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula- , tions. Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including: (1) corrective steps which have'been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. During the inspection it was found that certain activities under your license appear to deviate from commitments to the Commission and have safety significance. ~ These items are identified in the Notice of Deviation enclosed herewith as Appendix B. Please provide us in writing within 20 da3 s of your receipt of this letter your comments including a description of corre ctive actions that have been or will be taken, corrective actions which will be taken to avoid further deviations, and the date correcti. r. r .tions were or will be comp? ared. pl@N . -- - - - ,,,,, . . . . . y .-c - - iw* ---=*
- -. . Duke Power Company -2- . In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary informatior, identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, s' y f# C. E. Murphy, Chie Reactor Construction and Engineering Support Branch Enclosures: 1. Appendix A, Notice of Violation 2. Appendix B, Notice of Deviation 3. Inspection Report Nos. 50-369/80-25 and 50-370/80-15 cc w/ encl: M. D. McIntosh, Plant Manager J. C. Rogers, Project Manac. . }}