05000368/LER-1979-067, Forwards Updated LER 79-067/04X-1

From kanterella
(Redirected from ML19345B442)
Jump to navigation Jump to search
Forwards Updated LER 79-067/04X-1
ML19345B442
Person / Time
Site: Arkansas Nuclear 
Issue date: 11/20/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19345B443 List:
References
2-110-27, NUDOCS 8012010331
Download: ML19345B442 (1)


LER-1979-067, Forwards Updated LER 79-067/04X-1
Event date:
Report date:
3681979067R00 - NRC Website

text

b 3

ARKANSAS POWER & LIGHT COMPANY POGT OFFICE BOX 551 JTTLE ROCK. ARKANSAS 72203 (501)371-4000 November 20, 1980 2-110-27 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Comm.

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 SUBJECT: Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 79-067/04X-1 (File: 2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Environmental Technical Specification 5.6.2.b, attached is the subject report concerning the Auxiliary Building Radwaste Area Radiation Monitor Sample Pump which was found to have a broken coupling during Mode 1 operation.

This is a revision to a previous report submitted September 5,1979.

Very truly yours, w

[DavidC.Trimble

(

Manager, Licensing DCT:

1p Attachment cc:

Mr. Victor Stello, Jr., Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Comm.

Washington, D.C.

20555 Mr. Norman M. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Comm.

Washington, D.C.

20555 N

\\

8012010 um uwce wur-ur,ar,es svsreu