ML19345B410
| ML19345B410 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 11/25/1980 |
| From: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8012010117 | |
| Download: ML19345B410 (2) | |
Text
4..
s south CAROLINA EttcTnic a GAS COMPANY post orriec ses re4 COLUMaiA, south CAmoUNA 29218 T. C. NicHoLs, Jn.
wi r.u.a...o c.%. o m..
Novembe r 25, 1980 sm.. c......
Mr. liarold R. Denton, Director Of fice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission l
Washington, D. C. 20555
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Impact Test Results - A-106 Material
Dear Mr. Denton:
As requested by Mr. Joe Halapatz, South Carolina Electric and Gas Company, acting for itself and agent for South Carolina Public Service Authority, provides forty-five (45) copies of a summary of impact test results on material used in main steam and feedwater systems identified on the attached sheet.
SCESC is pursuing the possibility of obtaining information from the supplier concerning charpy tests on main steam piping identified on the attached sheet at temperatures less than 1200F, Very truly yours, A
j T. C. Nichols, Jr.
FBB:RbC:TCN:rh cc:
V. C. Summer C. H. Fischer T. C. Nichols, Jr.
E. 11. Crews, Jr.
O. S. Bradham O. W. Dixon, Jr.
D. A. Nauman R. B. Clary W. A. Williams, Jr.
B. A. Bursey Q
- y. L. Skolds 22 lf. B. Knotts, Jr.
S-
@PCF/Whitaker
~
t Nit a
s?ti'"
m:
%. m m
,c L
6 H
l' 802 n o 3 off y A
t
/
4 (Inside 0 (Outside @
(Cutside Tenetration).
Containment)
COCE PENETP.ATION PECCESS Cv SPOOL (L)Cv SPOOL (R)Cv DOWNSTE/Jf Cv ISCLATION VALVE Cv EDITICN Y
W #203 SA106 Cr B: 19x1.156 W-14-05 W-14-04 NONE Valve 1611C-TV 1974 C1 2
{
g USS Ht. 1.21716:
SA-106 sm1's Cr B: 18x.9 33 SA-106 sm1's Cr 5: 18x1.156 (Cnly one spool VP-E-6252-1-1
+
Cv 2 40 F = 36. 27, 30 USS Et. L20479 & N32762 USS !!t. L22333 tetween rener a-SA-352 cr. LCB L',75
(---
MLE = 33, 28, 27 Cv @ 40'F = 30,32,34; 32,35,37 Cv @ 32 F = 36,39,35 tion & isolation (Anchor Darling)
?1E = 2 7. 30,31; 29,31,34 11E - 32,35,32 valve)
W #206 SA 106 Cr B: 18x1.156 W-15-0 7 W-15-06 USS Ht. L21716:
SA-106 em1's Cr B: 18x.938 SA-106 sul's CR B: 18x1.156 NCM.
Valve 16118-W 1974 CL 2 g-Q Cv @ 400F = 36,27.30 USS Ht. N32759 USS Ht. LP.3 333 (caly one spool VP-E-t 2 52-1-2
+
MLE - 33,28,2 7 Cv 3 400F = 30,33,31 cv @ 32 f = 36,39,35 1-etween penetra-SA-352 Cr. LCB W '75 M
11E = 2 7. 30,29 F1E = 32,35,32 tion & isolation (Anchor Darling) valve)
QY W F306 SA 106 Cr B: 19x1.156 W-13-05 W-13-04 NONZ Valve It 11A-N 19 74 CL 2 USS Ut. L21716:
SA-106 sel's Cr B: 18x.938 SA-106 sal's Cr B: 18.1.56 (culy one spool VP-E-6:52-1 3
+
j Cv @ 40 F = 36,27,30 USS Ht. L20476 & N32759 USS Ht. L23333 letween penetra-SA-352 2r. LCR V '75 MLE = 33,28,27 Cv @ 32 F = 33,29,29: 39,25,30 cv 0 32 F = 36,39,35 t ion & isolation (Ancher Parling) 51E = 30,28,27: 36,22,23 t1E = 32,35,32 valve)
MS #202 SA-105 (N):C1.1: 33x1.7 MS-17-15 MS-07-01 (I.D.)
MS-07-03 Valve 7NIC-MS 1974 CL 2 g
Cameren Ut. 4150 SA-106 Cr.C: 29.61D x 1.20 SA-106 sm1's Cr.C:29.6 x 1.20 SA-155 KCF 70 (N): VF-1-1:43s
+
Cv @ 320F = 6S,62,64 Car.cron Ht. L3761 Cameron Ut. L3766 2).7 ID x 1.15 SA-216 Cc WCB U '75 MLE = 54,49,51 Cv @ 120 F = 94,92,95 cv G 120 F = 100,100,96 Taylor Forge Ht's (Atwood Morrill)
E E = 81,82,82 10.E = 84,85,86 LJ1A17750; 8;2A69890 Cv @ 120 F = 75,79,73*,
68.6?,60 112 - 64,66,63'49, 46,47 MS #428 SA-105 (N): C1.1: 33x1.7 MS-17-05 MS-05-01 MS-05-03 Valve 2 Fila-MS 1974 CL 2 Cameron Ht. 4150 SA-106 Cr.C: 29.6 ID x 1.20 SA-106 Cr.C: 29.6 ID x 1.20 SA-155 CL.1 Cr.
VP-3-134;$
+
Cv @ 320F = 68,62,64 Cameron Ht. L3766 Cameron Ht. L3766 KCF-70: 29.7 ID SA-216 C. WCB W ' 75 11E = 54,49,51 Cv @ 1900F = 100,100,96 cv @ 120 F = 100,100,96 x 1.150 (Atwood errill)
!1E = 84,85,86 MLE = 84,85,S6 Taylor Forge Rt.
812A69890 cv @ ILO F = 58, 62,60 MLE = 49,46,47 MS #207 SA-105 (N):C1.1: 33.x1.7 MS-17-10 MS-06-01 MS-06-02 Valve 2S018-MS 1974 CL2 Cameron Mt. 4150 SA-106 Cr.C: 29.6 ID x 1,20 SA-106 Cr.C: 29.6 ID x 1.20 SA-155 (N) CL.1 VP-2713408
+
Cv @ 32 F = 68,62,64 Cameron Ht. L3766 Cameren Ht. L3766 KCF-70: 29.7 x SA-216 Cr. WCB W '75 F1E = 54,49,51 Cv @ 120 F = 100,100,96 cv @ 1200F = 100,100,96 1.150 (Atwood Merrill)
MLE = 84,85,86
!aE = 84,85,86 Taylor Forge Ht.
812A69890 Cv @ 120 F = 58, 62,60 MIT = 49,46,47
- - _. _ _ -. -