Forwards Revision 2 to Util Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Revision Contains Minor Clarification in Section C.1 & Minor Editorial Corrections
ML19345B328
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/12/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-01B, IEB-79-1B, NUDOCS 8011280090
Download: ML19345B328 (55)


Text

f

.., N ~

Al*b*ma Power Company

"* 600 North 18th Street

  • ~

Post Offica Con 2641 Drminghem. Alabems 33291 Telephone 205 2501000 A

F. L. CLAYTON, JR.

Alab'ima Nsvu Senior Vice Pres. dent the southern %<tnc spuun November 12, 1980 Dockea Ho g j c

d 7

Mr.' James P. O'Reilly c-3 U. S. Nuclear Regulatory Commission 3

g, Region II, Suite 3100 J5 Q;

101 Marietta Street N. W.

!Qpi y

N Atlanta, Georgia 30303 19$

o, N

FARLEY NUCLEAR PLANT - UNIT 1 C

-h-2 IEB 79-01B - ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT

Dear Mr. O'Reilly:

Enclosed is Revision 2 of Alabama Power Company's response to IEB 79-01B. This revision is submitted in response to comments and questions by Mr. Milt llunt of the NRC Region II staff, and contains a minor clarification in Section C.1 and minor editorial corrections _

to a number of component evaluation work sheets.

The revised pages are to be inserted in your book in accordance with the instructions a,

provided with the enclosure.

c; If you have any questions, please advise.

Yours very truly, F.

. Clayton, r.

TLC:rt Enclosure cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Office of I & E Div. of Reactor Operations Inspection Washington, D. C.

Mr. W.11. Bradford Mr. S. A. Varga Dr. Z. Rosztoczy a

J

E REVISION PACKACE INSTRUCTIONS - REVISION 2

\\m, The Alabama Power Company Response to IEB 79-01B dated July 30, 1980,tras

~

provided in a ring binder with each section separatcd by index tabs. The enclosed package contains revised pages which are to be inserted into this binder as follows:

1.

Insert revised Section C.1 and discard old Section C.1, 2.

For the following component worksheets, insert the revised sheet in the appropriate section and discard the old workshect:

- Section C.2.4 Sheets 22, 23, 24

- Section C.2.6 Sheets 7, 9, 11, 13, 15, 17

- Section C.2.8 Sheet 5

- Section C.2.9 Sheets 8, 10, 12, 14, 16, 17, 18

- Section C.2.12 Sheets 3, 4, 7, 9, 10, 11

- Section C.2.13 Sheets 35, 36, 37, 41-49

- Section C.2.14 Cheets 14, 15

- Section C.2.18 Sheets 5, 7, 9, 11, 13, 15, 17, 19, 21, 23, 25, 27, 29

SECTION C.1 DISCUSSION OF COMPONENT EVALU/7 ION WORK SHEETS b

1.

The component evaluation sheets are formated in accordance with the sample in IE Bulletin 79-01B.

2.

The Master List is broken down into twenty sections (C.2.1-C.2.20), each section corresponding to a specific plant system.

For each system, component evaluation work sheets have been prepared for all components listed in the Master List. A separate work sheet exists for each line item in the Master List for each system, with the exception of instrument cables, power and control cables, and electrical penetrations. For those items, one work sheet in each system applies to all components of that type for that system. For example, Sheet 6 in Section C.2.10 applies to all power and control cables lir,ted in Section C.2.10 Sheet 1 (IVAED06Q, IVAED06E, IVBEE09Q, and IVBEE09E).

jfg 3.

The component evaluations have been based on an extensive research of the qualification documents.

Where qualification documents were not available, evaluations were made by engineering analysis of the component materials. Where necessary, vendor information was obtained in preparing the engineering analysis.

4.

For all devices, both in-containment and outside, the manufacturer, model number, location, area and floor elevation were based on engineering documents. The information will be verified on a sample basis during a walkdown at the next unit refueling.

5.

Flood elevation was considered for equipment located both inside and outside the containment. The elevation indicated on the component evaluation sheets for in-containment equipment represents the probable maximum flood level based on the RCS inventory, the SI accumulators and hur the RWST emptying into the containment. As discussed in the FSAR, C.1-1 Rev. 2

Ssetion 3K.4.1.2.7, the worst case flooding concern is a main feedline break. Flooding in the main steam room due to a main feedline break is b

limited by automatic controls, to a level of 3'-5" above the floor.

This level is well below the lowest safety related equipment. For this reason, flooding was not included on component evaluation worksheets for equipment outside Fae containment.

6.

As stated in the " Dites _ssion of Master list," all devices in the auxiliary building have been evaluated for radiation resistance only for an accident inside containment (recirculation of containment sump liquid). Temperature, pressure and humidity outside HELB areas are considered no worse than that during a normal unit shutdown. The

" Discussion of Master List" identifies the High Energy Line Breaks (HELB) in the Auxiliary Building.

The radiation dose levels in the auxiliary building for a post in-containment accident are based on calculations developed for response to "NUREG 0578 Short Term Requirements," Item 2.1.6.b (" Plant Shielding Review"). Radiation qualification requirements were not specified for all equipment bought for outside containment use.

However, based on the available data and engineering analysis. all the equipment has been evaluated for the radiation levels, and all lound acceptable. A summary of these calculations is presented in Section C.3.

7.

Where noted in the " Environmental Qualification" column of the component evaluation sheet, the NSSS vendor's proprietary information has not been entered. However, a reference is made to the document where the information can be found. An independent evaluation was performed on these documents to assure qualification for the specified accident g,,

environment.

C.1-2 Rev. 2

8.. Tha Document References are listed in Section C.4 and will be ava'ilable l

at Farley Nuclear Plant Document Control.

9.

The environmental parameters listed in the " Spec." column under

" Environment" correspond to the accident conditions stated in the FSAR.

These values equal or exceed those set forth in the Enclosure (4)

Cuidelines of lE Bulletin 79.01B, and encompass the equipment qualification parameters appropriate for the spectrum of LOCA's and HELB's.

For the limiting main steam line break, thermal responses of safety-relat:4 components were calculated using the methods presented in NUREG 0588 and were used to establish the required qualification parameters.

10.

For equipment whose safety related function is performed within a short time into an event, a minimum of one hour was assumed to be the specified operating time, even though the actual specified operating time is indicated on the evaluation work sheets, which may be considerably less than one hour.

11.

Unless otherwise snacifically stated to the contrary, the time dependent temperature and pressure qualification profiles envelop the specified or required profiles for each equipment or component for which a work-sheet is provided. The qualification profiles are contained in the reports referenced in Section C.4 in either graphic or tabular form.

12.

Where the words " sequential test" are used to describe the qualification method, it is meant that elements of the test were performed in steps or sequence.

In some cases, aging was performed before irradiation, and vice versa.

In all cases, irradiation and aging were performed before exposing the test specimen to the accident profile. The words

" simultaneous test" mean that the test parameters were applied at the j

same time, or simultaneously.

jb C.1-3 Rev.2

"#(

SYSTEM COMPONENT EVT ATION WORK SHEET fI S:cticn C.2.o Eseph M. Faricy Nuclear Plant Unit 1

Sheet 22 cf ENVIRONMENT EQUIPMENT DESCntPTION DOCUMENTATION REF.

QUAL.

OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL.

METiiOD ITEMS SYSTEM: Feedwater Control OPER ATING Simultancour PLANT ID NO.

NIC22V0478A-A/JB TIME 10 min.

7 days 1

4 tcot Nonc COMPONENT: Tenninal Block with TEMP.

308 Simultaneouo NEMA 4 enc 1'osure i F)

Note 1 307 2

4 test None MANUFACTt/REn: Statco Company PR ESSURE 20.5 simutaneous

~

(PSIA)

Note 2 80 2

4 test None MODEL NUMDER: 'lype ZWH RELATIVE 100 100 3

4 test None Catalog H-25012 HUMIDITY (%)

FUNCTION: Conductor Termination CHEMICAL N nO3+

UO"O 3

Simultancoun SPilAY Hn0l!

None tcst UO"c 1 X 100 ACCURACY: SPEC: Not. app 1_icabic Sequential DEMON:

RADIATION

.Honc

.N nc N ""

Rads 4

Test SERVICE: Electrient Sufety Syutema Sc'lue n t ial LOCATION: Aux Bldg.

Elev. 121'-0" AGING Note 3 40 years Note 3 4

Leut Nonc 3

R FLOOD LEVEL ELEV: Not Applicabic SUnMqn.

S ADOVE FLOCr0 LEVEL:

GENCE 11/A N/A N/A N/A N/A None o

o

' DOCUMENTATION

REFERENCES:

NOTES:

J. II. Farley FSAR Sect. 3K-4.1.4.8 1.

Temperature profile from Reference 2.

Ramp up to 300.40F in 0.3 occ.,

Dechtel Calulation 525-25-7597 from ramp down to 300 F in 0.4 acc., dwell at 300 F for 0.6 oce., etcp down 0

Crmputer Run T-10576 and dwell at 214 If until termination of event.

J. H. Faricy FSAR Sect. 3, Appen-2.

Presoure profile from Reference 2. Ramp up to 20.5 pain in 0.1 occ.,

dix SK.,

ramp down to 18.4 pain in 0.6 acc., dwell at 10.4 pain for 0.55 oce.,

.. Wyle Laboratorico NEQ Toot Report step down and dwell at 15.5 psia until termination of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01n

' lev. 2

- T-5YSTEM WOpONUMT EVT ' ATION WORK SHEET h

5:cticn C.2.4 J:seph M. Farley Nuclear Plant Unit 1

Sheet 23

,c f EQUIPMENT DESCRIPTION

^

OUAL.

OUTSTANDING PARAMETER SPEC.

QUAL.

S PE C.

QUAL.

METif0D ITEMS SYSTEM: Fnedwater Control OPERATING Simultancout PLANT ID NO.

It1C22V0488A-A/JD TIME 10 min.

7 daya 1

4 teot Hone COMPONENT: Terminal Diock with

TEMP, 308 Simultaneouc NEMA 4 enc 1'osure

( F)

No'c 1 307 2

4 test None MANUFACTt/RER: States Company PR ESSURE

'20.5 simutaneous (PSIAI Note 2 80 2

4 test None MODEL NUMBER: Type ZR RELATIVE Simu tane u:

100 100 3

4 test None Catalog H-25012 liUMIDITY (%)

FUNCTION: Conductor Termination CllEMICAL N n03+

Mmultancoun NO"U 3

SPilAY Na0ll U

"C None test 1 X 100 ACCURACY: SPEC: Not applicable DEMON:

RADIATION

.None Nonc Sequential Rads 4

Test U ""

SEpVICE: Electrical Safety Systema Sequentini LOCATION: Aux Bldg.

Elev. 121'-On AGING Hote 3 40 years Note 3 4

test None p

FLOOD LEVEL ELEV: Not Applienbic SUDMER-ADOVE FLOOD LEVEL:

GENCE N/A N/A N/A N/A NM Nm '

o a

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. H. Farley FSAR Sec t. 3K-4.1.4. 8 1.

Temperature profile from Reference 2 Ramp up to 308.40F in 0.3 sec.,

2.

Dcchtel Calulation 525-25-7597 from ramp down to 300 F in 0.4 oce., dwell at 300 F for 0.6 oce., atep 'down 0

0 Computer Run T-10576 and dwell at 214 7 until termination of event.

D.

J. H. Faricy FSAR Sect. 3, Appen-2.

I'rcosure profilo from Reference 2. Ramp up to 20.5 pala in 0.1 acc.,

dix SK..

ramp down to 18.4 pala in 0.6 sec., duell at 18.4 psia for 0.55 sec.,

S.

Hyle Laboratorico NEQ Test Report step down and dwell at 15.5 pain until termination of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01B Rev. 2

43

{

SYSTEM COMPONENT EVW " \\ TION WORK SHEET C.fJ e.4 S:cticn Jos;ph M. Faricy Nuclear Plant Unit 1

Sheet 74 cf ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION OUA L~

GUTSTANDING PA RAMETE R SPEC.

QUAL.

SPEC.

QUAL.

METHOD ITEMS SYSTEM: Feedwater Control OPE R ATING Simultancouc PI' ANT ID NO.

NIC22V0498A-A/JB TIME 10 min.

7 days 1

4 teot None COMPONENT: Teminal Diock with TEMP.

300 Simultancouo NEMA 4 cnc1'ooure i FI Note 1 307 2

4 teot None MANUFACTL/RER: States Company PRESSURE 20.5 simutaneous (PSIA)

Note 2 80 2

4 teot None MODEL NUMDER: Type Zi/M RELATIVE 31*"I'8"'

"U 100 100 3

4 teot None Catalog M-25012 I!UMIDITY (%)

FUNCTION: Conductor Termination CllEMICAL N n03+

Simitaneoun None 3

NO"O SPRAY Nn0ll tcst NO"O ACCURACY: SPEC: Not opplicabic 1 X 100 Sequential RADIATION

. Hone U ""

U ""

DEMON:

Rads 4

Test SERVICE: C1cctrical Safety Systemo Sequential AGING Note 3 40 years Note 3 4

teut None 3

LOCATION: Aux Bldg.

Elev. 121'-On 2

FLOOD LEVE,L ELEV: Not Applicable SUDMER-

'2 N/A N/A N/A N/A N/A h

A00VE FLOCfD LEVEL:

GENCE o

Ei CDOCUMENTATION

REFERENCES:

NOTES:

J. H. Paricy FSAR Sect. 3K-4.1.4.8 1.

Temperature profile from Reference 2.

Ramp up to 308.40F in 0.3 oce.,

0 Dechtel Calulation 525-25-7597 from ramp down to 300 F in 0.4 occ., dwell at 300 F for 0.6 acc., etcp down Cc puter Run T-10576 and dwell at 214 y until termination of event.

J. H. Faricy FSAR Sect. 3, Appen-2 Prcacuro profilo from Reference 2. Ramp up to 20.5 poia in 0.1 acc.,

dix SK..

ramp down to 18.4 pain in 0.6 occ., dwell at 10.4 pain for 0.55 occ.,

Wyle Laboratorico NCQ Test Itcport otep down and dwell at 15.5 psin until termination of event.

3 44354-1 dated 3-8-79 3.

Enclosure (4) to IE Bulletin 79-01H Rev. 2

g(f

.......-..7..................

a u a o e.v.

Sccticn C.2.6 bl Joseph M. Farley Nuclear Plant Unit 1

Sheet 7

[NVinONMENT DOCUMENTATION REF.

EOUIPMENT DESCRIPTION QUAL.

OUTSTANDING PAR AME TE R SPEC.

QUAL.

S PE C.

QUAL.

METHOD MM SYSTEM: C'Dir Cooling and Purge OPE R ATING Simultaneous TIME PLANT ID NO., Q1P13ZS3196 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 3imultaneous

("FI Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSURE 62.2 31multaneous

]

(PSIA)

Note 2 70 3

4 Tr:st None MODEL NUMBER: EA-180 RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N DO3+

N 003+

Simultaneous Indication SPRAY 3

3 NnOH fin 011 1

4 Tcat None 0

ACCURACY: SPEC:

//= 5 x 10 I= 1 x 10 I

RAulATION Rndn Rada DEMON: Not applicable d = Note 5 d = <.107. f and Note 4

/*

Sequential None SERVICE:

Ctet, Purge Exhaust AGING LOCATION: Containment Elev. 129' Note 4 Note 3 Noto 4 4

4 None FLOOD LEVEL ELEV: 115' SusutR.

ADOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F fram ambient in 50 see 2.

J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in I hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112"P in 11.5 days.

4 Acme-Cleveland Development Co.

2.

Preneure prof fic from Reference 3.

Ramp up to 62.2 psia in 40 sec.', dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 paia in 1 hr.-45 min., ramp dewn to Controls Limit Switch Hodel 16 pain in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 'F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correintion between these conditions and the qualified life is not known per Reference 4 4.

Encinnure (4) to TE nulletin 79-01n.

g 5.

For /3, the component is considered qualified if the /J dose of 2 x 10 Rads is reduced by shiciding to 107. of the f dose

-..e m.m...

g..

S:ctionT,C.2,6 Joseph M. Farley Nucl:ar Plant Unit 1

Sheet 9 cf ENVIRONMENT DOCUMENTATION DEF.

QUAL

  • OUTSTANDING EQUIPMENT DESCRIPTION PARAMETER SPE C.

QU A L.

SPEC.

QUAL METHOD gyggg SYSTEM: CDff Cooling and Purge OPE R ATING 31multaneous TIME PLANT ID NO. Q1P132S2867B_ _

4 hr.

6 hr.

1 4

Teet None COMPONENT:

Limit Switch TEMP.

300 Simultaneous U

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE Simultaneout.

HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Indication SPHAY 3

3 Simultaneous Nno11 Nn0tt 1

4 Test None 8

ACCURACY: SPEC:

g = 5 x 10

$= 1 x 10 RADIATION R.

R a DEMON: Not applicable SERVICE:

CTNT Mini-Purge Supply AGING E

LOCATION: Containment Elev.129' Note 4 Note 3 Note 4 4

4 None C

FLOOD LEVEL ELEV: 115' SUD ME R-2 ADOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None 5

3

' DOCUMENTATION

REFERENCES:

_ NOT E S:

1.

J. M. Parley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. M. Farley FSAR Figure 6.2-6 Ramp down to 256"F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec.; dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Model 16 pain in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation b-tween these conditions and the qualified life is not known per Reference 4,

L.

Encionure (4) to TE nulletin 79-01n.

8 5.

For /3, the con.ponent is considered qualified if the /3 dose of 2 x 10 Rads is reduced by shiciding to 107,of the f dose

(

........,.......y........-......

S:ction T,0.2.6 f

Joseph M. Farley Nuclear Plant Unit i

Sheet 11 cf

/

ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION QUAL.

OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL METHOD ITEMS SYSTEM: CTKr Cooling and Purge OPERATING Simultaneous TIME PLANT ID NO. Q1P132S3197_, _ _

4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous i Fl Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSURE 62.2 Simultaneous S'Al Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teae None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultaneous Indication SPRAY 3

3 Na011 Nnott 1

4 Teat None 8

5 x 10 i= 1 x 10 g= Ra ACCURACY: SPEC:

RADIATION Rad DEMON: Not applicable SERVICE: Ctet. Purge Supply _ _ _ -

AGING b

LOCATION: Containment Elev.129' Note 4 Note 3 Nota 4 4

4 None R

FLOOD LEVEL ELEV: 115' SUDMER.

y ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION R EFERI'NCES:

NOTES:

1.

J. M. Farley FSAR Tabic 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme-Cleveland Development Co.

2.

Pressure prof fic from Reference 3.

Ramp up to 62.2 psia in 40 sec.,' dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Hodel 16 paia in 11.5 days.

EA-180 dated 11-21-77 3.

'Ihemally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4.

4.

Encinnure (4) to TE Rulletin 79-01R.

g 5.

For /3, the component is considered qualified if the /J dose of 2 x 10 Rads is reduced by shiciding to 107. of the 3 dose

.....__.._., Rev. 2

T S;ction f,C.2.6 F

Joseph M. Farley Nuclear Plant Unit 1

Sheet 13 cf ENVIRONMENT DOCUMENTATION REF.

OUAL OUTSTANDINC EQUIPMENT DESCRIPTION PARAMETE R SPEC.

QUAL.

S PE C.

QUAT METHOD IT E MS SYSTEM: CTMT Cooling and Purge OPERATING 31multaneous PLANT ID NO.

Q1P13ZS2866B TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch T

P.

300 Simultaneous Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4, Test None MODEL NUMBER: EA-180 RELATIVE Gimultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultaneous Indication SPRAY 3

3 Na011 Nnott 1

4 Test Nona 8

5 x 10 I= 1 x 10 8= Rads ACCUF'.ACY: SPEC:

I RADIATION Rads DEMON: Not applicable d= Note 5 O=(107.f and Note 4 4

Sequential None SERVICE:

CTMT Mini-Purge Supply AGING I

LOCATION: Containment Elev.129' Note 4 Note 3 Note 4 4

4 None T

FLOOD LEVEL ELEV: 115' SUDMER.

{

ADOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

{

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. M. Farley FSAR Table 3.11-l' 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. M. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Model 16 pata in 11.5 days.

EA-180 dated 11-21-77 3.

'Ihermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4 4

Encinnure (4) to TE Bulletin 79-01B.

g 5.

For /3, the component is considered qualified if the /.] dose of 2 x 10 Rads is reduced by shielding to 107. of the 1 dose

......_..._., Rev. 2

f f'

SYSTEM COMPONENT EVALUATION WORK SHEET Sc'clohC.2.6 Joseph M. Farley Nuclear Plant Unit 1

Sheet 15 of ENVIRONMENT DOCUMENTATION REF.

QUAL.

OUTSTANDING PARAMETE R SPEC.

QUAL.

SPEC.

QUAL.

METHOD ITEM SYSTEM: Ctmt. Cooling and Purge OPERATING PLANT ID NO. Q1E122S3999A TIME Simultaneous 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 I II Simultaneous Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 (PSIA)

Simultaneous Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE HUMIDITY (%)

Sicultaneous 100 100 1

4 Teat None F8)NCllON: Valve Position CHEMICAL N B03+

N B03+

Indication SPRAY 3

3 Sic:ultaneous Nn0H MnOH 1

4 Test None 8

ACCURACY: SPEC:

d= 5 x 10 6= 1 x 10 1

DEMON: Not applicable RADIATION Rads O = Note 6 O=< Rads 107,fand Note 4 4

Sequential None SERVICE:

Reactor Cavity Cooling AGING LOCATION: Containment Elev. 35' Note 4 Note 3 Note 4 4

4 None 2

FLOOD LEVEL ELEV: 115' SUBMER.

2 A00VE FLOOD LEVEL: No GENCE Note 4 Note 5

_None None None None h

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

, j, ~

0 4

Acme-Cleveland Development Co.

2 Pressure profile from Referen::e 3.

Ramp up to 62.2 psia in 40 se'c., dwell at Qualification Report for NAMCO 62.2 pain for 6 min., ramp down to 26.7 paia in 1 hr.-45 min., ramp down to Controls Limit Switch Hodel 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draf t Standard N278.2.1.

Correlotion between these conditions and the qualified life is not known per 6.

For O, the component is con-4.

Enclosure (4) to IE Bulletin 79-01B.

sidered qSalified if the 8 dose 5.

Although this component may become submerged following a postulated accident, Its safety function will have been performed prior to its becoming subocrged, 1 eldi a t

7. of 1.

one.

SYSTEM COMPONENT EVALUATION WORK SHEET Sec'tloh C.2.6 J:seph M. Farley Nuclear Plant Unit _

1 Sheet 17 of c

ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF.*

ouAL, OUTSTANDING PARAME TER SPEC.

QUAL SPEC.

QUAL METHOD gytus SYSTEM: Ctmt. Cooling and Purge OPERATING PLANT ID NO. Q1E12ZS3999B TIME Simultaneous 4 hr.

6 hr.

1 4

Teae None COMPONENT:

Limit Switch TE MP.

300 OfI Simultaneous Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 (PSIA)

Simultaneous Note 2 70 3

4 Test None MODEL NUMDER: EA-180 RELATIVE HUMIDITY (%)

Simultaneous 100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Indication SPRAY 3

3 Simultaneous Nnott NnOH 1

4 Test None 0

ACCURACY: SPEC:

8= 5 x 10 6= 1 x 10 I

DEMON: Not applicable RADIATION O = Rade O =<Rada107. f and Note 4 4

Sequential None Nece 6 SERVICE:

Reactor Cavity Cooling LOCATION: Containment Elev. 105, AGING Note 4 Note 3 Note 4 4

4 None FLOOD LEVEL ELEV: 115' SUDMER-C ABOVE Fl OOD LEVEL: No GENCE Note 4 Note 5 None None.

None None h

'DOCUMEPeTATION R EFERENCES:

NOTES:

1.

J. M. Farley FSAR Tr.ble 3.11 1 1.

Temperature profile from Reference 2 Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., d' ell at v

3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from R-ference 3.

Rampupto62.2painink0sec.,dwellat Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 pain in I hr.-45 min., ramp down to controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

"ihermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per 6.

For d the component is con-sidered q alified if the 6 dose 4.

Enclosure (4) to IE Bulletin 79-018.

5.

of 2 x 10 Rads is reduced by Although this component may become submerged following a postulated accident, shielding to 107. of the Y dose, its safety function vill have been performed prior to its becoming subc>erged, s

E(

SYS1 EM COMPONENT Et ATION WORK SHEET

(.

Secticn C.2.8 Jowph M. Farley Nuclear Pl:nt Unit 1

Sheet 5

ct ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION OUAL OUTSTANDING PARAMETER SPEC.

QUA SPEC.

QUAL METHOD ITEMS SYSTEM: Post LOCA Ctmt. Cas Cont.

OPERATING 1 yr.

iimultaneous PLANT ID NO. Q1F,19M001D (C001D)

TIME 4 hr.

Post DBA 1

4 Test None COMPONENT:

TEMP

  • 300 31multaneous Post LOCA.C1HT Mixing Fan i FI Note 340 2

4 Test None (motors)

MANUFACTURER:

Joy Manufacturing PRESSURE 62.2 limultaneous Company (Reliance) l PSIA)

Note 2 94.7 3

4 Test None MODEL NUMBER:

RELATIVE 3imultaneous 23-14-1770 HUMIDITY (%)

100 100 1

4 Teet None FUNCTION: Hydrogen Concentration CHEMICAL H B03+

H B03+

umultaneon Reduction SPRAY 3

3 1

4 Test None gg 7

0 ACCURACY: SPEC:

](. 5 10 T.1 10 RADIATION DEMON:Not applicable g

SERVICE: Post IDCA H2 Control AGING LOCATION: Containment Elev.155' I

Note 3 Note 5 None Note 5 Ar.slysis None

!?

FLOOD LEVEL ELEV: 115' SUDMER-ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None 5

3

' DOCUMENTATION

REFERENCES:

NOTES:

1 J. M. Perley FSAR Table 3.11-1 1.

Temperature profgle from Reference 2.

Ramp up to 300 F from ambient in 50 see 2

J. M. E arley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3

J. H. parley FSAR Figure 6.2-4 100"F for 6 hre.-56 min., ramp to 112 F in 11.5 days.

4 Joy Mfg. Co. Qualification Test 2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Report X-604 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to 16 psis in 11.5 days.

3.

Enclosure (4) to IE Bulletin 79-018.

g 4.

For /3, the component is considered qualified if the d dose of 2 x 10 Reds 1a reduced bv shieldinst to 107. of the X dose 5

Useful life determined to be in excess of 40 years based on weak link activation energy and Arrhenius model. Manufacturers confimation requested via Bechtel letter V-3818 dated 6-5-80

S p

I s;

SYSTEM COMPONENT E UATION WORK SHEET Srction C.2.9 Joseph M. Farley Nue!:ar Plant Unit 1

Sheet 8 of ENVIRONMENT DOCUMENTATION REF.

EQUWENT DmRMW OUAL.

OUTSTANDING PARAMETE R SPEC.

QUAL.

SPEC.

QUAL METHOD ITEMS SYSTEM: Safety Injection OPERATING PLANT ID NO. NIE21ZS8871 TIME Simultaneous 4 hr.

6 hr.

1 4

Test Nona COMPONENT:

Limit Switch TEMP.

300 Simultanecus

! Il Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Indication SPRAY 3

3 Simultaneous NanII Nn0H 1

4 Test None 0

5 x 10 1= 1 x 10 3'= Rads ACCURACY: SPEC:

Rads t

i RADIATION DEMON: Not applicable

/)= Note 5 A = < 107.

and Note 4 4

Sequential None SERVICE: Accumulator Test Line AGING 3

LOCATION: Containment Elev. 129, Note 4 Note 3 Note 4 4

4 None R

FLOOD LEVEL ELEV: 115' SUBMER-2 ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Refere nce 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. M. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 pain in 1 hr.-45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4.

4.

Enclosure (4) to IE Bulletin 79-01B.

g 5.

For /3, the component is considered qualified if the /J dose of 2 x 10 Rads is reduced by shielding to 107,of the 3 dose

SYSTEM COMPONENT f.LUATION WORK SHEET I.

Sectica C.2.9 Joseph M. Farlsy Nucl;ar Plant Unit 1

Sheet _10 cf_

ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION OUAL*

OUTSTANDING PARAMETER SPEC.

QUAL SPEC.

QUAL METHOD ITEMS SYSTEM: Chemical & Volume Control OPERATING Simultaneous PLANT ID NO. NIE212S8149A TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous I FI Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSU RE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%1 100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N B03+

N BO3+

Simultaneous Indication SPRAY 3

3 Namt NnOH 1

4 Test None 7

ACCURACY: SPEC:

I= 5 x 10 d=1x108 1

RADIATION Rads Rads DEMON: Not applicable O= Nott 6 O = < 107. [

and Note 4 4

Sequential None SERVICE: Regen. Hx Shell Discharge AGING LOCATION: Containment Elev.105, Note 4 Note 3 Note 4 4

4 None D

FLOOD LEVEL ELEV: 115' SUBMER-2 ABOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None h

' DOCUMENTATION

REFERENCES:

NOTES:

1 J. M..Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 pela for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ra:np down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4 6.

For d, the component is con-4.

Enclosure (4) to IE Bulletin 79-01B.

sidered qgalified if the 6 dose 5.

Although this component may become submerEed following a postulated accident, its safety function will have been performed prior to its becoming submerged, hi Idi g t

7. of I d se.

and its further operation is not required.

9 SYSTEM COMPONENTO ' UATION WORK SHEET Q

Sectica

'C.2.9 W

Joseph M. Farley Nuclear Plant Unit i

Sheet 12 cf ENVIRONMENT DOCUMENTATION REF.

EOUIPMENT DESCRIPTION QUAT OUTSTANDING PARAMETER SPEC.

QUAL SPEC.

QUAL METHOD ITEMS SYSTEM: Chemical & Volume Control OPERATING Simultaneous PLANT ID NO.

NIE21ZS8149B TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TE MP-300 Simultaneous

( F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N BO3+

N B03+

Simultaneous Indication SPRAY 3

3 NaOH MnOH 1

4 Test None ACCURACY: SPEC:

$= 5 x 107 8

f = 1 x 10 RADIATION Rads Rads DEMON: Not applicable B = Note 6 d = < 107. 'd and Nota 4 4

Sequential None SERVICE: Regen. HX Shell Discharg AGING E

LOCATION: ContainmentElev.105' Note 4 Note 3 Note 4 4

4 None 2

R FLOOD LEVEL ELEV: 115' SUBMER.

O ABOVE FLOOD LEVEL: Na l G NCE Note 4 Note 5 None None None None i

o

' DOCUMENTATION

REFERENCES:

_ NOTES:_

1.

J. M..Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F frem ambient in 50 see.

2 J. M. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 0

3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 paia in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Model 16 pain in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4 6.

For O, the component is con-4.

Enclosure (4) to IE Bulletin 79-01B.

sidered alified if the 6 dose 5.

Although this e omponent may become cobmerged following a postulated accident, Its safety function will have bee +i performed prior to its becoming submerged, hiciding t 7.

f se.

and its further operation is not required.

'f SYSTEM COMPONENT I

'.UATION WORK SHEET T

S:ction C.2.9 hseph M. Farley Nuclear Plant Unit 1

Sheet 14 of ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION QUAL OUTSTANDING PA RAMETER SPEC.

QUAL.

SPEC.

QUAL.

METHOD.

ITEMS SYSTEM: Chemical & Volume Control OPERATING Simultaneous PLANT ID NO. NIE21ZS8149C TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous I II Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N BO3+

N BO3+

Simultaneous Indication SPHAY 3

3 NaOH Hn0H 1

4 Test None ACCURACY: SPEC:

I=5x10

'd= 1 x 108 1

RADIATION Ra DEMON: Not applicable o

6 O=

0, i and Note 4 4

Sequential None B.

SERVICE: Regen. HX Shell Discharge g

LOCATION: Containment Elev. 105' Note 4 Note 3 Note 3 4

4 None A

FLOOD LEVEL ELEV: 115' SUBMER.

O ABOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None h

' DOCUMENTATION

REFERENCES:

. NOTES:

1.

J. M..Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from' ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 0

3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per 6.

For O, the component is con-4.

Ec r

(4) to IE Bulletin 79-01B.

cidered qgatified if the 6 done 5.

Although this component may become submerged following a postulated ~ accident, its safety function will have been performed prior to its becoming submerEed, hi Idi g t 7.

f I Y

se.

and its further operation is not required.

Rev. 2

'[

SYSTEM COMPONENT LUATION WOf1K SHEET

(,

Scctica..'C.2.9 hseph M. Farley Nuclear Plant Unit i

Sheet 16 cf_ _ _

ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DE!CRIPTION OUAL OUTSTANDING PARAMETER SPEC OUAL SPEC.

QUAL METHOD ITEMS SYSTEM: Chemical & Volume Control OPERATING Simultaneous PLANT ID NO. Q1E212S8808AB TIME 4 hr.

E hr.

1 4

Test None COMPONENT:

Limit Switch TE MP-300 Simultaneous

( F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSU RE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CH M CAL N DO3+

N B03+

Simultaneous 3

3 Indication Naon Nnon 1

4 Test None 8

ACCURACY: SPEC:

'd= 5 x 10

'I= 1 x 10 RADIATION 1

DEMON: Not applicable

/3 =

6 O=

.f and Note 4 4

Sequential None SERVICE: CVCS 2'

LOCATION: Containment Elev. 107' Note 4 Note 3 Note 4 4

4 None 2~

R FLOOD LEVEL ELEV: 115' SUDMER.

O f

ABOVE FLOOO LEVEL: No GENCE Note 4 Note 5 None None None None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. N..Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambf.at in 50 see.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 mic.., dwell at 0

3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in I hr. 45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

Ei.-180 dated 11;21-77 3.

Thermally aged at 200 F for 2(0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4 6.

For O, the component is con-4.

Enclosure (4) to IE Bulletin 79-01B.

sidered qgalified if the d dose 5.

Although this component may become submerged following a postulated accident, of 2 x 10 Rads is reduced by its safety function will have been performed prior to its becoming submerged,

~

shiciding to 107. of the Y dose.

and its further operation is not required, nn..

o

(

SYSTEM COMPONEC3

  • QMMfGR) W51!K SHtt I y5 S:ctiem C.2.9 Sheet 17 cf Joseph M. Farley Nuclear Plant Unit 1

ENVIRONMENT DOCUMENTATION REF.*

OUAL*

OUTSTANDING EOUIPMENT DESCRIPTION METHOD 11 EMS PARAMETER SPEC.

QUAL SPE C.

QUAL SYSTEM: Chemical & Volume Control OPERATING Simultaneous TIME PLANT ID NO. Q1E212S8808BB 4 hr.

6 hr.

1 4

Teet None COMPONENT:

Limit Switch TE MP-300 Simultaneous (OF)

Note 1 340 2

4 Test None MANUFACTURE R: Namco Controls PRESSU RE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' R ELATIVE Simultancous HUMIDITY (%)

100 100 1

4 Teot

one FUNCTION
Valve Position CHEMICAL N BO3+

N B03+

Simultaneoun SPHAY 3

3 NnO11 NnO11 1

4 Test None Indication 8

ACCURACY: SPEC:

I = 5 x 10 d = 1 x 10 I

RADIATION Rads da(Rads 107.fand Note 4 4

Sequential None DEMON: Not applicable d= Note 6 SERVICE:

CVCS AGING LO'ATION: Containment Elev.107' Note 4 Note 3 Note 4 4

4 None FLOOD LEVEL ELEV: 115' SUDMER.

ABOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 se 2.

J. M, Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr._7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec'., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 pain in i hr.-45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11121 77 3.

Themally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correintion betecen these conditions and the qualified life is not known per Reference 4*

6.

For O, the component is con-gg g)

E hHdh M-ML component may become submerged following a postulated sccident sidered qgalified if the 6 dose c

Although thi.1 5.

its safety function vill have been performed prior to its becoming submergedc hi Idi g t

7. of se.

.,and its further operation is not required.

Rev. 2

f SYSTEM COMPONENT I.LUATION WORK SHEET f

Section~

.'C.2.9 Joseph M. Farley Nuclear Plant Unit t

Sheet 18 cf ENVIRONMENT DOCUMENTATION REF.

QUAL OUTSTANDING EOUIPMENT DESCRIPTION PAR AMETE R SPEC.

QUAL SPEC.

QUAL METHOD ITEMS SYSTEM: Chemical & Volume Control OPER A1;NG Simultaneous TIME PLANT ID NO. Q1E21ZS8808CB 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous

( F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMDER: EA.180' RELATIVE Sicultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultaneous Indication SPRAY 3

3 Nn0H Mn0H 1

4 Test Nonu ACCURACY: SPEC:

D = 5 x 10 d=1x100 I

RADIATION Rads DEMON: Not applicable O = Rads d=4107,f and Note 4 4

Sequential None Note 6 SERVICE:

CVCS AGING g

LOCATION: Containment Elcy. 107, Note 4 Note 3 Note 4 4

4 Ncne i

FLOOD LEVEL ELEV: 115' SUDMER-C ABOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None NOTES:

' DOCUMENTATION

REFERENCES:

1.

J. M..Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 br.-7 c'in., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr. 45 min., ramp dswa to Controls Limit Switch Model 16 psia in 11.5 days.

EA-1SO dated 11121-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per 6.

For O, the component is con.

4.

Enclosure (4) to IE Bulletin 79-01B.

sidered q alified if the 6 dose Although this component may become submerged following a postulated accident, 5.

of 2 x 10 Rads is reduced by its nafety function will have been performed prior to its becoming submerged, chielding to 107. of the Y dose.

and its further operation is not required.

(

(*

SYSTEM COMPONEN: dVALUATION WOftK SHEET i

Joseph M. Farley Nuclear Plant Unit 1

Section C.2.12' Sheet 3

of

~

l ENVIRONMENT routnma DESCRIPTION DOCUMENTATION REF.'

s O'JTSTANOlm PAR AMETE R SPEC.

QUAL SPEC.

OUAl.,

METHOD ITEMS SYSTEM: Liquid Haste Disposal OPERATING PLANT ID NO. Q1G21ZS3376 TIME Simultaneous 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 l F)

Simultaneous Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 (PSIA)

Simultaneous Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RE LATIVE Simultaneous HUMID!TYl%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Indication SPRAY 3

3 Simultaneous Nnnli Nnnit 1

4 Test None ACCURACY: SPEC:

X= 5 x 10 I - 1 x 100 DEMON: Not applicable RADIATION Rnds Rads I

S = Note 6_' 0=4 10'4 $

and Note 4 4

Sequential N6ne SERVICE: Ctmt. Sump Discharge LOCATION: Containment El. 105' AGING Note 4 Note 3 Note 4 4

4 None FLOOD LEVEL ELEV: 115' SUBMER.

ABOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None

' DOCUMENTATION

REFERENCES:

_ NOTES:

1.

J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300'F from ambient in 50 set 2

J. M. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in i hr.-7 min., dwell at 3.

J. M. Farliy FSAR Figure 6.2 4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme. Cleveland Development Co.

2 Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualificaticn Report for NANCO controls Limit Switch Model 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to 16 psia in 11.5 days.

EA.180 dated 11 21-77 3.

' thermally aged at 200,F for 200 h'ours per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per side ed'q a if f h /3 O'

n 1 e re 4) to IE Bulletin 79-018.

se of 2 x 10 Rads is reduced by 5.

Although this component may become submerged following a postulated accident, shielding i.., 107. of the */ dose.

its safety function will '..e been performed prior to its becomina subnereed.

J f(A_

P SYSTEM COMPONENM: VAL.UATION WORK SHEET Joseph M. Farley Nuclear Plant Unit 1

Sheet 4

of S:ction C.2.12 ENVIRONMENT DOCUMENTATION REF.*

JAL, OUTETANDING PARAMETER SPEC.

QUAL.

SPE C.

QUAL.

METHOO ITEMS SYSTEM: Liquid Waste Disposal OPERATING PLANTID NO. NIG21ZS1003 TIME Simultaneous 4 hr.

6 hr.

1 4

Test Nana COMPONENT:

Limit Switch TEMP.

300 i F)

Simultaneous Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 (PSIA)

Simultaneous Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE HUMIDITY (%)

Simultaneous 100 100 1

4 Teat None FUi4CTION: Valve Position CHEMICAL H B03+

H B03+

Indication SPRAY 3

3 Simultaneous Nn0H HnOH 1

4 Test None ACCURACY: SPFC:

X = 5 x 10 I - 1 x 108 DELON: Not applicable RADIATION Rads Reds I

d = Note 6_' 0 = 4 07. 8 and Note 4 4

Sequential Mona 1

SERVICE: Reac. Cool DRN Tk. Disch.

LOCATION: Containment E1. 105'

^U"U Hote 4 Note 3 Note 4 4

4 Nona FLOOD LEVEL ELEV: 115' SUDMER.

-[

ABOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. M. Farley FSAR Table 3.11 1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec<

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Far1Ey FSAR Figure 6.2-4 180"F for 6 hrs.-36 min.. ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2 Pressure profile from Reference 3 Ramp up to 62.2 psia in 40 see., dwell at Qualification Report for NAMCO Controls Limit Switch Hodel 62.2 psia for 6 min., ramp down to 26.7 psia in i hr.-45 min., ramp down to 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

' thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified lifa is not known per 6

For O, the coveponent is con-sidered q alified if the /3 dose 4

Enclosure (4) to TE Bulletin 79-018 of 2 x 10 Rads is reduced. by Although this component may become submerged following a postulated accident, 5.

    • .--r.... r..- - - a.-

e$'

t---

- ~ ~

fI T

y SYSTEM COMPONEN: tVALUATION WOf1K SHEET Srction C.2.12 Joseph M. Farley Nuclear Plant Unit i

Sheet 7

of ENVIRONMENT DOCUMENTATION REF.'

t30AL, OUT&TANDlMG PA RAMETE R SPE C, OUAL.

SPEC.

QUAL.

METHOD NI SYSTEM: Liquid Waste Disposal OPE R ATING PLANT ID NO. Q1G212S7126 TIME Simultaneous 4 hr.

6 hr.

1 4

Teet Nene COMPONENT:

Limit Switch TEMP.

300 I F)

Simultaneous O

Note 1 340 2

4 Test Noes MANUCACTURER: Namco Controls PRESSURE 62.2 (PSIA)

Simultaneous Note 2 70 3

4 Test None MODEt NUMBER-EA-180 RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL H B0 Indication SPRAY 3

3+

H B03+

3 Simultaneous NnOH NnOH 1

4 Test None ACCURACY: SPEC:

K= 5 x 10 I - 1 x 108 DEMON: Not applicable RADIATION Rads Rads I

O-Note 6

  • 13-410% 8 and Note 4 4

Sequential None SERVICE: Rene Cool DN Tank Out

^U '" O LOCATION: Containment El. 105' Note 4 Note 3 Note 4 4

4 None FLOOD LEVEL ELEV: 115' SunuER-ADOVE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None

' DOCUMENTATION

REFERENCES:

_ NOTES:

1 J. M. Farley FSAR Table 3.11-1 1.

Temperature profile frma Reference 2.

Ramp up to 300 F from ambient in 50 see 2

J. M. Farlay FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farls'y FSAR Figure 6.2 4 180*F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme-Cleveland Development Co.

2 Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAHC0 62.2 psia for 6 min., ramp down to 26.7 pain in 1 hr.-45 min., ramp down to Controle Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21 77 3.

'Ihermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per 6.

For O, the component is con-

  • **""** 4*

4.

Enclosure (4) to TE Bulletin 79-01B.

sidered ggalified if the a dose 5.

Although this component may become outmerged following a postulated accident, of 2 x 10 Rads is reduced by shieldina to 101 nr n. V,s..

Its safety function will have been nerformed erfor to its becomine subewrend.

I (

r i

SYSTEM COMPONL 2 VALUATION WORK SHEET S:ction C.2.12 Joseph M. Farley Nuclear Plant Unit 1

Sheet 9

of ENVIRONMENT DOCUMENTATION REF.

EOUIPMENT DESCRIPTION QUAL OUTSTANDINC PARAMETER SPEC.

QUAL.

SPE C.

QUAL METHOD ITEMS SYSTEM: Liquid Waste Disposal OPERATING Simultaneous PLANT ID NO..Q1G21SV3376-B/JB TIME 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

300 NEHA 4 Enclosure

{ F)

Note 1 307 2

4 None MANUFACTURER: States Company PR ESSURE 62.2 (PSIA)

Fate 2 80 3

4 None MODEL NUMBER:

RELATIVE Type ZWH HUMIDITY (%)

100 100 1

4 None Catalog H-25012 FUNCTION: Conductor Termination CHEMICAL N B03+

N B03+

SPRAY 3

3 I

4 OH NaOH Y

N "*

m ACCURACY: SPEC:

[=5x10' [=1x10" DEMON: Not Applicable RADIATION R

R a 3

SERVICE: Electrical Safety Systems AGING LOCATION: Containment El.105'-6" Note 3 40 years None 4

Sequential None FLOOD LEVEL ELEV: 115' SUOM E R-ADOVE FLOOD LEVEL: No GENCE Note 3 Note 4 None None None None

' DOCUMENTATION

REFERENCES:

_ NOTES:

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300"F from ambient in 50 se 2

J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H.'F riey FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Wyle tr% oratories NEQ Test Report 2 Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at 44354-1 dated 3-8-79 62.2 psia for 6 min., ramp down to 26.7 psia in I h4.-45 min., ramp down to 16 psin in 11.5 days.

3.

Enclosure (4) to IE Bulletin 79-01B.

4 Although this component may become submerged following s postulated accident, its safety function will have been performed prior to its becoming submerged, and its further operation is not required.

5.

For /3, the component is considered qualified if the [ dose of 2 x 10 Radr is reduced by shiciding to 107. of the y dose.

(

SYSTEM COMPONi. PEVALUATION WORK SHEET f'

Section C.2.12 Eseph M. Farley Nuc! car Plant Unit 1

Sheet 10 of ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF.*

OUAL OUTSTANDIN PARAMETER SPEC.

QUAL.

SPEC.

QUAL p,1ET HOD ITEMS SYSTEM: Liquid Waste Disposal OPERATING Simultancouc PLANT ID NO. N1G21SV1003A-A/JB TIME 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

300 NEMA 4 Enclosure

( F)

Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 62.2 (PSIA)

Note 2 80 3

4 None MODEL NUMBER:

RELATIVE Type ZWM HUMIDITY (%1 100 100 1

4 None Catalog H-25012 FUNCTION: Conductor Termination CHEMICAL N B03+

N DO3+

3 3

NaOTI Nn011 y

None ACCURACY: SPEC:

(= 5 x 10' g=1x10" 1

DEMON: Not Applicable RADIATION Ra Rads g

3 SERVICE: Electrical Safety Systems LOCATION: Containment El.105'-6" AGING Note 3 40 years None 4

Sequentint None FLOOO LEVEL ELEV: 115' SUD M E R-ADOVE FLOOD LEVEL: No GENCE Note 3 Note 4 None None None None

' DOCUMENTATION ht EF ER ENCES.

NOTm 1.

J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2 Ramp up to 300 F from ambient in 50 e 2.

J. M. Farley FSAR Figurc 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 Jirs.-56 min., ramp to 112 F in 11.5 days.

4.

Wyle Laboratories NEQ Test Report 2 Pressure profile froni Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell s 44354-1 dated 3-8-79 62.2 psia for G min., ramp down to 26.7 psia in 1 h4.-45 min., raep down to 16 psia in 11.5 days.

3.

Enclosure (4) to IC Bulletin 79-01D.

4 Although this component may become submerged following a postulated accident its safety function will have been performed prior to its becoming submerged and its further operation is not required.

8 5.

For M, the component is conoidered qualified if the [ dose of 2 x 10 Rad.

is reduced by ohiciding to 107, of the y dose.

' {

SYSTEM COMPON.r-. EVAt.UATION WOttK SHEET (m

8 Secticn C.2.12 J:seph M. Farley Nuct:ar Plant Unit 1

Sheet 11 cf ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION R' 5.*

OUAL.

OUTSTAND PARAMETER SPEC OUAL SPEC.

QUA -

METHOD '

ITEMS SYSTEM: Liquid Waste Disposal OPERATING Simultancout PLANT ID NO. NIG21SV7126-A/JB TIME 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 7 days 1

4 Test None COMPONENT: Terminal Block u 5

TEMP.

300 NEMA 4 Enclosure I F3 Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 62.2 (PSIA)

Note 2 80 3

4 None MODEL NUMBER:

~

RELATIVE Type ZWM HUMIDITY (E 100 100' 1

4 None Catalog M-25012 FUNCTION: Conductor Termination CHEMICAL N B03+

N B03+

3 3

Nn011 Nn011 Y

ACCURACY: SPEC:

g= 5 x 10' ( = 1 x 10" DEMON: Not Applicable RADIATION A==

5 8=<

.y and Note 3 A

Sequential None SERVICE: Electrical Safety Systems LOCATION: Containment E1.105'-6u AGING Note 3 40 years None 4

Sequential None FLOOD LEVEL ELEV: 115' SUDMER.

ADOVE FLOOD LEVEL: No GENCE Note 3 Note 4 None None None Nonc

' DOCUMENTATION

REFERENCES:

_ NOTES:

1.

J. M. Farley FSAR Tabic 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300'F from ambient in 50 2.

J. H.,Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell C 3.

J. M. Faricy FSAR Figure 6.2-4 180 F for 6, hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Wyle Laboratories NEQ Teot Report 2 Pressure pr6 file from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell 44354-1 dated 3-8-79 62.2 psia for 6 min., ramp down to 26.7 poia in 1 h4.-45 min., ramp down t' 16 psia in 11.5 days.

3.

Enclosure (4) to IE Dulletin 79-01B.

4 Although this component may become submerged following a postulated accider its safety function will have been performed prior to its becoming submerge and its further operation is not required.

8 5.

For [3, the component is considered qualified if the [ dose of 2 x 10 Re is reduced by shiciding to 107. of the y dose.

SYSTEM COMPONENT EN y

~

UATION WORK SHEET hW Joseph M. Farley Nucl:ar Plant Unit 1

Secticn C.2.13 yheet_ 35 cf_

ENVIRONMENT DOCUMENTATION REF.

QUAL OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL.

METil0D ITEMS SYSTEM: Main Steam OPERATING PLANT ID NO. Q1NilSV3369AA-A/JB TIME Simmsitaneous 10 min'.

7 days 1

4 Test None COMPONENT: Terminal Block with TEMP

  • 308 NENA 4 Enclosure i F3 Note 1 307 2

4 None MANUFACTURER: 8tates Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-None MODEL NUMBER:

RELATIVE Type ZWM HUMIDITY (%)

100 100 3

4 None Catalog M-25012 TUNCTION: Conductor Termination CHEMICAL N B03+

3 SPRAY None None 4

pg y

None ACCURACY: SPEC:

Not Applicable RADIATION DEMON:

/3 - <Rada107. g None 4

Sequentini None None SERVICE: Electrical Safety Systemn LOCATION: Aux. Bldg.

g Note 3 40 years None 4

Sequential None a

FLD0D LEVEL ELEV:

SUDMER-k Not Applicable ABOVE FLOOD LEVEL:

GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

__NOT E S:

1.

J. M. Farley FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp up to 308.4 F in 0.3, sec.,

2 Bechtel calculation 325-25-7597 from ramp down to 300 F in 0.4 sec., dwell at 300 F for 0.6 oce., step down Computer Run T-10576 and dwell at 214,F until terminntion of event.

3 J. M. Farley FSAR Chapter 3, 2.

Pressure profile from Reference 2 Ramp up to 20.5 psia in 0.1 oce.,

Appendix 3K ramp down to 18.4 psia in 0.6 occ., dwell at 18.4 pain for 0.55 sec.,

4. 'Wyle Laboratories NEQ Test Report step down and dwell at 15.5 pain until terminntion of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01D.

e Rev. 2

(

SYSTEM COMPONENT El LUATION WORK SHEET h5 Joseph M. Farley Nuclear Plant Unit 1

Section C.2.13 Sheet __ 3 6 of I

ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF.

QUA1 OUTSTANDING P RAMETER SPEC.

QUAL.

S PE C.

QUAL.

METHOD ITEMS SYSTEM: Main Steam OPERATING Sismitaneous PLANTID NO. Q1N11SV3369BA-A/JB TIME 10 mirr.'

7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

308 NEMA 4 Enclosure i Fl Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 20.5 i

(PSIA)

Note 2 80 2

4-None MOOEL NUMBER:

RELATIVE Type ZWM HUMIDITYl%)

100 100 3

4 None Catalog M-25012 TUNCTION: Conductor Terininstion CHEMICAL N D03+

3 SPHAY none none 4

y None ACCURACY: SPEC:

/3-<Habs Not Applicable RADIATION DEMON:

Nonc 107.g None 4

Sequential None

)

' SERVICE: Electrical Safety Systeeri LOCATION: Aux. Bldg.

AGING Note 3 40 years None 4

Sequential None Not Applicable h

FLOOD LEVEL ELEY:

SUOMER.

ABOVE FLOOD LEVEL:

GENCE p/A N/A N/A N/A

'U,

' DOCUMENTATION

REFERENCES:

-NOTES:

1 J. M. Farley FSAR Section 3K-4.1.1.10 1.

Temperature proffic from Reference 2.

Ramp up to 308.4 F in 0.3 sec.,

2 Bechtel Calculation 525-25-7597 from ramp down to 300 F in 0.4 nee., duell nt 300 F for 0.6 acc., step down Computer Run T-10576 and dwell at 214 F until terminnLion of event.

3.

J. H. Faricy FSAR Chapter 3, 2,

Preneure profile from Reference 2 Ramp up to 20.5 psin in 0.1 sec.,

Appendix 3K ramp down to 18.4 psia in 0.6 occ., dwell at 18.4 pela for 0.55 sec.,

4. ~ Wyle Laboratories NEQ Test Report step down and dwell at 15.5 pain until terminntion of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-010.

Rev. 2

(

fQ SYSTEM COMPONENT EVALUATION WORK SHEET Section C.2.13 Joseph M. Farley Nuclear Plant Unit i

gheet 37 or ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIFTION QUAL.

OUTSTANDING PARAMETER SPEC.

OUAL.

SPEC.

QUAL METil0D 31LMS SYSTEM: Main Stears OPERATING Simultaneoun PLANT ID NO. Q1N11SV3369CA-A/JD TIME 10* min.

7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

308 NEHA 4 Enclosure i FI Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-Hono MODEL NUMBER:

RELATIVE

' Type ZWM IfUMIDITY (%1 100 100 3

4 None Cetalog M-25012 TUNCTION: Conductor Termination CilEMICAL N B03+

SPRAY None 3

None 4

Y None NWI ACCURACY: SPEC:

Not Applicable RADIATION

/3 - <Ita107.y None 4

Sequentini None a

DEMON:

None SERVICE: Electrical Safety Systemo g

LOCATION: Aux. Bldg.

Noto 3 40 years None 4

Sequential Nons R

FLOOD LEVEL ELEV:

SUDMER-2 t Applicable GENCE N/A N/A N/A N/A N/A None U

ADOVE FLOOD LEVEL:

l0

  • DOCUMENTATlON REF ERENCES:

_ NOTE S:_

'1 J. H. Farley,FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp up to 308.4 F in 0 3 sec.,

and dwell at 214,F in 0.4 sec., dwell nt 300 F for 0.6 sec., step down ramp down to 300 2

Bechtel Calculation 525-25-7597 from F until termination of event.

computer Run T-10576 3.

J. H. Faricy FSAR Chapter 3, 2.

Pressure profile from Reference 2.

Ramp up to 20.5 pain in 0.1 sec.,

Appendix 3K ramp down to 18.4 pela in 0.6 nee., dwell at 18.4 pain for 0.55 sec.,

4.

Wyle Laboratories NEQ Test Report step down and dwell at 15.5 poln until termination oE event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Ilulletin 79-01B.

Rev. 2

(

r, SYSTEM COMPONENT EW. dATION WORX SHEET Section C.2.13 Joseph M. Farley Nuclear Plant, Unit 1

5, hoot 41 of ENVIRONMENT EQUIPMENT DESCRIPTION DCuuMENTATION REF.

QUAL OUTSTANDING PARAMETE R SPEC OUAL.

SPEC.

QUAL.

METHOD ITEMS SYSTEM: Main Steam OPERATING S tensitaneoun

. PLANT ID NO. Q1N11SV33 70AA-A/JB TIME 10 min.

7 days 1

4 Teet Nona COMPONENT: Terminal Block with TEMP.

308 NEMA 4 Enclosure i Fl Note 1 307 2

4 None

- MANUFACTU RER: States Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-None MODEL NUMDER:

RE LATIVE Type ZWH HUMIDITY (%)

100 100 3

4 None Catalog H-25012 TUNCTION: Conductor Termination CHEMICAL h.,03+

SPRAY None 3

None 4

1/

Nonc Nn011 i

P ACCURACY: SPE

g. 1 x IO Not Applicablo RADIATION None 4.,

(y None 4

Sequential None SERVICE: Electrical Safety Systemri g

g LOCATION: Aux. Bldg.

Noto 3 40 years None 4

Sequential Nono R

FLDOD LEVEL ELEV:

SUDMER-n

! t Applicable 7

ADOVE FLOOD LEVEL:

GENCE N/A N/A N/A N/A N/A None

]

8 DOCUMENTATION R EFERENCES:

NOTES:

1.

J. M. Farley,FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp gp to 308.4 F in 0.3 sec.,

2.

Bechtel Calculation 525-25-7597 from ramp down to 300 F in 0.4 nec., dwell at 300 F for 0.6 sec., step down Computer Run T-10576 nnd dwell at 214 P until termination of event.

3.

J. H. Farley FSAR Chapter 3, 2

Prennure profit e from Re ference 2.

Rnmp up to 20.5 pain in 0.1 oce.,

Appendix 3K ramp down to 18.4 pain in 0.6 oce., dwell at 18.4 pain for 0.55 sec.,

4.

Myle Laboratories NEQ Test Report step down and dwell at 15.5 pain until terminntion of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Bulletin 79-01n.

Rev. 2

(

F SYSTEM COMPON'ENT EVN.UATION WORK SHEET i

Secticn C.2.13 J:seph M. Farley Nuclear Plant Unit i

42 of gheot ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION OUAL.

OUTSTANDING e

PARAMETER SPE C.

QUAL.

SPEC.

QUA1 METHOD 3ycg5 SYSTEM: Main Steam OPERATING S1:nultaneous PLANT ID NO. Q1N11SV3370BA-A/JD TIME i g,3 g.n.

7 daya 1

4 Teat Nono COMPONENT: Teristnal Block with TEMP.

308 NEMA 4 Enclosure

( F)

Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-Hono MODEL NUMBER:

RELATIVE Type ZWH HUMIDITY (%)

100 100 3

4 None Catalog M-25012 ruNCTION: Conductor Tetuination C'lEMICAL N B03+

3 None 4

/

Nono SPRAY None ACCURACY: SPEC:

Not Applicablo RADIATION

/J., <Rng g7, g.

None 4

Sequential None n

DEMON:

None I

l SERVICE: Electrical Safety Systemo g

LOCATION: Aux. Bldg.

Notn 3 40 years None 4

Sequential Nono R

FLOOD LEVEL ELEV:

SUDMER-y HM W11Mle GENCE N/A N/A N/A N/A N/A None 9

ADOVE FLOOD LEVEL:

id CDOCUMENTATION

REFERENCES:

_NOTEst 1

J. M. Farley,FSAR Section 3K-4.1.1.10 1.

Temperature profgle from Reference 2 Ramp up to 308.4 F in 0,.3 sec.,

and dwell at 214,F in 0.4 nee., dwell nt 300 F for 0.6 sec., step down rnmp down to 300 2

Bechtel Calculation 525-25-7597 from F until termination of event.

Cooputer Run T-10576 3..

J. H. Farley FSAR Chapter 3, 2.

Pressure profile from Reference 2 Rnmp up to 20.5 psin in 0.1 nee.,

Appent',1x 3K ramp down to 18.4 poia in 0.6 nee., dwell at 18.4 pata for 0.55 sec.,

4.

Wyle Laboratories NEQ Test Report step down and dwell at 15.5 psia untti o rminntion of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01B.

Rov. ?

(

SYSTEM COMPONENT E

.UATION WORK SHEET D

v -

Section C.2.13 Joseph M. Farley Nuclear Plant Unit i

Sheet 43 cf I

ENVIRONMENT DOCUMENTATION REF.

QUAL.

OUTSTANDING PARAMETE R SPEC.

QUAL.

SPEC.

QUAL METliOD ITiMS SYSTEM: Main Steam OPERATING Simultaneous PLANT lD NO. Q1N11SV3370CA-A/JB TIME 10 min.

7 days 1

4 Test None 1

COMPONENT: Terminal Block with TEMP.

308

!!EHA 4 Enclosure I FI Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 20.5

[ PSIA)

Note 2 80 2

4-None i

MCDEt. NUMBER:

RELATIVE TYPE ZWH liUMID4TY (%)

100 100 3

4 None Catalog M-25012 TUNCTION: Conductor Temination CH MICAL g

N DO) +

pg AMRACY: SPEC:

d-<nba Not Applicable RADIATION DEMON:

Nonc 107.f Hone 4

Sequential None SERVICE: Electrical Safety Systemr1 LOCATION: Aux. Bldg.

Note 3 40 years None 4

Sequential None a

FLOOD LEVEL ELEV:

SUDMER.

b Not Applicable ADOVE FLOOD LEVEL:

GENCE 11/A N/A N/A N/A N/A Hone

]

(DOCUMENTATION R EFERENCES:

_ NOTES:

1 J. H. Farley TSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp gp to 308.4 r in 0.3 sec.,

2 Dechtel Calcuintion 525-25-7597 from ramp down to 300 F in 0.4 sec., dwell at 300 F for 0.6 sec., step down Computer Run T-10576 and dwell at 214 F until termination of event.

3 J. H. Farley FSAR Chnpter 3, 2.

Pressure profile from Reference 2 Rnmp up to 20.5 pain in 0.1 sec.,

Appendix 3K ramp down to 18.4 pain in 0.6 sec., dwell at 18.4 pain for 0.55 sec.,

4.

Wyle Laboratories NEQ Test Report step down and dwell at 15.5 psia until termination of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01D.

Rev. 2

(

SYSTEM COMPONENT E t.UATION WORK SHEET Joseph M. Farley Nuclear Plant Unit 1

Section C.2.13 Sheet 44 of_

-I ENVIRONMENT EOUIPMENT DESCRIPTION DOCUMENTATION REF.

QUAT OUTSTANDING PARAMETER SPEC.

QUAL.

S PE C.

QUAL.

METHOD MMS SYSTEM: Main Steam OPERATING PLANT ID NO. Q1N11SV3368AA-A/JB TIME S tanultaneouc 10 min.

7 days 1

4 Teet None COMPONENT: Terminal Block with TEMP.

308 NENA 4 Enclosure i FI Note 1 307 2

4 None MANUFACTURER: States Coc:pany PRESSURE 20.5 (PSIAl Note 2 SO 2

4-None MODEL NUMBER:

RELATIVE Type Z'JH HUMIDITY (%)

100 100 3

4 Hone Catalog H-25012 I" UNCTION: Conductor Temination CHEM. CAL H B03+

SPRAY None 3

Non,c 4

Un011 hf Hono ACCURACY: SPEC:

Not Applicable RADIATION DEMON:

/3. (Rnt o7, g None 4

Sequential None a

None SERVICE: Electrical Safety Systemr1 LOCATION: Aux. Bldg.

g Note 3 40 years None 4

Sequential Nono a

FLOOD LEVEL ELEV:

SUDMER.

2 Not Applicable 9

ADOVE FLOOD LEVEL:

GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

]

_NOT E S:

1 J. H. Farley FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Rnmp gp to 308.4 F in 0.3 eee.,

2 Bechtel Calculation 525-25-7597 from ramp dcun to 300 F in 0.4 sec., dwell at 300 F for 0.6 sec., step down Computer Run T-10576 and dwell at 214 F until termin.stion of event.

3 J. M. Faricy FSAR Chapter 3, 2.

Frensure profile from Reference 2.

Ramp up to 20.5 pain in 0.1 oce.,

Appendix 3K ramp down to 18.4 pain in 0.6 acc., dwell at 18.4 pain for 0.55 sec.,

4 Wyle Laboratories NEQ Test Report step down and dwell at 15.5 puin until termination of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE nulletin 79-01D.

Rev. 2

g - ---

SYSTEM COMPONENT E\\..t.UATION WORK SHEET Section C.2.13 J:seph M. Farley Nuclear Plan) Unit 1

pbcet_ 45 of i

ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION RFT.

OU AL..

OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL.

METHOD gycm5 SYSTEM: Main Steam OPERATING Simultaneous PLANT ID NO. Q1N11SV3368BA-A/JB TIME 10 min.

7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

308 NFNA 4 Enclosure i FI Note 1 307 2

4 None MANUFACTURER: States Ct,mpany PR ESSURE 20.5 IPSIA)

Note 2 80 2

4-Hone MODEL NUMBER:

RELATIVE t

Type ZWM HUMIDITY {%)

100 100 3

4 None I,

Cztalog H-25012 TUNCTION: Conductor Termination CHEMICAL N DO3+

SPRAY None 3

None 4

/

None Ung11 1

ACCURACY: SPEC:

Not Applicable RAOIATION

/3 - <Rn n107. y None 4

Sequential None DEMON:

None SERVICE: Electrical Safety Systemo

^U I"U LOCATION: Aux. Bldg.

Hnte 3 40 years None 4

Sequential Nono R

FLOOD LEVEL ELEV:

SUDMER.

U Not Applicable GENCE N/A N/A N/A N/A N/A None ADOVE FLOOD LEVEL:

'DOCUMENTATI0N

REFERENCES:

_ NOTES:

1.

J. H. Farley FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2 Ramp up to 308.4 F in 0.3 sec.,

2 Dechtel Cniculation 525-25-7597 from rnmp down to 300"F in 0.4 nec., dwell at 300 F for 0.6 sec., n'tep down Computer Run T-10576 and dwell at 214,F until terminntion of event.

3.

J. H. Parley FSAR Chapter 3, 2.

Pressure profile from Reference 2.

Rnmp up to 20.5 psin in 0.1 oce.,

Appendix 3K ramp down to 18.4 poia in 0.6 occ., dwell at 18.4 pain for 0.55 sec.,

4.

Wyle Laboratories NEQ Test Report step down and dwell nt 15.5 pnin until terminntion of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01B.

Rev. 2

.(

SYSTEM COMPONENT E.

.UATION WORK SHEET Y

Joseph M. Faley Nuclear Plant Unit 1

Section C.2.13 Sheet 46 of l

ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF.'

OUAL.

OUTSTANDING

QUAL.

SPEC.

QUAL.

METHOD SYSTEM: Main Steam OPERATING Simultaneous PLANTID NO. Q1N11SV3368CA-A/JB TIME 10 min."

7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

308 NEHA 4 Enclosure I FI Note 1 307 2

4 None MANUFACTURER: States Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-None MODEt. NUMBER:

REl.ATIVE Type ZWH HUMIDITY (%)

100 100 3

4 None Catalog M-25012 I" UNCTION: Conductor Temination CHEMICAL N D03+

SPilAY None 3

None 4

Nc0ft f

Nono ACCURACY: SPEC:

/3.<Rnbn Not Applicable RADIATION DEMON:

None 107, y None 4

Sequential None SERVICE: Electrical Safbty Systemo LOCATION: Aux. Bldg.

AGING S

Note 3 40 years None 4

Sequential None a

FLOOD LEVEL ELEV:

SUBME R-k ABOVE FLOOD LEVEL: Not Applicable GENCE N/A N/A N/A N/A N/A Ncne h

10

' DOCUMENTATION REFERENCES.

NOTES:

1 J. M. Farley FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp gp to 308.4 F in 0.3.sec.,

j 2

Bechtel Calculation 525-25-7597 from ramp down to 300 F in 0.4 sec., dwell at 300 F for 0.6 sec., st ep down Computer Run T-10576 and dwell nt 214 F~until terminntion of event.

3.

J. M. Farley FSAR Chapter 3, 2.

Fressure profile from Reference 2 Ramp up to 20.5 psia (n 0.1 sec.,

, Appendix 3K 4

ramp down to 18.4 pain in 0.6 sec., dwell at 18.4 psia for 0.53 sec.,

4 Wyle Laboratories NEQ Test Report step down and dwell nt 15.5 pnin until temination of event.

44354-1 dated 3-8-79 3.

Encionure (4) to IE Dulletin 79-01B.

Rev. 2

y (7 SYSTEM COMPONENT E\\

UATION WORK SHEET i

w Section C.2.13 huph M. Farley Nuclear Plant Unit 1

Sheet 47 of e

-1 ENVIRONMENT DOCUMENTATION REF.'

EQUIPMENT DESCRIPTION METHOD' ITEMS OUAL OUTSTANDING SPEC.

QUAL.

SYSTEM: Main Steam OPERATING Sinultaneous PLANT ID NO. Q1N11SV3976A-B/JD TIME 10 min.

7 days 1

4 Test None COMPONENT: Terminal Block with TEMP.

308 NEMA 4 Enclosure

( F)

Note 1 307 2

4' None MANUFACTURER: States Company PRESSURE 20.5 (PS!A)

Note 2 80 2

4-None MODEL NUMDER:

RELATIVE Type ZWM HUMIDITY (%)

100 100 3

4 None Catalog H-25012 TUNCTION: Conductor Termination CHEMICAL N D03+

SPRAY None 3

None 4

V

- None NaD11 E. CURACY: SPEC:

/3.<Hn)n Not Applicablo RADIATION DEMON:

None g o7, y None 4

Sequential None SCRVICE: Electrical Safety Systemti g

LOCATION: Aux. Bldg.

Noto 3 40 years None 4

Sequential None R

FLOOD LEVEL ELEV:

SUDMER-No M ble ADOVE FLOOD LEVEL:

GENCE N/A N/A N/A N/A h/A None 9

10

  • DOCUMENTATION

REFERENCES:

_ NOTES:

1 J. H. Farley FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2 Ramp up to 308.4 F in 0.3 sec.,

2 Bechtel Calculation 525-25-7597 from ramp down to 300 and dwell at 214,F in 0.4 nee., dwell at 300 F for 0.6 sec., etcp down Computer Run T-10576 F until termination of event.

3.

J. H. Farley FSAR Chapter 3, 2.

Pressure profile from Reference 2 Ramp up to 20.5 psin in 0.1 acc.,

Appendix 3K ramp down to 18.4 pain in 0.6 nee., dwell at 18.4 psia for 0.55 ~sec.,

4.

Wyle Laboratories NEQ Test Report step down and dwell at 15.5 pain until termination of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Dulletin 79-01B.

Rev. 2

n

(

SYSTEM COMPONENT E1.cVATION WOf1K SHEET

{ 'N :

Section C.2.13 J;seph M. Farl;y Nuclear Plant Unit i

Shoet 48 of W

ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF*

OUAL*

OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

OUAL MEillOD ITEMS SYSTEM: Main Steam OPERATING Simultaneous PLANT ID NO. Q1N11SV3976B-B/JB TIME 10 min.

7 days 1

4 Teat None COMPONENT: Terminal Block with TEMP.

308 NENA 4 Enclosura i FI floto 1 307 2

4 None MANUFACTURER: States Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-None MODEL NUMBER:

RELATIVE Type ZWH IlUMIDITY (%l 100 100 3

4 None Catalog H-25012 FUNCTION: Conductor Termination CHEMICAL None N D03+

None SPRAY 3

4 p

None ACCURACY: SPEC:

Not Applicable RADIATION

/J. <Radag o7, g None 4

Sequential None DEMON:

None SERVICE: Electrical Safety Systemo AGING LOCATION: Aux. Bldg.

Hoto 3 40 years None 4

Sequential Nono f

C FLOOD LEVEL ELEV:

SUDMER-Not Applicable 9

ADOVE FLOOD LEVEL:

GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

_ NOTES:

1 J. M. Farley FSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp up to 308.4 F in 0,.3 sec.,

2 Bechtel Calculation 525-25-7597 from ramp down to 300 F in 0.4 sec., dwell at 300 F for 0.6 sec., step down Computer Run T-10576 and dwell at 214 F until termination of event.

1 3

J. M. Farley FSAR Chapter 3, 2.

Pressure profile from Reference 2 Rnmp up to 20.5 psia in 0.1 oce.,

Appendix 3K ramp down to 18.4 pain in 0.6 oce., dwell at 18.4 pefa for 0.55 sec.,

4.

Wyle Laboratorias NEQ Test Report step down and dwell nt 15.5 pain until termination of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Bulletin 79-018.

Rev. 2

'{

SYSTEM COMPONENT EF'.UATION WOR K SHEET b i' Joseph M. Farley Nucl:ar PI:nt Unit 1

Section C.2.13 Sheet _ 49 cf 3

ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF.

QUAL.

OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL METHOD ITEMS SYSTEM: Main Steam OPERATING Sin:21taneoun PLANT ID NO. Q1N11SV3976C-B/JB TIME 10 min.

7 days 1

4 Test None COMPONENT: Tertalnal Block witta

TEMP, 308 NEMA 4 Enclosure

("F)

Note 1 307 2

4 Hone

' MANUFACTURER: States Company PRESSURE 20.5 (PSIA)

Note 2 80 2

4-Hone MODEL. NUMBER:

RELATIVE Type ZWM Cetalog M-25012 IlUMIDITYl%)

100 100 3

4 None TUNCTION: Conductor Termination CHEMICAL N DO3+

SPRAY None 3

None 4

V None NnQ1L ACCURACY: SPEC:

Not Applicable nADIATION DEMON:

/3. <1 n107. y None 4

Sequential None n

None SERVICE: Electrical Safety Systemn LOCATION: Aux. Bldg.

g g

Note 3 40 years None 4

Sequential None FLOOD LEVEL ELEV:

SUBMER.

R No 16ble l2 ABOVE FLOOD LEVEL:

GENCE N/A 11/A N/A N/A N/A None 9

  • DOCUMENTATION REFERENCE 3:

NOTES:

1 J. M. Parley PSAR Section 3K-4.1.1.10 1.

Temperature profile from Reference 2.

Ramp up to 308.4 F in 0.3 sec.,

2 Bechtel calculation 525-25-7597 from ramp down to 300 F in 0.4 nec., dwell at 300 F for 0.6 sec., step down Computer Run T-10576 and dwell at 214 F untti termination of event.

3 J. H. Farley FSAR Chapter 3, 2

Prensure profile from Reference 2 Rnmp up to 20.5 pain in 0.1 sec.,

Appendix 3K ramp devn to 18.4 pain in 0.6 occ., dwell at 18.4 pain for 0.55 sec.,

4.

Wyle Laboratories NEQ Test Report step down and dwell nt 15.5 pain until terminntion of event.

44354-1 dated 3-8-79 3.

Enclosure (4) to IE Ilulletin 79-01n.

Rev. 2

{

SYSTEM COMPONENT T'.LUATION WORK SHEET b

S:cti:n C.2. 14 J;seph M. Faricy Nuclear Plant Unit 1

Sheet 14 ef a

s

.I ENVIRONMENT EQUIPMENT DESCRIPTION DOCUMENTATION REF.

OUAL*

OUTSTANDING PA RAMETE R SPEC.

OUAL.

S PE C.

QUAL.

METHOD ITEMS SYSTEM: Auxiliary Steam OPERATING 10 min Simutaneous PLANT !D NO.

TIME 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 1

4 test Nonc Cable Code Rll,R22,R23,W01 COMPONENT: Cable Power and TEMP.

308 Simultaneous Control

( Fl Note 1 324 2

4 test None MANUFACTlfRER:

PRESSURE 20.5 3imultaneous The Okonite Company (PSIA)

Note 2 94.7 2

4 test None MODEL NUMDER: None RELATIVE 100 100 3

4 Simultane us HUMIDITY (%)

p ""

test FUNCTION: Electrical Power CHEMICAL N n03+

31multaneous 3

pg and Control SPHAY tin 0ll test RADIATION

' None EM N: Not applicable R ds None 4

Sequential None LOCATION: ux Bldg.

^0 '"

I ""

N" " "

FLOOD LEVEL ELEV: Not Applicabic SUUMER-ADOVE FLOOD LEVEL:

GENCE N/

N/A N/A HM Nm

' DOCUMENTATION

REFERENCES:

NOTES:

1 J. H. Faricy FSAR Sect. 3K-4.1.4.8 1.

temperMure prof Lic from Reference 2.

Itamp up to 300.40F in 0.3 sec.,

2.' Dechtel Calulation 525-25-7597 from ramp down to 300 F in 0.4 nec., dwell at 3000F for 0.6 sec., otep down Computer Run T-10576 and dwell at 214 F until termination of event.

3.

J. M. Faricy FSAR Sect. 3, Appen-2.

Pressure profile from Reference 2. Ramp up to 20.5 pain in 0.1 sec.,

dix 3K.,

ramp down to 18.4 psia in 0.6 sec., dwell at 18.4 psia for 0.55 sec.,

4.

  • nic Okonite Co. - Engineering otep down and dwell at 15.5 psia until termination of event.

Report No. 141 dated 2-29-72 and 3.

Enclosure (4) to IE Dulletin 79-01D No.143 dated 3-20-72 Rev. 2

{

SYSTEM COMPONENT fl.UATION WOflK SHEET fN #

Sectien C.2.14 J:seph M. Farley Nuclear Plant Unit 1

Sheet 15 cf s.i ENVIRONMENT EQUIPMENT DESCRIPTION DOCUME 7' ATION REF.

OtfAL-OUTSTANDING PARAMETER SPEC.

OUA L.

SPEC.

QUAL.

MElllOD ITEMS SYSTEM: Auxiliary Steam OF ERATING 10 min Simutaneous PLANT 10 NO.

TIME 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 1

4 test Nonc

~

Cable Code y01 COMPONENT:

TEMP.

306 simultaneous Cable Instrumentation I FI Note 1 340 2

4 test None MANUFACTt/RER: Boston Insulated PRESSURE 20.5 Simultaneous Wire & Cabic Company (PSIA)

Note 2 119.7 2

4 test None MODEL NUMDER: LSS-1802 RELATIVE 100 100 3

0 11multaneous ilUMIDITY(%)

test FUNCTION:

E1cetrical CiiEMICAL N D03+

U multaneous 3

Non U"

O Instrumentation SPflAY Nn0li test None "A I^ I "

Nn 4

Scouentini None EM N: Not applicable Rd SERVILE: Elec. Safety Systems AGING Note 3 40 years Note 3 4

Sequential None f

LOCATION: Aux Bldg.

FLOOD LEVEL ELEV: Not Applicabic SUDMER-E A00VE FLOOD LEVEL:

GENCE N/A N/A N/A N/A N/A None g

01

" DOCUMENTATION

REFERENCES:

NOTES-1.

J. M. Faricy FSAR Sect.3K-4.1.4.8 1.

Temperature profile from Reference 2.

Ramp up to 308.40F in 0.3 sec.,

2; Bechtel Calulation 525-25-7597 from ramp down to 300'F in 0.4 sec., dwell at 300 F for 0.6 sec., step 'down Computer Run T-10576 and dwell at 214 F until termination of event.

l 3.

J. H. Faricy FSAR Sect. 3, Appen-2.

Pressure profile from 11cforence 2. Ramp up to 20.5 pain in 0.1 sec.,

dix JK.,

ramp down to 10.4 psin in 0.0 nec., dwell at 10.4 psia for 0.55 sec.,

4.

B::ston Iiisu' lated Wire and Cable -

step down and dwell at 15.5 psia until termination of event.

Co. Test Report 73E062 dated 3.

Enclosure (4) to IE nulletin 79-01n 9-7-73 and Test Report 74A023 dated 1-24-74 Rev. 2

u a m wm unu.. 7 w n

..v....v. m.. w g

S ction fy C,~2.18 f

Joseph M. Fcriey Nuct:er Plant Unit 1

Sheet 5 cf

- ENVIRONMENT DOCUMENTATION REF.

EOUlFMENT DESCRIPTION QUAL.

OUTSTANDING PARAMETER

SPEC, OUAL SPEC.

QUAL METHOD ITEMS SYSTEM: Sampling System OPERATING Gimultaneous PLANT ID NO. Q1P15ZS3103 TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TE MP-300 Simultaneous i F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N BU3+

N B03+

Simultaneous Indication b U^

3 3

NnO11 NnOlt 1

4 Test None 0

5 x 10 li = 1 x 10 8

Ra ACCURACY: SPEC:

i RADIATION DEMON: Not applicable SERVICE: FZR Sampi AGING E

LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None

-D FLOOD LEVEL ELEV: 115' SUDMER.

O ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

'DDCUMENTATION

REFERENCES:

_ NOTES:_

1 J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2 Ramp up to 300 F from ambient in,50 sec.

2 J. H. Farley TSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in I hr.-7 min., dwell at 3.

J. M. Farby,FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112"F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure prnfile from Reference 3, Ramp up to 62.2 pois in 40 sec., d. eli at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in I hr.-45 min., re:=p dern to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4.

4.

Enclosure (4) to IE Bulletin 79-01B.

8 5.

For /3, the component is considered qualified if the /J dose of 2 x 10 Rads is reduced by shielding to 107. of the 3 dose Rev. 2

(

i; SYSTEM COMPONEN_.! VALUATION WORK SHEET

(*?1 Sac'tlch C.2.18 Aseph M. Fart y Nuclear Plant Unit 1

Sheet 7 of ENVIRONMENT EOUIPMENT DESCRIPTION DOCUMENTATION REF.

QUAL

  • OUTSTANDif PARAMETER SPEC.

QUAL.

SPEC.

QUAL.

METil0D ITEMS SYSTEM: Ctmt. Cooling and Purge OPERATING PLANTID NO. QlF157,S3765 TIME Jimultaneous 4 hr.

6 hr.

1 4

Teat None COMPONENT:

Limit Switch TEMP.

300

( F)

Simultaneous Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSURE 62.2 (PSIA)

Simultaneous Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE HUMIDITY (%)

3imultaneous 100 100 1

4 Teat None FUNCTION: Valve Position CH MICAL N B03+

H B03+

Indication 3

3 Simultaneous NnOH NnOH 1

4 Teot None ACCURACY: SPEC:

6-5 x 10 6= 1 x 10 0 DEMON: Not applicaby.e RADIATION i

O = Rads O =(Rada107fand Note 4 4

Sequential None Note 6 SERVICE: Reac. Coolant. Loop Sample LOCATION: Containment Elev. 105'

^UIM Note 4 Note 3 Note 4 4

4 None FLOOD LEVEL ELEV: 115' SUDMER-A00VE FLOOD LEVEL: No GENCE Note 4 Note 5 None None None None

' DOCUMENTATION R EFERENCES:

_ NOTES:

1.

J. M. Farley FSAR Tnble 3.11-1 1.

Temperature profile from Reference 2 Ramp up to 300 F from ambient in 50 se

~

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min.; dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

, j, D

0 4.

Acme-Cleveland Development Co.

2 Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 se'c., dwell s' Qualification Report for NAMCO 62.2 pela for 6 min., ramp down to 26.7 paia in I hr.-45 min., ramp down to Controls Limit Switch Hodel 16 pain in 11.5 days.

EA-100 dated 11121-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per 6.

For O, the component is con-4.

re re (4) to IE Bulletin 79-01D.

sidered qgalified if the 6 dono 5.

of 2 x 10 Rads is reduced by Although this component may become submerged following a postulated accident, shielding to 107. of the f done.

its enfety function will have been performed prior to its becoming submerged,

,,a,,.,,,,,.,,,,,.,,,.,__,_____...

eue.

.ui-w.a.v.a

... u ~

un..~....w...

Joseph M. Farley Nuct;st Plant Unit 1

Sheet 9

of ENVIRONMENT DOCUMENTATION REF.

QUAL.

OUTSTANDING EOUlFMENT DESCRIPTION PA RAMETE R SPEC.

QUAL.

SPEC.

OUAL.

METHOD ITEMS '

SYSTEM: Sampling System OPE R ATING Simultaneous PLANT ID NO. Q1P15ZS3766 TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 S imult e.neous

( F)

Note 1 340 2

4 rest None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test Nona MODEL NUMBER: EA-180 IF ATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Fosition CHEMICAL N B03+

N B03+

3imultaneous Indication SPRAY 3

3 Nn0H

Mn01, 1

4 Test None 7

0 5 x 10 I= 1 x 10 g= Rads ACCURACY: SPEC:

1 RADIATION Rada DEMON. Not applicable d= Note 5 d = <,107. $

and Note 4 4

Sequential None SERVICE: Accum. Sample Isolation

[

AGING LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None

-5 FLOOD LEVEL ELEV: 115' SUD M E R-E ADOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION R EFERENCES:

NOTES:

1.

J. H. Parley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec.,' dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Hodel 16 pain in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correintion between these conditions and the qualified life is not known per Reference 4 4.

Enclosure (4) to IE Bulletin 79-01n.

8 5.

For M, the component is considered qualified if the /3 dose of 2 x 10 Rads is reduced by shielding to 107. of the 3 dose Rev. 2

u mJ veJe WND Ictien [g.2.18 S::

C Joseph M. Farley Nuclear Plant Unit 1

Sheet 11 cf ENVIRONMENT DOCUMENTATION REF.

OUAL.

OUTSTANDING EQUIPMENT DESCRIPTION METHOD ITEMS PARAMETER SPEC.

QUAL.

SPEC.

QUAL.

SYSTEM: Sampling System OPERATING Simultaneous PLANT ID NO. Q1P15ZS3179A TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP-300 Simultaneous i F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultaneous Indication SPHAY 3

3 Nn01f Hn011 1

4 Teat None 7

8 5 x 10 8= 1 x 10 g=Itads ACCURACY: SPEC:

I RADIATION f(ads DEMON: Not applicable d= Note 5 0 =<,107 f and Note 4 4

Sequential None SERVICE: SG 1A Blowdown Sample E

AGING LOCATION: Containment Elev 1,29' Note 4 Note 3 Note 4 4

4 None

-0 n FLOOD LEVEL ELEV: 115' SUDMER.

ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A

  • DOCUMENTATION

REFERENCES:

NOTES:

1.

J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. M. Farlay FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 P in 11.5 days.

0 4.

Acme-Cleveland Development Co.

2 Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NAMCO 62.2 paia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4.

4.

Enclosure (4) to IE Bulletin 79-01B.

8 5.

For /3, the component is. considered qualified if the /3 dose of 2 x 10 Rads is reduced by shielding to 107. of the 3 dose Rev. 2

1 y

o. o. u...

,v.... w.....

n o w n.. w.......,..

m u..

Joseph M. Farley Nuclear Plant Unit 1

sheet 13 of ENVIRONMENT DOCUMENTATION REF.

OUAL OUTSTANDING PARAMETER SPEC.

QUAL SPEC.

CUAL METHOD ITEMS SYSTEM: Sampling System OPERATING Simultaneous TWE PLANT ID NO. Q1P15ZS3179B 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous

( F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180 RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Fosition CHEMICAL N B03+

N B03+

Simultaneous Indication SPRAY 3

3 Nn0H Nn0H I

4 Teet None 8

5 x 10 I= 1 x 10 g= Rads ACCURACY: SPEC:

I RADIATION Rads DEMON: Not applicable

$= Note 5 0 = (107. I and Note 4 4

Sequential N6ne SERVICE: SG 1A Blowdown Sample g

LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None

-y FLOOD LEVEL ELEV: 115' SUDMER.

Y ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None y

' DOCUMENTATION

REFERENCES:

NOTES:

1 J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Rnep up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112"r in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec., dwell at Qualification Report for NAHCO 62.2 psia for 6 min., ramp down to 26.7 psia in i hr.-45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4.

4 Enclosure (4) to TE Bulletin 79-01B.

y 5.

For M, the cot..ponent is considered qualified if the /J dose of 2 x 10 Rads is reduced by shielding to 107. of the 3 dose Rev. 2

o....-ou..v.....r---..~....-.......--.

S2stion

.18 Joseph M. Farley Nucl:ar Pl:rit Unit i

Sheet 15 cf ENVIRONMENT DOCUMENTATION REF.

EOUIPMENT DESCRIPTION OUAL*

OUTSTANDING PAR AMETE R

SPEC, OUAL.

SPEC.

OUAL METHOD ITEMS SYSTEM: Sampling System OPERATING Simultaneous TIME PLANT ID NO. Q1P15ZS3179C 4 hr.

6 hr.

1 4

Test Nor.e COMPONENT:

Limit Switch TEMP.

300 Simultaneous

("FI Note 1 340 '

2 4

Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Teut None MODEL NUMBER: EA-180 RELATIVE Simultaneous HUM 10lTY (%1 100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultaneous Indication SPRAY 3

3 Nn011 lla0ll 1

4 Teat None 8

5 x 10

$= 1 x 10 g= Ra ACCURACY: SPEC:

1 RADIATION Rad DEMON: Not applicable SERVICE: SG 1A Blowdown Sample AGING E

LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None s

.-n FLOOD LEVEL ELEV: 115' SUDMER.

p ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A 1?/A None h

' DOCUMENTATION

REFERENCES:

. NOTES:_

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2.

J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at f

3.

J. H. Farley,FSAR Figure 6.2-4 180 F for 6 bre.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2 Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec., dwell at Qualification Report for NANCO 62.2 psia for 6 min., ramp down to 26.7 psia in i hr.-45 min., ramp down to Controls Limit Switch Hodel 16 psia in 11.5 days.

EA-180 dated 11121-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4, 4.

Encionure (4) to IE Bulletin 79-01B.

8 5.

For /3, the component is considered qualified if the /9 dose of 2 x 10 Rade is reduced by shielding to 107. of the 3 dose Rev. 2

OUTSTANDING Unit _ 1 DOCUMENTATION REF.

OUAL.

ygus Joseph M. Farley NucI:sr Plint METHO3 ENVIRONMENT QUAL.

l SPEC.

OUAL.

SPEC.

EQUIPMENT DESCRIPTION

-PARAMETER 31multaneous None Test 4

OPERATING 1

6 hr.

SYSTEM: Sampling System TIME 4 hr.

3imultaneous None Q1P152S3180A Test FLANT ID NO.

4 TEMP.

300 2

Limit Switch i F)

Note 1 340 Simultaneous COMPONENT:

None Test 4

Namco Controls

- PRESSURE 62.2 3

70 (PSIA)

Note 2 Simultaneous MANUFACTURER:

None Teet 4

1 MODEL NUMBER: E A-180' f

RELATIVE 100 HUMIDITY (%)

100 Simultaneous None_

N B03+

4 Teat CHEMICAL N BO3+

3 3

1 FUNCTION: Valve Fosition SPRAY Ja tt o

Jn011 8

None I= Rads 1 x 10 I

Sequential 7

Indication g= Rnds5 x 10 4

d=(107.$

. and Note 4 RADIATION ACCURACY: SPEC:

Not applicable 4= Note 5 None DEMON:

4 4

Note 4 SG 1B Blowdown Sample AGING Note 4 Note 3 Elev 129' N/A Non<

$ERVICE:

LOCATION: Containment N/A N/A SUDME R-N/A 115' GENCE N/A t

FLOOD LEVEL ELEV:

I Yes NOTESL 1

ABOVE FLOOO LEVEL:

down to 180 F in 1 hr.-

' DOCUMENTATION

REFERENCES:

Temperature profile from Reference 2.

Ramp down to 256 F in 16 min., ramp 180"F for 6 11.5 days.

Ramp up to 62.2 pais in 1,

J. M. Farley FSAR Table 3.11-1 J. H. Farley FSAR Figure 6.2-6 Pressure profile from Reference 3.62.2 ps 1.

i J. N. Farley FSAR Figure 6.2-4 2.

2.

Acme-Cleveland Development Co.

3.

+

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> perd the qualified l 16 pata in 11.5 days.

Qualification Report for NAMCO 4.

Controls Limit Switch Model Correlation between these conditions an 3.

81 EA-180 dated 11-21-77 f

d if the /3 dose of 2 x 10 Enclosure (4) to TE Bulletin 79-01H. component is consid Reference 4 4.

3 dose is reduced by shielding to 107. of the For /3, the 5.

Rev

..._ - - m n

' - - - ' - ~ - - - ~

q r,

o e e o.:. o v.a. v..... p w,,..........,,.. - -.

f Section [ J.2.la ll Joseph M. Farley Nuclear Plant Unit 1

Sheet 19 of ENVIRONMENT DOCUMENTATION REF.

QUAL OUTSTANDING EQUIPMENT DESCRIPTION j

PARAMETER SPEC.

QUA L.

S PE C.

QUAL.

METHOD ITEMS SYSTEM: Sampling System OPERATING Simultaneous TIME PLANT 10 NO. Q1P15ZS3180B 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous l

(OF)

Note 1 340 2

4 Test None MANUFACTURER: ha. Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None t

FUNCTION: Valve Position CHEMICAL H B03+

N B03+

3imultaneous Indication SPRAY 3

3 Hn011 Hn011 1

4 Test None 7

0 5 x 10 I= 1 x 10 g= Rads ACCURACY: SPEC:

t RADIATION Rads DEMON: Not applicable d= Note 5 d = <,107. f and Note 4 4

Sequential N6ne SERVICE: SG 1B Blowdown Sample

^0I"U LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None D

FLOOD LEVEL ELEV: 115' SUBMER.

ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. M. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley,FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec.l dwell at Qualification Report for NANCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Nodel 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4

~

4.

Enclosure (4) to IE Bulletin 79-01B.

8 5.

For /3, the component is considered qualified if the /3 dose of 2 x 10 Rads is reduced by shielding to 107. of the 1 dose Rev. 2

evemazmwanxstou ts7atsmmcra uunn sneci S1ction[,C.2.10 Joseph M. Farley Nuclear Plant Unit 1

Sheet 21 cf ENVIRONMENT DOCUMENTATION REF.

QUAL.

OUTSTANDING EQUIPMENT DESCRIPTION PARAMETE R SPEC.

OUAL SPE C.

OUAL.

METilOD ITEMS SYSTEM: Sampling System OPERATING Simultaneous PLANT ID NO. Q1P15ZS3180C TIME 4 hr.

6 hr.

1 4

Teat Nor-e COMPONENT:

Limit Switch TEMP.

300 Simultaneous

("F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultar.cous Indication SPRAY 3

3 NnO11 Nn011 1

4 Teat None 7

8 5 x 10 8-1 x 10 g= Rnds ACCURACY: SPEC:

I RADIATION Rads DEMON: Not applicable d= Note 5 d = < 107. $

and Note 4 4

Sequential None SERVICE: SG 1B Blowdown Sample I

AGING LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None

~k FLOOD LEVEL ELEV: 115' SUDMER.

ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

NOTES:

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Far hy,FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec., dwell at Qualification Report for NANCO 62.2 psia for 6 min., ramp down to 26.7 paia in 1 hr.-45 min., ramp down to Controls Limit Switch Hodel 16 psia in 11.5 days.

EA-180 dated 11721-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4,

4.

Enclosure (4) to TE Bulletin 79-018.

g 5.

For /3, the component is considered qualified if the /J dose of 2 x 10 Rads is reduced by shielding to 107. of the g dose Pev. 2

s y a i cm wmrun en i c.y ei.un o e>o ouv.m..

r('

S:ction [.C.2.10

/

Joseph M. Farley NucI:ar Plant Unit i

Sheet 23 cf ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION OUR OUTSTANDH4G PARAMETER SPEC.

QUAL SPEC.

QUAL METHOD ITEMS SYSTEM: Sampling System OPERATING Sirmultaneous PLANT ID NO. Q1P15ZS3181A TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous I F)

Note 1 340 2

4 Test None l

MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Teot None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Simultaneous Indication SPRAY 3

3 Na011 NnO11 1

4 Teat None 7

8 ACCURACY: SPEC:

8=5x10 i= 1 x 10 I

RADIATION Rads Rads DEMON: Not applicable d= Note 5 A=(107.f and Note 4 4

Sequential None SERVICE: SG IC Blowdown Sample AGING LOCATION: Containment Elev 1,29' Note 4 Note 3 Note 4 4

4 None _ }

FLOOD LEVEL ELEV: 115' SUBM E R-5 ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None h

' DOCUMENTATION

REFERENCES:

_ NOTES:

1.

J. H. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Fressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec., dwell at Qualification Report for NANCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Hodel 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per i

Reference 4, 4.

Enclosure (4) to TE Bulletin 79-01B.

g 5.

For /3, the component is considered qualified if the /3 dose o'f 2 x 10 Rads is reduced by shielding to 107. of the 3 dose Rev. 2

vu eu t%; - mm*

  • 7 6 w~ " a w "" ="--
  • Section ( C. 2.10 Joseph M. Farley Nuclear Pl:nt Unit 1

Sheet 25 cf ENVIRONMENT DOCUMENTATION REF.

OUAL OUTSTANDING PAR AMETE R SPEC.

QUAL.

SPE C.

OUAL.

METHOD ITEMS SYSTEM: Sampling Syatem OPERATING Simulteneouo TIME PLANT ID NO. Q1P15ZS3181B 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous

~

t F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PRESSURE 62.2 Simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE G1multaneous HUMIDITY l%1 100 100 1

4 Test None FUNCTION: Valve Position CHEMICAL N B03+

N B03+

Gimultaneous Indication SPRAY 3

3 Nn0H MnOH 1

4 Test None 6

5 x 10 I= 1 x 10 g= Rads ACCURACY: SPEC:

1 RADIATION Rads DEMON: Not applicable d= Note 5 d=(107.'d and Note 4 4

Sequential None SERVICE: SG IC Blowdown Sample g

LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None

.-g FLOOD LEVEL ELEV: 115' SUDMER.

9 ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None 2

' DOCUMENTATION

REFERENCES:

NOTES:

1 J. H. Parley F.9AR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. H. Farley FJAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. H. Farby FSAR Figure 6.2-4 180"F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4.

Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 psia in 40 sec.,' dwell at Qualification Report for NANCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to Controls Limit Switch Nodel 16 psia in 11.5 days.

EA-180 dated 11121-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Reference 4 4.

Enclosure (4) to IE Bulletin 79-01B.

8 5.

For /3, the component is considered qualified if the /J dose of 2 x 10 Rads is reduced by shiciding to 107. of the 3 dose Rev. 2

e a i a a em uu... L,a...

-oo.o.....,..

Joseph M. Farley Nucl:ar Plant Unit 1

Sheet 27 cf ENVIRONMENT DOCUMENTATION REF.

EQUIPMENT DESCRIPTION OUAL OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL.

METHOD ITEMS SYSTEM: Sampling System OPE R ATING Simultaneous PLANT ID NO. Q1P15ZS3181C TIME 4 hr.

6 hr.

1 4

Teet None COMPONENT:

Limit Switch TEMP.

'300 Simultaneous

( F)

Note 1 340 2

4 Test None MANUFACTURER: Namco Controls PR ESSURE 62.2 Simultaneous (PSIAI Note 2 70 3

4 Test None MODEL NUMBER: EA-180' RELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Teat None FUNCTION: Valve Position CH MICAL N B03+

N B03+

Simultaneous 3

3 Indication NnnH MnOH 1

4 Test None 8

5 x 10 lI= 1 x 10 g= Rn ACCURACY: SPEC:

1 RADIATION d

DEMON: Not applicable SERVICE: SG 1C Blowdown Sample g

LOCATION: Containment Elev 1,29' Note 4 Note 3 Note 4 4

4 None

-O FLOOD LEVEL ELEv: 115' SUDMER.

U ABOVE FLOOD LEVEL: Yea GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

. NOTES:

1.

J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F from ambient in 50 sec.

2 J. M. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in 1 hr.-7 min., dwell at 3.

J. M. Farley FSAR Figure 6.2-4 180 F for 6 hrs.-56 min., ramp to 112 F in 11.5 days.

4 Acme-Clevelatid Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec., dwell at Qualification Report for NAMCO 62.2 psia for 6 min., ramp down to 26.7 psia in I hr.-45 min., ramp down to Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

Thermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

j

, Correlation between these conditions and the qualified life is not known per- '"

Reference 4 4.

Enclosure (4) to TE Bulletin 79-01B.

e 5.

For /3, the component is considered qualified if the /.3 dose of 2 x 10 Rads is reduced by shielding to 107. of the 3 dose

. Rev. 2

(

s r a e em ovMrvatn o v~cxwxas euri nuns cnte:

Joseph M. Farley Nucl:ar Plant Unit 1

Sheet 29 cf ENVIRONMENT DOCUMENTATION REF.'

EOUIPMENT DESCRIPTION OUA1 OUTSTANDING PARAMETER SPEC.

QUAL.

SPEC.

QUAL METHOD ITEMS SYSTEM: Sampling System OPE R ATING Simultaneous PLANT ID NO. QLP15ZS3104 TIME 4 hr.

6 hr.

1 4

Test None COMPONENT:

Limit Switch TEMP.

300 Simultaneous l F)

Note 1 340 2

4 Test None MANUFACTUR2R: Namco controls PRESSURE 62.2 simultaneous (PSIA)

Note 2 70 3

4 Test None MODEL NUMBER: EA-180' FIELATIVE Simultaneous HUMIDITY (%)

100 100 1

4 Test None FUNCTION: Valve Position C MICAL N B03+

N B03+

Gimultaneous 3

3 Indication Nanll Nnoll 1

4 Test None g= Rads 5 x 10 i = 1 x 10 ACCURACY: SPEC:

t RADIATION Rada DEMON: Not applicable d= Note 5 d=(107.f and Note 4 4

Sequential None SERVICE: PZR Sample AGING I"

LOCATION: Containment Elev 129' Note 4 Note 3 Note 4 4

4 None g-FLOOD LEVEL ELEV: 115' SUBMER.

E ABOVE FLOOD LEVEL: Yes GENCE N/A N/A N/A N/A N/A None

' DOCUMENTATION

REFERENCES:

_ NOTES:_

1 J. M. Farley FSAR Table 3.11-1 1.

Temperature profile from Reference 2.

Ramp up to 300 F frone ambient in 50 see.

2, J. N. Farley FSAR Figure 6.2-6 Ramp down to 256 F in 16 min., ramp down to 180 F in I hr.-7 min., dwell at 3.

J. H. Far by FSAR Figure 6.2-4 180"F for 6 hre.-56 min., ramp to 112 F in 11.5 days.

6 Acme-Cleveland Development Co.

2.

Pressure profile from Reference 3.

Ramp up to 62.2 pois in 40 sec., dwell at Qualification Report for NAHCO 62.2 psia for 6 min., ramp down to 26.7 psia in 1 hr.-45 min., ramp down to a

Controls Limit Switch Model 16 psia in 11.5 days.

EA-180 dated 11-21-77 3.

'Ihermally aged at 200 F for 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> per ANSI Draft Standard N278.2.1.

Correlation between these conditions and the qualified life is not known per Referepce,4.e 4.

Enclosure ~(4) to IE Bulletin 79-01H.

g 5.

For 4, the component is considered qualified if the /J dose 'of 2 x 10 Rads is redheed by shielding to 107. of the 3 dose Rev. 2 a.

-