UNITED STATES
8' 3
"'n
NUCLEAR REGULATORY COMMISSION
n
.
3
N
REGION il
U
s
- y, . . . .,e'['
g
101 MARIET TA ST., N.W., sulTE 310o
y
,n
ATLANTA, G EoRGIA 3o3o3
-:.
3
OCT 0 71980
.;
In Reply Refer To:
-
1 .
,
RII:VLE
~ s
J
.i
X 3
-50-321/80-37
R
(5{366/80-3p)
o*
U;
3
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by V. L. Brownlee of this office on
September 16 through 17, 1980 of activities authorized by NRC Operating License
No. DPR-57 and License No. NPF-5 for the E. I. Hatch Nuclear Plants facility,
and to the discussion of our findings held with M. Maury at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
8011260 7 30
f
-.
- . - -
= -
-,
.
.
.
...
u
_
T
'
!
'
00T 0 7180
^
Georgia Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
C. E. Murp
Nicf
,
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-321/80-37
and 50-366/80-37
cc w/ encl:
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
W. A. Widner, Vice President and
General Manager-Nuclear Generation