Forwards IE Insp Repts 50-321/80-37 & 50-366/80-37 on 800916 -17.No Noncompliance Noted
ML19345B224
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/07/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19345B225 List:
References
NUDOCS 8011260380
Download: ML19345B224 (2)


See also: IR 05000321/1980037

Text

fa0 0

9'o,

_

-k

/

UNITED STATES

8' 3

"'n

NUCLEAR REGULATORY COMMISSION

n

.

3

N

REGION il

U

s

  • y, . . . .,e'['

g

101 MARIET TA ST., N.W., sulTE 310o

y

,n

ATLANTA, G EoRGIA 3o3o3

-:.

3

OCT 0 71980

.;

In Reply Refer To:

-

1 .

,

RII:VLE

~ s

J

.i

X 3

-50-321/80-37

R

(5{366/80-3p)

o*

U;

3

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by V. L. Brownlee of this office on

September 16 through 17, 1980 of activities authorized by NRC Operating License

No. DPR-57 and License No. NPF-5 for the E. I. Hatch Nuclear Plants facility,

and to the discussion of our findings held with M. Maury at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

8011260 7 30

f

-.

- . - -

= -

-,

.

.

.

...

u

_

T

'

!

'

00T 0 7180

^

Georgia Power Company

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

C. E. Murp

Nicf

,

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-321/80-37

and 50-366/80-37

cc w/ encl:

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A. Widner, Vice President and

General Manager-Nuclear Generation

i

'

t

..

--

- - -

-

-