ML19345B208
| ML19345B208 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 10/10/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML19345B209 | List: |
| References | |
| NUDOCS 8011260346 | |
| Download: ML19345B208 (2) | |
See also: IR 05000395/1980028
Text
- (
UNITED STATES
gjg
,
NUCLEAR REGULATORY COMMISSION
f
,r
[
_s
)er
g
s a
REClON 11
n
$
101 MARIETTA ST
N.W.. SUITE 3100
ATLANTA. GEORGIA 303o3
a
% . . . . . p
s
In Reply Refer To:
.
OCT 101980
_
RI
w["
-
- 4
,0-39 /80-2h
a;
,
.
South Carolina Electric and Gas Company
d;
ATTN:
T. C. Nichols, Jr. , Vice President
.
-
Power Production and Systems Operations
!J . ,
"
2.3
P. O. Box 764
h
7
yj
Columbia, SC 29218
E
uu
Gentlemen:
This refers to the inspection conducted by J. K. Rausch of this office on
September 23-25, 1980, of activities authorized by NRC Construction Permit No.
CPPR-94 for the V. C. Summer facility, and to the discussion of our findings
held with 0. S. Bradham at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is' claimed that the information is proprietary, and shoulo be prepared so
that proprietary information idertified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public. Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
C. E. Murp y,
ef
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
8011260346
k
,
-
.
._ . .
.
- .
. - . .
.
-
-.
. - -
.
...
-
'
,
._.
_.
,
_
. . . . . .
_ _ . . . _
_.
-
- _ . . . . .
.
,
4
4
'
South Carolina. Electric and Gas
-2-
0CT 101980
Company
i
Enclosure:
Inspection Report No. 50-395/80-28
!
cc w/ encl:
4
A. A. Smith, Site QA Coordinator
T- B. Conners, Jr.
O. S. Bradham, Manager
Nuclear Operations
4
t
4
i
i
.
l
4
-
i
<
4
-I
I
?
l
l
j
-
1
1
i
f
t
1
~
4
e
=
b
. , - ,
-
.
- ,
. . . . ,
-.. .
_ , . - , , - - . . , . . . . _ _
, _ _ . - . - _ _ . , _ _ . _ . . _ . - . . _ . . . . - . . - . _ _ _ . , - . . _ . -