ML19345B204

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-440/80-15 & 50-441/80-14 on 800819-22 & Notice of Violation
ML19345B204
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/12/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19345B205 List:
References
NUDOCS 8011260335
Download: ML19345B204 (2)


See also: IR 05000440/1980015

Text

.-

.

.

.-

d'p Kict,,D

'

o

UNITED STATES

!\\

NUCLEAR REGULATORY COMMISSION

n

$e

,. E

REGION ill

[

'y

o,

' # ,[

799 ROOSEVELT ROAD

[

% ...* /

GLEN ELLYN,ILLINOls 6o137 -

SEP 12 080

C5

e

25

Docket No. 50-440

$

g

Docket No. 50-441

,

rwe

N

n

xad

C

lU,.

The Cleveland Electric

Eg[z

~3

hy/

[1

]

Illuminating Company

ATTN: Dalwyn R. Davidson

y

,

Vice President - System

8

e

Engineering and Construction

Es

$

~

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine inspection conducted by C. M. Erb of this

office on August 19-22, 1980, of activities at Perry Nuclear Plant Project

Units 1 and 2 authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to the discussion of our findings with W. J. Kacer and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

I

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

I

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

i

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

taken and the results achieved; (2) corrective action to be taken to

avoid further noncompliance; and (3) the date when full compliance will

be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures cont in

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

8011260335

.-

- -.

_.

. . .

.

SEF 1 2 sea

The Cleveland Electric

-2_

Illuminating Company

of this letter, to withhold such information from public disclosure.

The

application must include a full statement of the reasons for which the

information is considered propriet.ary, and should

epared so that

proprietary information identified in the application .s contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

o

M8

t,

a

G. Florelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-440/80-15

and No. 50-441/80-14

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W.Kohn, Powet

Siting Commission

Mr. Daniel D. Wilt, Attorney

llelen W. Evans, State of Ohio