NOTICE OF VIOLATION Cleveland Electric Illuminating Docket No. 50-441 Company i
Based on the results of an inspection conducted on August 19-22, 1980, it appears that one of your activities was in noncompliance with NRC require-ments as noted below. This item is an infraction.
i 10 CFR 50, Appendix B, Criterion XIII, states in part, that " Measures shall be established to control the handling, storage, shipping, cleaning, and preservation of material and equipment in accordance with work and inspection instructions to prevent damage or deterioration."
+
CEI Project Administration Procedure 1301, Revision 1. p.ragraph 1.2, states that..." Procedures shall be established and knplemented in accordance with ANSI N45.2.2 and Reg. Guide 1.38."
d i
Paragraph 6.5 of N45.2.2 states that " Items released from storage and placed in their final locations within the power plant shall be inspected and cared for in accordance with the requirements of Section 6 of this standard and other applicable standards."
l Contrary to the above, during the period of August 19-22, 1980, the inspector found housekeeping conditions in the anchor bolt area of the I.
reactor pressure vessel to be_out of control. Water had accumulated and I
covered the lower end of the holddown studs and welding flux and other i
debris were also present in the area.