ML19345B138
| ML19345B138 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/13/1980 |
| From: | Reed R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19345B139 | List: |
| References | |
| NUDOCS 8011260201 | |
| Download: ML19345B138 (4) | |
Text
0) v sp aew f
y%'
UNITED STATES 5'
'n NUCLEAR REGULATORY COMMISSION
'd
'I wAstuwoton. o. c. rosss
\\....+/
GEORGIA POWER COMPANY OGLNHORPE POWER CORPORATION MUNICTPKE~EIT.CTRIC AUTHOkITY 0F GEORGIA
~
CI_TY OF DALTON, GEORGIA DOCKET NO. 50-321 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 80 License No. DPR-57 1.
The Nuclear Regulatory Cor.ission (the Commission) has found that:
A.
The application for amendment by Georgia Power Company, et al.,
(the licensee) dated October 29, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Commission; C,
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with t3e Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
80112.6080/
-y
- i Accordingly, the license is amended by changes to the Technical Spec-2.
ifications as indicated in the attachment to this license amendment No. DPR-57 is and rparagraph 2.C.(2) of Facility Operating Licenra hereby amended to read as follows:
Technical Specifications The Technical Specifications containec in Appendices A and B, as revised through Amendment No. 80, are hereby incorporated in the license. The licensee shall oper;te the facility in accordance with the Technical Specifications.
3.
This amendment is effective October 29, 1980.
FOR THE NUCLEAR REGULATORY C0RilSSION C5 /v/ W/. &
Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing
Attachment:
Changes.to the Technical Specifications Date of Issuance: Novembe r. 13, 1980 4
ATTACHMENT TO LICENSE AMENDM'ENT NO.-80 FACILITY OPERATING LICENSE NO. DPR-57 DOCKET NO. 50-321 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
Remove Insert 3.5-12 3.5-12
.n l
j SURVEILLANCE REQUIREHENTS t
LIMITING COND7TIONS EOR OPERATION 4.5.J Plant Service Water System f
3.5.J Plant Service Water System 1.
The automatic pump-start 1.
Normal Availability functions and automatic isolation functions shall The reactor shall not be be. tested once per operating made critical from the
- cycle, cold shutdown condition unless the Plant Service Water System (including 4 plant service water pumps and the standby sewice water pump) is operable.
2.
Inoperable Components 2.
Inoperable Components a.
With the standby service The standby service water water subsystem inoperable 3
d.
pump may be-inoperable for for up to 60 days, provide i
a period not to exceed 60 Unit I service water cooling days provided that an alter-to the IB diesel generator nate Unit 1 plant se rvice by verifying OPERABILITY of an water cooling source to the alternate Unit 1 service water 1B diesel generator is cooling source within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Otherwise, declare'the IB diesel generator' inoperable and take the action required by Specification 3.9 B.2.
b.
When one PSW pump is made b.
One PSW pump may be in-or found to be inoperable, operable for a period not to exceed 30 days provided the standby ser' ice water pump, the three remaining all diesel generators are PSW pumps, both PSW divisions ope rable..
I and all three diesel genera-tors, shall be demonstrated to be operable immediately and weekly thereafter.
c.
When one PSW pump and the
.One PSW pump and the stand-c.
standby service water pump by service water pump may are made or found to be be inoperable for a period not to exceed 30 days pro-inoperable, the three re-maining PSW pumps, both PSW vided all diesel generators divisions, and all three are operable.
diesel generators, shall be' demonstrated to be operable immediately and weekly there-l after.
1 d.
When two PSP pumps or one PSW i'
d.
Two.PSW pumps or one PSW
' division are made or'found to division may be inoperable for a period not to exceed 7 days be inoperable, the standby provided the diesel generators
- service water pump and all associated with'the operable active components of the PSW' components are operable.
operable division or divi-sions and the diesel generators assoc?atad with the operable PSW C 2ponents, shall be demonstroh'd Amendment No. Jef, 80 3.5-12 to be' operable immediately and daily thereafter.
. -,