05000368/LER-1980-062, Forwards LER 80-062/03L-0

From kanterella
(Redirected from ML19344F423)
Jump to navigation Jump to search
Forwards LER 80-062/03L-0
ML19344F423
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/09/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19344F424 List:
References
2-090-10, 2-90-10, NUDOCS 8009150258
Download: ML19344F423 (1)


LER-1980-062, Forwards LER 80-062/03L-0
Event date:
Report date:
3681980062R00 - NRC Website

text

e ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371 t.000 September 9, 1980 2-090-10 Mr. K. V. Seyf rit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Subject.

Arkansas Nuclear One-Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 80-062/03L-0 (File:

2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One-Unit 2 Technical Specification 6.9.1.9.a, attached is the subject report concerning the failure for the power uncertainty bias terms within the core: protection calculators.

This LER is being submitted late due to an ad:ninistrative oversight which resulted in a delay in the preparation of this LER. The frequency of review of the LER status log will be increased to preclude future problems in this area.

Very truly yours, b4EY f.

't David C. Trimble Manager, Licensing DCT:GAC:tw Attachment cc: Mr. V. Stello, Jr. Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. Norman, M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8009150.25&-

[

3 usuesa uioote sour-uritivies svsreu