Forwards IE Insp Rept 50-302/80-26 on 800630-0703.No Noncompliance Noted
ML19344F299
Person / Time
Site: Crystal River 
Issue date: 07/25/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19344F300 List:
References
NUDOCS 8009150104
Download: ML19344F299 (2)


See also: IR 05000302/1980026

Text

r:

g

/

\\

UNITED STATES

8'

N

NUCLEAR REGULATORY COMMISSION

$

,E

REGION il

+

b[

101 MARIETTA sT., N.W.. SUITE 3100

Q

%

o

ATLANTA, GEORGIA 3o3o3

JUL 2 51980

In Reply Refer To:

RII;EHB

m

g0-302/80-26)

.

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

P. O.' Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

'Inis refers to the inspection conducted by E. H. Brooks of this office on June 30 -

July 3,1980, of activities authorized by NRC Operating License No. DPR-72 for

the Crystal River facility, and to the discussion of our findings held with

P. F. McKee at the conclusion of the inspection.

.-

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of proced:7res and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Eoom.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proirrietary information identified in the application is contained in a

separate 'paYt of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

i

Should you have any questions concerning this letter, we will be glad to discuss

l

them with you.

!

Sincerely,

.

.6.

l

.

. C.

ewis, Acting Chief

I

Reactor Operations and Nuclear

Support Branch

i

Enclosure:

(See Page 2)

8009150\\

__

_,

.

. - - .

- _ _ , _ .

-

_

._. _

t-

<

., .

Florida Power Corporation

- -2-

~

JUL 2 51980 '

+

.

Enclosure:

Inspection Report No. 50-302/80-26

e:. w/ encl:

L. C. Poole, Nuclear Plant Manager-

-

.:

,

.

$

.

.

. l

- i

i

i

i

.

.

9

e

L__

"- __

d

,, ,

,

,,

-

--r

^-ww'r

v"''''N

~ * ' * "

  • - F

" ' ' " " ' '