ML19344F027

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-460/80-08 & 50-513/80-08 on 800714-18.No Noncompliance Noted
ML19344F027
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/12/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferquson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19344F028 List:
References
NUDOCS 8009120304
Download: ML19344F027 (2)


See also: IR 05000460/1980008

Text

, . .

77G

,

o

UNITED STATES

84

NUCLEAR REGULATORY COMMISSION

3 .f, (

M

t; .*

ej

REGION V

85 %

g

1990 N. CALIFORNIA Bout.EVARD

'O

D

SUITE 202, WALNUT CREEK PLAZA

,o

  • e

,*

WALNUT CREEK, CALIFCPN?A 94S96

AUG 1 2 1980

Docket flos. 50-460, 50-513

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. R. L. Ferguson

ifanaging Director

Gentlemen:

Subject: flRC Inspection at Washington Nuclear Projects 1 and 4

This refers to the inspection conducted by Messrs. G. Hernandez and

W. J. Wagner of this office on July 14-18, 1980 of activities authorized

by flRC Construction Pemit Nos. CPPR 134 and 174, and to the discussion of

our findings held oy Mr. Hernandez and Mr. Wagner with Mr. A. D. Kohler

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective er.aminations

of procedures and representative records, and interviews with personnel.

fio items of noncompliance with flRC requirements were identified within the

scope of this inspection.

In accordance with Section 2.790 of the flRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the flRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that s;ch infomation be withheld

from public disclosure. The application must include a full statement of the

reasons why it is claimed that the infomation is proprietary. The application

should be prepared so that any proprietary infomation identified is-contained

in an enclosure to the application, since the application without the enclosure

Nill also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

80 09.I20 3p q

-

._.

_

_

_ ._

..

l

Washington Public Power Supply System

-2-

AUG 121960

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

'

Sincerely,

!

,

G. S. S neer, Chief

Reactor Constructior.and.

'

!

Engineering Suppo',t Branch

Enclosure:

IE Inspection Reports

Nos. 50-460/80-08

50-513/80-08

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

J. P. Thomas, Project Manager, WPPSS

l

l

m