[ Td
[
UNITED STATES 8"
~
o NUCLEAR REGULATORY COMMISSION o,!
REGION 1 Q'+, *....,o',#
631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 August 27, 1980 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN:
Mr. G. Carl Andognini, Manager Nuclear Operations Department 800 Boylston Street' Boston, Massachusetts 02199 Gentlemen:
The enclosed IE Information Notice No. 80-31, "Maloperation of Gould-Broin Boveri Type 480 Volt Type K-6005 and K-00N 6005 Circuit Breakers," is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, C
Boyce H. Grier Director
Enclosures:
l 1.
IE Information Notice No. 80-31 2.
List of Recently Issued IE Information Notices CONTACT:
S. D. Ebneter (215-337-5283) l cc w/encls:
P. J. McGuire, Pilgrim Station Manager
.800g;gnj h
~
s SSINS No.: 6870 Accession No.:
8006190040 IN 80-31 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 August 27, 1980 IE Information Notice No. 80-31:
MALOPERATION OF GOULD-BROWN B0 VERI 480 VOLT-TYPE K-6005 AND K-DON 6005 CIRCUIT BREAKERS Description of Circumstances:
The Cincinnati Gas & Electric Company reported problems with the Gould-Brown Boveri Type K-600S and K-DON 6005 circuit breakers used in 480 volt a.c.
circuits at the William H. Zimmer nuclear stations. The problem involved inadvertent circuit breaker closure during operation of the breaker charging springs when the breaker was racked out to the test position.
The problem resulted from the use of undersized bushings in the circuit breaker secondary close latches.
The undersized bushings caused the secondary close latch to hang-up on the shunt trip device resulting in an inadvertent circuit breaker closure when the spring charging motor was energized.
The vendor has stated that the problem does not exist during normal operations with the circuit breaker in the connected position.
Recommended Action for Licensees and Holders of Construction Permits:
All licensees of operating nuclear power reactors and holders of construction permits should te aware of the potential problems described above.
The vendor has stated that a small number of circuit breakers were assembled with under-sized secondary latch bushings between 1969 and 1977.
It is recommended that the following actions be taken:
(1) Determine if the subject circuit breakers are installed in any safety-related application at your facility.
The affected circuit breakers are manufactured by Gould-Brown Boveri and are types K-600S and K-DON 6005, 480-volt a.c. electrically operated, drawout type with static trip device.
(2) If it is determined that your facility has the circuit breakers described in Item (1) above, perform the K-6005, K-DON 6005 Field Test Procedure attached to this information notice (Gould-Brown Boveri I.B.-9.1.7-6 Issue F, Addendum 2, dated March 4, 1980).
(3)
If maloperation of the circuit breaker occurs during performance of the field test procedure described in Item (2) above, perform the corrective action described in the attached field test procedure (installation of a 0.050 shim to the secondary close latch and retest of the circuit breaker).
w IN 80-31 August 27, 1980 Page 2 of 2 No written response to this information notice is required; however, if additional information is required, contact the Director of the appropriate NRC Regional Office.
Enclosure:
Excerpt from Gould-Brown Boveri Letter to NRC Region III dated June 2, 1980, i
T A
J
~e n,-e
, e >
--.re-.
a-
--emn-,-
e--
. ~ - -.
,,,w.m,
,-w-,,,--r,-
r IN 80-31 August 27, 1980 Excerpt from Gould-Brown Boveri I.8.-9.1.7.6 Issue F, Addendum 2, Page 1, dated March 4, 1980 K-6005, K-DON 6005 FIELD TEST PROCEDURE CAUTION:
REFER TO I.B-9.1.7-6 FOR CIRCUIT BREAKER INSTRUCTIONS AND SAFETY PROCEDURES A.
This procedure is to be performed to determine if the secondary close latch hangs up on the shunt trip device causing inadvertent closing of the circuit breaker at the completion of the closing springs charging.
1.
Rack out the circuit breaker to the test position.
2.
Move the toggle switch to the "on" position to charge the closing springs.
3.
Move the toggle switch to the "off" position.
4.
Perform a trip free operation by holding the manual red trip button in and lifting the manual close lever to discharge the closing springs.
(The breaker should not close) 5.
Move the toggle switch to the "on" position to charge the closing springs.
Note at the end of tne charging if the breaker inadvertently closed.
6.
If the breaker closed during Step 5, then it has failed and a 0.050 shim must be added per page 2 of this procedure.
7.
If the breaker 'did not inadvertently close during Step 5, then Steps 3 thru 5 should be repeated twelve times without failure.
A 0.050 shim Just be added if any failures occur.
B.
If it was necessary to install a 0.050 shim, then repeat Steps 3 thru 5 twelve times to check that the breaker does not inadvertently close.
n IN 80-31 August 27, 1980 Excerpt from Gould-Brown Boveri I.B.-9.1.7-6 Issue F, Addendum 2, Page 2, dated March 4, 1980 PROCEDURE FOR ASSEMBLING SHIM IN K-600S, K-DON 600S BREAKER WITHOUT REMOVING THE OPERATING MECHANIS_M CAUTION:
REFER TO I.B-9.1.7-6 PAGE 10 FOR CIRCUIT BREAKER REMOVAL (DRAWOUT TYPE) BEFORE PROCEEDING.
DISASSEMBLY:
1.
Tilt breaker back, loosen wires by removing cleat 650441-D, from left side of breaker frame.
l 2.
Remove relay from bottom of breaker by removing screws that hold relay.
Do not disconnect wires.
3.
Block jack bar open to move arm away from mag-latch.
l 4.
Enter through left side of breaker and remove three screws, 54341-E2, that hold the mag-latch to the mechanism side plate.
Slide mag-latch and shunt trip away from mechanism frame.
Use care not to disconnect spring, 650216-A11, between primary latch and mag-latch.
ASSEMBLY:
1.
Slide shim, 711917-8, in between mechanism side plate and mag-latch and reattach mag-latch with longer screws, 54341-E3.
2.
Tighten screws, making sure spring, 650'216-A11, is connected.
3.
Replace parts in reverse order.
~
~
IE Information Notice No. 80-31 August 27, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued to Notice No.
Issued 80-30 Potential for Unaccept-8/27/80 All holders of able Interaction a BWR power reactor Between the Control OL or CP Rod Drive Scram Function and Non-essential Control Air at Certain BWR Facilities 80-29 Broken Studs on 8/7/80 All holders of 4
Terry Turbine a power reactor Steam Inlet Flange OL or CP Supplement Notification of 7/29/80 All holders of a to 80-06 Significant Events power reactor OL at Operating Power and near term OL Reactor Facilities applicants 80-28 Prompt Reporting 6/13/80 All applicants of Required Information for and holders To NRC of a power reactor construction permit 80-27 Degradation of Reactor 6/11/80 All holders of Coolant Pump Studs a pressurized water power reactor OL or CP 80-26 Evaluation of 6/10/80 All holders of a Contractor QA Part 50 License Programs 80-25 Transportation of 5/30/80 Material Licensees Pyrophoric Uranium in Priority / Categories II-A, II-D, III-I and IV-DI; Agreement State Licensees in equivalent categories 80-24 Low Level Radioactive 5/30/80 All holders of an Waste Burial Criteria NRC or NRC Agreement State License 80-23 Loss of Suction to 5/29/80 All holders of a Emergency Feedwater power reactor OL Pumps or CP