ML19344E749
| ML19344E749 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/28/1980 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19064A123 | List: |
| References | |
| NUDOCS 8009110188 | |
| Download: ML19344E749 (2) | |
See also: IR 05000327/1980026
Text
,o
EltFdA!.1:we .au e. i..n...I
.
t )
C0HTAINS 2390lNF0EMAT10N
!, ,,7b
4
o
UNITED STATES
g
.g
8
NUCLEAR REGULATORY COMMISSION
o
i
' $
E
REGION 11
'
l'
I
101 MARIETTA ST
N.W., SUITE 3100
ATLANTA, GEORGIA 30303
.....
JUL 2 81980
In Reply Refer To:
RII:WJT
50-327/80-26
.
Tennessee Valley Anthority
ATTN:
h. G. Parris
Manager of Power
'500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by W. Tobin of this office on July 8-9,
1980, of activities. authorized by NRC Operating License No. DPR-77 at Sequoyah
Nuclear Plant and to the discussions of our findings held with W. Popp at the
conclusion of the inspection.
"
Areas examined during this inspection included your physical security program as
implemented under the provisions of Title 10, Code of Federal Regulations, Part
73, " Physical Protection of Plants and Materials" and the specific requirements
of your approved Security Plan. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, performance tests, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved. Details of activities involving
safeguards and security measures are exempt from disclosure in accordance with
10 CFR 2.790(d). Therefore, your response should be incorporated in a separate
paper and referenced in your reply.
I
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
l
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter with the exception of the report cover page, which is an inspec-
tion summary, will not be placed in the Public Document Room.
.
8009110/M
MATERLP.tMETTED HENH
CONTAINS 2J50INFORMATiGN
.
.
MATERLALTF1J:SMITTED HEREW TH
OL 2 31980
CONTAINS 2.733 INEDW1.T!DN
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
',-
=
.
.
_a
W.
. Kenia, Chief
Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation
(Exempt fror Disclosure)
2.
Inspection Report No. 50-327/80-26
3.
Inspection Summary
(Not Exempt)
cc w/ encl:
G. G. Stack, Project Manager
,.
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
'
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
i
l
l
I
l
t
MATERIAL TP1E'ITED HEREWITH
l
CONTAINS 2.790 INFORMAItDN