ML19344E723
| ML19344E723 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/25/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| Shared Package | |
| ML19344E724 | List: |
| References | |
| NUDOCS 8009110047 | |
| Download: ML19344E723 (2) | |
See also: IR 05000334/1980012
Text
l
~ . ,
J
4
[
%
UNITED STATES
'4
NUCLEAR REGULATORY COMMISSION
w
w
[
o
REGION l
E
531 PARK AVENUE
'4
KING OF P8 TUSSI A. PENNSYLVANI A 19406
....*
JUL 2 512
Docket No. 50-334
Duquerne Light Company
'
ATTN: Mr. C. N. Dunn
Vice President
Operations Division
435 Sixth Avenue
Pittsburgh, Pennsylvania 15219
Gentlemen:
Subject:
Inspection 50-334/80-12
This refers to the routine inspection conducted by Mr. J. D. Hegner of this
office on April 20 - May 31, 1980 at the Beaver Valley Power Station, Unit 1,
Shippingport, Pennsylvania of activities authorized by NRC License No. DPR-66
and to the discussions of our findings held by Messrs. Hegner and Beckman with
Mr. J. A. Werling and others of your staff periodically during and at the con-
clusion of the inspection.
. Areas examined during this inspection are described in the Office of Inspection
'
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspaction
!
report will be placed in the NRC's Public Document Room.
If this report contdns
'
any information that you (or your contractor).believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
t
possible into a separate part of the affidavit.
If we do not hear from you in
l
this regard within the specified period, the report will be placed in the Public
Document Room.
l
!
8009110osl7
- .
..
.-
.
. . - __
_.
- -
.- .
. -
.
-
_
.
.
Duquesne Light Company
2
JUL 2 51988
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
,
(1
-
=.
m
. Brunner, Chief
Rea tor Operations and Nuclear
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-334/80-12
cc w/ encl:
F. Bissert, Technical Assistant Nuclear
.
R. Washabaugh, QA Manager
J. Werling, Station Superintendent
G. Moore, General Superintendent, Power Stations Department
J. J. Carey, Director of Nuclear Operations
R. Martin, Nuclear Engineer
J. Sieber, Superintendent of Licensing and Compliance, BVPS
,
.