Forwards IE Insp Rept 50-344/80-11 on 800501-30 & Notice of Violation
ML19344E433
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/27/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML19344E429 List:
References
NUDOCS 8008280548
Download: ML19344E433 (2)


See also: IR 05000344/1980011

Text

-

b

b

a

pgg

'

p*#

. UNITED STATES

o

,

LT

7,

NUCLEAR REGULATORY COMMISSION

$,_

a ,$

REGION V

1990 N. CALIFORNI A BOULEVARD

o

[g

SulTE 202, WALNUT CREEK PLAZA

e,,,e

WALNUT CRE E K, CALIFORNI A 94596

JUN 2 71980

Docket No. 50-344

Portland General Electric Company

121 S. W. Salmon Street

Portland, Oregon 97204

l

Attention: Mr. Charles Goodwin, Jr.

Assistant Vice President

Gentlemen:

Subject: NRC Inspection of the Trojan Nuclear Plant

This refers to the inspection conducted by Messrs. M. H. Malmros and G. W.

Johnston of this Office on May 1-30, 1980, of activities authorized by NRC

License No. NPF-1, and to the discussion of our findings held by Mr. Malmros

with Mr. Yundt and other members of your staff periodically during the

inspection.

Areas examined during th9 inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

'

activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

These

items of noncompliance have been categorized into a level as described in our

correspondence to all NRC licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201, of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20) days

of your receipt of this notice, a written statement or explanation in reply

including (1) corrective steps which have been taken by you and the results

achieved; (2) ccrrective steps which will be taken to avoid further violations,

'

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

,

inspection report will be placed in the NRC's Public Document Room.

If this

i

,800828e gqq

-- _

.

-

_.

._

..

..

.

.

--..

-

--__ -

. - - . - - - - _ - .

.

.

,

'

-

.

+

.

a

Portland General Electric Company

-2-

4

4

L

report contains any information that you believe to be proprietary, it is

'

'

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such inforration be withheld from

public disclosure.

The application must include a full statement of the reasons

,

why it is claimed that the information is proprietary. The application should

'

be prepared so that any proprietary information identified is contained in an

,

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in

this reqard within the specified period, the report will be placed in the

!

Public Document Room.

!

l

Should you have any questions concerning this inspection, we will be glad to

1

discuss them with you.

f

Sincerely,

9

.O

, Chief

eactor Operations and

I

'

fluclear Support Branch

Enclosures:

,

1.

Notice of Violation - APPENDIX A

t

2.

IE Inspection Report

.,

No. 50-344/80-11

cc w/o Enclosure 2:

C. P. Yundt, PGE

F. C. Gaidos, PGE

,

j

J. W. Lentsch, PGE

j

i

f

i

I

i

l