ML19344E257
| ML19344E257 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 07/24/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19344E258 | List: |
| References | |
| NUDOCS 8008280274 | |
| Download: ML19344E257 (2) | |
See also: IR 05000454/1980010
Text
- g eog'o,,
,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
IjO
~
3
n
,
'
O
$
.E
REGION 111
% . . . . . e'['
799 ROOSEVELT ROAD
'
t,
GLEN ELLYN. ILLINOIS 6o137
JUL 2 4 880;
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Eox 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Mr. C. E. Jones of this office
on June 9-12, 1980, of activities at Byron Nuclear Power Plant, Units 1
and 2, authorized by NRC Construction Permits No. CPPR-130 and No. CPPR-131
and to the discussion of our findings with Mr. G. Sorensen and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
l
or your contractors believe to be proprietary, you must apply in writing
i
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be preparedvso that proprietary
information identified in the npplication is coptained in an enclosure
i
to the application.
t
l
s
,8 0 0 8 2 8 0 g7tf
-
-
. . - _
.
_ _ - -
- .
,
Commonwealth Edison Company
-2-
'
'
.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
i
r"~
' sest'M
G.
iorelli, Chief
Reactor Construction and
l
Engineering Support Branch
Enclosure:
IE Inspection
'
Reports No. 50-454/80-10
and No. 50-455/80-09
cc w/ encl:
Mr. D. L. Peoples, Director
of Nuclear Licensing
Gunner Sorensen, Site
Project Superintendent
Central Files
Reproduction Unit NRC 20b
l
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
Myron M. Cherry, Chicago
,
,
i
'
- -
- - - -
. -
_ _ _ _ _ . , _ - _ . .
..
. _ _ _ _
_ _ _ _ _ - _ _ _ _
-