ML19344E217
| ML19344E217 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 06/09/1980 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML19344E215 | List: |
| References | |
| NUDOCS 8008280118 | |
| Download: ML19344E217 (2) | |
See also: IR 05000213/1980009
Text
..
.
hf
%g -
UNITED STATES
g
- g
NUCLEAR REGULATORY COMMISSION
j
j
REGION I
e
g
631 PARK AVENUE
cf
KING OF PRUS$1 A, PENNSYLVANI A 19406
M 09 M
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-213/80-09
This refers to the inspection conducted by Mr. J. A. Serabian of this office on
May 4 and 5,1980 of activities authorized by NRC License No. DPR-61 and to the
discussions of our findings held by Mr. Serabian with Mr. R. H. Graves of your
staff at the conclusion of the inspection, and to a subsequent telephone dis-
cussion between Mr. J. Ferguson of your staff and Mr. J. Serabian on May 21,
1980.
The inspection wr.s an examination of activities conducted under your license as
they relate to radiation safety and to compliance with the Comission's rules
and regulations and the conditions of your license. The inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office, within
twenty (20) days of your receipt of this notice, a written statement or explanatial
in reply including:
(1) corrective steps which have been taken by you and the
results achieved; (2) corrective steps which will be taken to avoid further
items of noncompliance; and (3) the date when full compliance will be achieved.
Item number 1 shown in the Notice of Violation enclosed with this letter, is a
recurrent or uncorrected item.
In your response please give this matter your
particular attention.
.8 0 0 8 2 8 o rig
.
-
-
--
-
-_
e
e
'
.
.
Connecticut Yankee Atomic
,
Power Company
2
'
JUN 0 9 M
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such infonnation from public disclosure. Any such application must be accompanied
by.an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790. The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleasad to
discuss them with you.
Sincerely,
)
..
g
Geo ge H. Smith, Chief
Fupi Facility and Materials Safety
B anch
Enclosure:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-213/80-09
cc w/ encl:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himelwright, Licensing Safeguards Engineer
L. Barrett, NRR, HQ
..
- -
..
.
__