ML19344E217

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/80-09 on 800504-05 & Notice of Violation
ML19344E217
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/09/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19344E215 List:
References
NUDOCS 8008280118
Download: ML19344E217 (2)


See also: IR 05000213/1980009

Text

..

.

hf

%g -

UNITED STATES

g

  • g

NUCLEAR REGULATORY COMMISSION

j

j

REGION I

e

g

631 PARK AVENUE

cf

KING OF PRUS$1 A, PENNSYLVANI A 19406

M 09 M

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-213/80-09

This refers to the inspection conducted by Mr. J. A. Serabian of this office on

May 4 and 5,1980 of activities authorized by NRC License No. DPR-61 and to the

discussions of our findings held by Mr. Serabian with Mr. R. H. Graves of your

staff at the conclusion of the inspection, and to a subsequent telephone dis-

cussion between Mr. J. Ferguson of your staff and Mr. J. Serabian on May 21,

1980.

The inspection wr.s an examination of activities conducted under your license as

they relate to radiation safety and to compliance with the Comission's rules

and regulations and the conditions of your license. The inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office, within

twenty (20) days of your receipt of this notice, a written statement or explanatial

in reply including:

(1) corrective steps which have been taken by you and the

results achieved; (2) corrective steps which will be taken to avoid further

items of noncompliance; and (3) the date when full compliance will be achieved.

Item number 1 shown in the Notice of Violation enclosed with this letter, is a

recurrent or uncorrected item.

In your response please give this matter your

particular attention.

.8 0 0 8 2 8 o rig

.

-

-

--

-

-_

e

e

'

.

.

Connecticut Yankee Atomic

,

Power Company

2

'

JUN 0 9 M

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such infonnation from public disclosure. Any such application must be accompanied

by.an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleasad to

discuss them with you.

Sincerely,

)

..

g

Geo ge H. Smith, Chief

Fupi Facility and Materials Safety

B anch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-213/80-09

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himelwright, Licensing Safeguards Engineer

L. Barrett, NRR, HQ

..

- -

..

.

__