ML19344D764

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-325/79-42 on 791127-29.No Noncompliance Noted
ML19344D764
Person / Time
Site: Brunswick 
Issue date: 03/13/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19344D765 List:
References
NUDOCS 8004280150
Download: ML19344D764 (2)


See also: IR 05000325/1979042

Text

. _ _ _

fN

'

'

,

'o

UNITED STATES

!

g

NUCLEAR REGULATORY COMMISSION

o

$

'

a

REGION ll

101 MARIETTA ST N.W SUITE 3100

o

ATLANTA, GEORGIA 30303

.....

MAR 1 31980

!

In Reply Refer To:

-

RII:BWR

50-325/79-42

i

Carolina Power and Light Company

ATTN:

J. A. Jones

,

Senior Executive Vice President and

Chief Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

.

Gentlemen:

This refers to the special inspection conducted by J. E. Ouzts of this office on

i

November 27-29, 1979, of activities authorized by NRC Operating License No. DPR-71

for the Brunswick facility, and to the discussion of our findings held with

A. C. Tollison, Jr. at the conclusion of the inspection.

This special inspection was conducted to review the circumstances of Unit I trip

on November 20, 1979. Areas examined during the inspection and our findings are

discussed in the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

P

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

.

that proprietary information identified in the application is contained in a

e

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

l

l

i

I

'O

800428o gas o

.

.

MAR 1 31980

%

Carolina Power and Light

-2-

Company

Should you have any questions concerning this letter, we uill be glad to discuss

them with you.

.

Sincerely,

i

i

8.C.

i

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

[

Enclosure:

.

Inspection Report No. 50-325/79-42

cc w/ enc 1:

A. C. Tollison, Jr.

Plant Manager

Box 458

Southport, NC 28461

'

l

.

>

.

i

k

i

l

,

I

, , ,