Forwards IE Insp Repts 50-361/80-04 & 50-362/80-02 on 800219-29.No Noncompliance Noted
ML19344D746
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/20/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Paypay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML19344D747 List:
References
NUDOCS 8004280092
Download: ML19344D746 (2)


See also: IR 05000361/1980004

Text

r.--

-

._ __

>R MGy

\\

UNITED STATES

['} g 'j

NUCLEAR REGULATORY COMMISSION

7,. Q

ny

REGION V

1990 N. CALIFORNI A BOULEVARD

o,

.

%*

,o*g

SUITE 202, WALNUT CREEK PLAZA

    • ,,*

WALNUT CREEK, CALIFORNIA 94596

E'G.L

u)

Docket Nos. 50-361

50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay

Vice President, Advanced Engineering

Gentlemen:

Subject: NRC Inspection at San Onofre Units 2 and 3

This refers to the inspections conducted by Mr. R. J. Pate of this

office during the period February 19-29, 1980 of activities authorized

by NRC Construction Permit Nos. CPPR-97 and 98, and to the discussions

of his findings held with Mr. D. E. Nunn and other members of your

staff on February 29, 1980.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector. No

items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10 Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

i

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such ir. formation be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure

to the application since the application without the enclosure will also

l

l

l

8004gggon

,

.

- i

. E30

Dr. L. T. Papay

-2-

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will

be glad to discuss them with you.

Sincerely,

_ h Y " , Chief

"~

$

G. S. Spencer

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/80-04

50-362/80-02

cc w/o enclosure:

R. Dretch, Vice President

Nuclear Engineering & Operations SCE

I

.