Detroit 2%3 Second Avenue Harry Tauber Detroa. %:ngan 4822S y ec s es y (313) 237 8000 Enyewrg n: 2reue m Fetzuary 12, 1980 EF2 - 34,933 Supplement I Mr. S. A. Varga, Acting Assistant Director Division of Project Managenent Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Camtission Washington, D. C. 20555
Dear Mr. Varga:
Reference:
Enrico Fermi Atanic Power Plant - Unit 2 BRC Docket tb. 50-341
Subject:
Subnittal of Additional Infomation Fermi 2 unique contairrnent design infonnation was subftitted as part of FSAR Section 3.8, Amendment 12.
In addition, the follow-ing generic Mark I Owners Group documents have been trarsritted to the NRC by General Electric and determined by Fdison to be applicable to the Fermi 2 docket.
1.
NEDO-21878, Septenber 1979, " Mark I Containment Prcgram Analytical Model for Canputing Air Bubble and Bouriary Pressures Resulting fran an F/RV Discharge Through a T-Quencher Device," Task Number 7.1.1.2, transmitted via General Electric letter dated January 9, 1980, fran L. J. Sobon to D. G. Eisenhut.
2.
NEDO-21973, Septenber 1979, " Mark I contairrnent Program Canparison of General Electric ard ERI 'Ibrus load Test Results," Task Bunter 5.10, transmitted via General Electric letter dated January 10, 1980, fran L. J. Sobon to D. G. Eisenhut.
l l
3.
NEDO-21983, Septenter 1979, " Mark I Containment Program l
Suhnerged Structures M3 del Main Vent Air Discharges Evaluation Report," Task Number 5.14.1, transmitted via General Electric letter dated January 10, 1980 fran l
L. J. Sobon to D. G. Eisenhut.
l
\\
Q)kt' O
\\
t 80031do 5 H O
Mr. S. A. Varga February 12, 1980 Page 2 4.
NEDO-23817, August 1979, " Mark I Containment Program, 1/4 Scale 'Ibst Report Loads on Suttnerged Structures Due to IOCTs Air Bubbles and Water Jets," Task thrter 5.14, trans-mitted via General Electric letter fran L. J. Sobon to D. G. Eisenhut.
5.
NEDO-23898, August 1979, " Mark I Contaurent Program Analytical Model for Carputing Water Rise in Safety /Re~
lief Valve Discharge Lim following Valve Closure,"
Task thz6er 7.1.2.2, transmitted via General Electric letter dated January 9,1980 fran L. J. Sobon to D. G. Eisenhut.
6.
NEDO.-24539, August 1979, " Mark I Containment Program, Full Scale Test Progran Final Report," Task Number 5.11, trans-mitted via General Electric letter dated October 2, 1979 fran L. J. Sobon to D. G. Eisenhut and ERATA to IEDE 24539-P transmitted via General Electric letter dated Noveter 27, 1979 fran L. J. Sobon to.D. G. Eisenhut.
7.
NEDO-24583-1, October 1979, " Mark I Containment Program
- Structural Acceptance Criteria Plant Unique Analysis Appli-cation on Guide," Task Number 3.1.3, transmitted via General Electric letter dated December 27, 1979 fran L. J. Sobon to D. G. Eisenhut.
8.
NEDO-21944, June 1979, " Mark I Containment Program Quarter Scale Plant Unique Tests, Volume 1 and Volume 2," Task Nu2er 5.5.3, transmitted via General Electric letter dated October 4,1979 fran L. J. Sobon to D. G. Eisenhut.
9.
NEDO-21944, June 1979, " Mark I containment Program Quarter Scale Plant Unique Tests," Task Ntrter 5.5.3, Series 2, Volume 3 and 4, transmitted via General Electric letter dated October 4,1979 fran L. J. Sobon to D. G. Eisenhut.
10.
NEDO-24542, August 1979, " Mark I Containment Program Monti-cello T-Quencher Thermal Final Report," Task Nu:&er 7.5.2, transmitted via General Electric letter dated October 2, 1979 fran L. J. Sobon to D. G. Eisenhut.
11.
eDO-24549, June 1979, " Mark I Containment Program Final teport 1/4 Scale T-Quencher Test," Task Nuter 6.2.1, trans-mitted via General Electric letter dated October 4, 1979 fran L. J. Sobon to D. G. Eisenhut.
3, Mr. S. A. Varga
- February 12, 1980-Page 3 12.
NEDO.-24645, August 1979, " Mark I Containment Program Analysis of Full Scale Test Facility for Condensation Ioading," Task Ntznber 5.17.3, transmitted via General Electric letter dated October 2,1979 frcxn L. J. Sobon to D. G. Eisenhut.
-If you have any questions concerning the above, please let us know.
Sincerely, MU/DFI/dk cc: