(A k) 8 880 0g UNITED STATES NUCLEAR REGULATORY COMMISSION f
R EGION ill o
'f 799 ROOSEVELT ROAD e
k, 8
GLEN ELLYN, ILUNOIS 60M7 UAN 3 Iggg s-g Docket No. 50-341
)
The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Acenue Detroit, MI 48226 Gentlemen:
Thank you for your final report dated December 28, 1979, pursuant to 10 CFR 50.55(e) regarding damaged penetrations at Enrico Fermi Nuclear Power Plant, Unit 2.
We do not consider your report to be final because the manufacturer has not completed their review and evaluation of the deflections to installed penetrations. Your final report should provide the disposition of each or each group of penetrations. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, s.'
~h sMPL_
Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney 1844 27 800131015 0
.