ML19344D385

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-67 & 50-328/79-34 on 791204-07.No Noncompliance Noted
ML19344D385
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19344D386 List:
References
NUDOCS 8003120239
Download: ML19344D385 (2)


See also: IR 05000327/1979067

Text

_

_ .- .

- .

. _ _ _ -

~

.

'o

UNITED STATES

8

8

NUCLEAR REGULATORY COMMISSION

398

o

$

E

REGION 11

o,

101 MARIETTA ST

N.W., SUITE 3100

%*****o

ATLANTA, GEORGIA 303o3

JAN

4 1980

In Reply Refer To:

-RII:TDG

l

50-327/79-67

50-328/79-34

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office on

December 4-7, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the dis-

>

cussion of our findings held with J. E. Wilkins at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

p-aprietary, it is necessary that you make a written application within 20 days

this office to withhold such information from public disclosure.

Any such

'

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

O

Sincerely,

$

/

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

-Enclosures:

(See Page 2)

8003120 2 39

s

.

.

Tennessee Valley Authority

-2-

JAN

4 1980

1

Enclosures:

Inspection Report Nos. 50-327/79-67

and 50-328/79-34

cc w/ encl:

G. G. Stack, Project Manager

P; 0. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN -37319

Thomas B. Northern, Jr., Construction Engineer

P. O. Box 2000

Daisy, TN .37319

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902

>

-