Forwards IE Insp Repts 50-250/79-42 & 50-251/79-42 on 791226-27.No Noncompliance Noted
ML19344D089
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/30/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML19344D090 List:
References
NUDOCS 8003110211
Download: ML19344D089 (2)


See also: IR 05000250/1979042

Text

_

..

-

--

/,~

m~.e

UNITED STATES

M/

'%

8"T

T 'n

NUCLEAR REGULATORY COMMISSION

'

$g

E

REGION 11

.:

%**V 'o[

0, f'g,!

101 MARIETTA ST., N.W., SUITE 3100

b

ATLANTA, G EORGIA 30303

JAN 3 01980

In Reply Refer To:

RII: GAT

50-250/79-42

50-251/79-42

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. O. Box 529100

Miami, FL 33152

Gentlemen:

This refers to the inspection conducted by G. A. Todd of this office on

December 26-27, 1979, of activities authorized by NRC License Nos. DPR-31 and

DPR-41 at Turkey Point facility and to the discussions of our findings held with

,

H. E. Yaeger at the conclusion of the inspection.

Areas examined during this inspection included your program for nuclear material

control and accountability under the applicable provisions of Title 10, Code of

,

Federal Regulations, Part 70, "Special Nuclear Material", and specific license

conditions. Within these areas, the inspection consisted of selective examina-

tions of procedures and representative records, interviews with personnel,

-

performance tests, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

. *1e 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspe tion report will be placed in NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure. Any such applica-

tion must include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so that

proprietary information identified in the application is contained in a separate

part of the document.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

.

80031102.ll

4-

J AN 3 01980

'

Florida Power and Light Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sine rely,

f

/

'

fW

..-

Q V. B. $cytna, Chief

Safeguafds Branch

Enclosures:

1.

Inspection Report Nos. 50-250/79-42

and 50-251/79-42

(Not Exempt)

2.

Inspection Summary

(Not Exempt)

1

3

cc w/ enc 1:

'

H. E. Yaeger, Plant Manager

P. O. Box 013100

_

Miami, FL 33101

.

I

.