ML19344D071
| ML19344D071 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/31/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19344D072 | List: |
| References | |
| NUDOCS 8003110178 | |
| Download: ML19344D071 (2) | |
See also: IR 05000348/1979039
Text
M
!'
f RU:q'o
$ -342
UNITED STATES
gp
!
g
- .
NUCLEAR REGULATORY COMMISSION
o
$'
I
REGION 11
b[
101 MARIETTA ST., N.W., SUITE 3100
o,
%
ATLANTA, GEORGIA 30303
o
In Reply Refer To:
EC 3 ' 1979
RII:CJ
50-348/79-39
50-364/79-20
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by C. Julian of this office on December 12-
14, 1979, of activities authorized by NRC License No. NPF-2 and Construction Permit
No. CPPR-86 for the Farley Nuclear Plant facility, and to the discussion of our
findings held with W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
perso2nel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sinegrely,
.
,
-
9-,
--
.
R. C. Lewis, Actin
hief
Reactor Operations
d Nuclear
Support Branch
Enclosure:
See Page 2
800311017F
L
,
.
.
%
.
DEC 311979
.
Alabama Power Company
-2-
-
.,
Enclosure:
Inspection Report Nos. 50-348/79-39
and 50-364/79-20
cc w/ enc 1:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
J. T. Young
-
Vice President-Production
Post Office Box 2614
Birmingham, Alabama 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
C. Diddinger, Jr.
Manager-Corporate Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager-
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312
i
e
a
- - -