Forwards IE Insp Repts 50-348/79-39 & 50-364/79-20 on 791212-14.No Noncompliance Noted
ML19344D071
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/31/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19344D072 List:
References
NUDOCS 8003110178
Download: ML19344D071 (2)


See also: IR 05000348/1979039

Text

M

!'

f RU:q'o

$ -342

UNITED STATES

gp

!

g

  • .

NUCLEAR REGULATORY COMMISSION

o

$'

I

REGION 11

b[

101 MARIETTA ST., N.W., SUITE 3100

o,

%

ATLANTA, GEORGIA 30303

o

In Reply Refer To:

EC 3 ' 1979

RII:CJ

50-348/79-39

50-364/79-20

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by C. Julian of this office on December 12-

14, 1979, of activities authorized by NRC License No. NPF-2 and Construction Permit

No. CPPR-86 for the Farley Nuclear Plant facility, and to the discussion of our

findings held with W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

perso2nel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sinegrely,

.

,

-

9-,

--

.

R. C. Lewis, Actin

hief

Reactor Operations

d Nuclear

Support Branch

Enclosure:

See Page 2

800311017F

L

,

.

.

%

.

DEC 311979

.

Alabama Power Company

-2-

-

.,

Enclosure:

Inspection Report Nos. 50-348/79-39

and 50-364/79-20

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

-

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Diddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager-

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312