Provides Info Re once-through Steam Generator Auxiliary Feedwater Nozzle Thermal Sleeve/Collar Weld Attachment,In Response to 800610 Inquiry.Includes Identification of Probable Failure Mode,Interim Actions & Safety Consequences
ML19344B551
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/17/1980
From: Hukill H
METROPOLITAN EDISON CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
TLL-509, NUDOCS 8010210445
Download: ML19344B551 (4)


Text

_-

.. _ I l

Metropolitan Edison Company g-7--

l, ; h, j Z (f (-)

Post Office Box 480 q

Middletown, Pennsylvania 17057 717 944 4041 Writer's Direct Dial Numoer i

i October 17, 1980 TLL 509 Reactor Operations & Nuclear Support Branch l

Attn:

E. J. Brunner, Chief

[

U. S. Nuclear Regulatory Commission Region I l

631 Park Avenue l-King of Prussia, Pa.

19406

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1) l Operating License No. DPR-50 l

Docket No. 50-289 OTSG Auxiliary Feedwater Nozzle Thermal Sleeve / Collar Weld Attachment l

The following information is in response to your inquiry of June 10, 1980 concerning the above mentioned subject.

l l1.. Design / environmental conditions leading to possible degradation of l

subject veld integrity.

Identification of probable failure mode.

' Injection of condensate rir river water into a nozzle thermal sleeve (Figure 1) at steady state temperture will cause thermal shock.

l Translating flow conditions into stress, transient thermal conditions l

create peak principal stresses high enough to produce crack initiation in as little as-10 cycles for a temperture difference, between the sleeve and the collar, equal to 5000F. About 100 cycles can be anticipated for a temperature difference equal to 2500F.

Each of these estimates is based on the'ASME,.BPVC,Section III, Design Fatigue Curves. These temperature differences are realizable as a result of short bursts of cold emergency j

feedwater or more sustained flow using somewhat warmer emergency feedwater.

One emergency feedwater usage represents one thermal fatigue cycle regardless of how many times feedwater was called for during the emergency event or what the feedwater temperature was.

The basis for this assumption is that-once the thermal sleeve was thermally shocked, the peak stress field is constant.

-2.

Interim action taken, ifIany.-

We will partially drain the OTSG and inspect Z-axis nozzles.

If cracking is noted on these nozzles, the remainder.will also_be inspected and weld repaired <as' required. Z-axis nozzles were inspected in 1977 and found 4

\\.

free'~of cracks. _Only two thermal' cycles have been recorded since these g

inspections.

8010210of4 6

[

umwaew cww.n.me cum anan e um sn i,

=-

9:

TLL 509 E. J.~BRUNNER-..

3.

Possible long term modifications.

No long term-design modification is anticipated at this time. Z-axis AFW nozzles will be removed and blanked due to. concern for potential OTSG tube inspection lane flow impingement.

4.' Safety consequences B&W evaluation (TM1-80-053 dated March 17, 1980) of the auxiliary feedwater thermal sleeve / collar weld attachment failure finds that decay heat removal is not impaired if the nozzle is short of the shroud due to either assembly L

tolerance or postulated-backing into the external piping elbows after thermal sleeve separation.

This B&W evaluation does not include the safety consequences of water filling the. steam lines.

The safety consequences of static and dynamic conditions resulting from water accumulating in the main steam line can be addressed in terms of the following terms:

i a.

Unbalanced Forces at Elbows Auxiliary feedwater leakage may result in moisture carryover into the main. steam lines. While the mass of the water content may be low-(8 1/2% leakage, maximum), its velocity is high resulting in high unbalanced forces.

Steam hammer pipe restraints will react the unbalanced forces.

_b.

Filled Main Steam - Deadweight and Increased pressure If the feedwater fills the main steam lines, the additional deadweight can be accommodated by the existing supports.

Internal pressure in the' main steam line will increase because the feedwater pressure exceeds the steam pressure.

The main steam lines are shown to be structurally sound by

. hydro test to 1.5 times the design pressure.

c.

LDischarging of Safety Valves Due to increased pressure' identified in Item 2, above, the spring

-loaded. safety. valves can be expected to'open resulting in higher than normal-discharge forces due to pressure and density effects.

Margin-is'provided via the thermally compensated elbow supports.

.Even if the nominal safety valve reactions are exceeded the thermally compensated supports.will protect the structural

integrity of the main. steam piping. Each of the thermally compensated supports was designed for 55 kips of unbalanced' dynamic
force:as per USAS B31.1-1967.

d.

Seismic Stresses.

For.a full main = steam line, it is likely that the resulting

-seismic stresses will exceed the allowable' values of USAS

~

B31.1-1967. However. the, pressure-boundary may still'be.

J

,p.h y

m

-e w

J w r

O E. J. BFUN'ER TLL 509 preserved due to the existence of steam hammer restraints and pipe deflection limit devices such as rupture restraints and concrete penetrations. Furthermore, simultaneous occurrence of the subject overfill and seismic event are beyond the B&W safety concern and has a very low probability of actual realization.

Sincerely, Signed H.D. Hukill H. D. Hukill Director,TMI-l HDH:DGM:hh Attachment cc: