ML19344B442
| ML19344B442 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 10/06/1980 |
| From: | Jones G BECHTEL GROUP, INC. |
| To: | Thompson D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| REF-PT21-80-263-003 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8010210005 | |
| Download: ML19344B442 (2) | |
Text
~
r w
PART 21 IDENTIFICATION NO, So-%'5-coS COPANY IWE_h.< OkonaM DATE OF LETTER. tobito ID3(ET No. Bo-SM 3FA DATE DISTRIBUTED _ iobolto a.m.
ORIGINAL EPORT SlPPlHENTARY y, 1
DISTRIBUTI_ON:
EACTOR (R) T FLEL CYCLE &
SAFEGUARDS (S)
IEI
.lEFILES IE FILES AD/RDI IEFILES AD/SG AD/RCI AD/FRSI AD/ROI EGIONS 1,II,III,IV,V EGIONS I,II,III,lV,V EGIGiS I,II,Ill,lV,V VBiD3R BR. R-IV VsBOR BR, R-IV VBiD3R BR, R--IV LEB / IPA lib 5715 iPSS/FCFS SS-395 NRP/D3L EOD th3 7602 LDEB ' IPA tiG 5715 gvSS / SG SS-881 NRR/DJE AEDD FIG 7602 LDEB / IPA fig 5715 NRR/DSI dSBPEh!
450 AEOD tiG 7602
~
NMT SAo/SP tiG-7210A ASLBP E/W 450 NRR/DDL
~
CEhTRAL FILES 016 CENTRALFILES 016 ASLBP E/W 450 CENTRAL FILES ( GRON)
CENTPAL FILES (DiR0iG CEiffRAL FILES 016 PDR CENTRALFILES SS-396 CENTRAL FIlfS (DiROBD LPDR PDR PDR TEPA LPDR LPDR TEPA lEPA
~ ACTION:
PRELIMINARY EVALUATION OF THE' ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR FOLLOWJP AS SFOhN BELOW:
IE i NM [
NBES [
OTria ss FFMSI Pa'. 8/.1/80 6,\\so 8010210005 s,
Ofic.h 21 M %'a.3-%
U171 Ul Bechtel Power Corporation Engineers-Constructors h
Fifty Beale Street San Francisco. Cahfornia Mad Aaoress: P.o. Som 3965. San Francisco. CA 94119 October 6, 1980
=.
U. L. riuclear Regulatory Commission Operations Support Washington, D.
C.
20555 Attention:
Dudley Thompson, Executive Officer g
Subject:
10CFR21 Report on Con / Chem Coating Systems M
Reference:
Bechtel letter to NRC dated July 28, 1980 (DCC No. 0165720)
Gentlemen:
The referenced letter contains, in Item 6, a statement which could be subject to misinterpretation.
Please substitute the following for the complete response to Item 6:
"The Hope Creek Generating Station is the only known location among Bechtel Power Corporation projects, in which this coating system has been used in a safety-related area where maintenance of the integrity of the coating system is essential in order not to degrade the proper function of safety-related equipment in that area."
o The above substitution does not alter the accuracy or validity of the original referenced report; it is provided for clarity.
Sincerely yours,
- i i
[~.~.'.T..
B ne Proje Manager m
p.....
I,=.=
GBJ:maq r4
- =.
cc:
J. T. Boettger
_.====:1 2
~*
. =.
.-;h::'. :
,,,.aa e..*
' CCE9. :.._.....7 y__g.:.;;5. :=====