ML19343D207

From kanterella
Jump to navigation Jump to search
Forwards IE Safety Insp Rept 50-327/81-03 on 810105-31.No Noncompliance Noted
ML19343D207
Person / Time
Site: Sequoyah 
Issue date: 03/05/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19343D209 List:
References
NUDOCS 8104090929
Download: ML19343D207 (2)


See also: IR 05000327/1981003

Text

,

3

/b

%s

[

[pper

'o

UNITED STATES

~'

5].

f

NUCLEAR REGULATORY COMMISSION

-n

g

.e

REGION ll

k

~f

101 MARIETTA ST.. N.W., SUITE 3100

p

,

%g

j

\\ggn f;

e

ArtAuTA. csonciA sesos

+.. *

MAR 0 51981

9

.,

j7{b,nr,//

A f/ .

Tennessee Valley Authority

ATTN:

H. G. Parris

gl

4/g. j/

ug

,

-

4r,'d gIl&

Manager of Power

O

08/

500A Chestnut Street Tower II

'g \\

Chattanooga, TN 37401

/;, ..

c

Gentlemen:

SUBJECT: Report No.

81-03

This refers to the routine safety inspection conducted by S. D. Butler of this

office on January 5-31, 1981, of activities authorized by NRC Operating License

No. DPR-77 for the Sequoyah facility, and to the discussion of our findings held

with J. M. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains -

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate. part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

IIwis,A

in Chief

R

Reactor perations and Nuclear

Support Branch

Enclosure:

Inspection Report No.

50-327/81-03

8104099 y .

Q

!

a

.

Tennessee Valley Authority

-2-

MAR 0 F1981

cc w/ encl:

G. G. Stack, Project. Manager

J. M. Balleatine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. .J. Burzynski, Project Engineer .

'

H. N. Culver, Chief, Nuclear Safety-

Review Staff

H. J. Green, Division Director

.

'

b $

%

%

'

d '.$g

g

4 M,,

gO

W

j

g

.

e

k