Responds to NRC 810109 Ltr Re Violations Noted in IE Insp Repts 50-508/80-17 & 50-509/80-17.Corrective Actions:Welders Requalified Under Correct Testing Procedures & New Guided Bend Test Jig Requisitioned
ML19343C682
Person / Time
Site: Satsop
Issue date: 02/19/1981
From: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19343C676 List:
References
GO3-81-510, NUDOCS 8103250025
Download: ML19343C682 (4)


Text

W W shington Public Power Supply System F A JOINT OPERATING AGENCY

r. o. sos $223 itua,wassi%cros 54i enos: tao.i 24,.sooi February 19, 1981 G03-81-510 .g~7; 3s-Nuclear Regulatory Commission, Region V $ Qp x\

Suite 202, Walnut Creek Plaza '

be/e. Wd%

1990 N. California Boulevard M h 4, QTY Walnut Creek, California 94596

, , .h, h.

Attention: Mr. G.S. Spencer, Chief <

Tc i W f

Reactor Construction and Engineering Support Branch Gentlemen:

Subject:

WPPSS NUCLEAR PROJECTS 3 AND 5 NRC INSPECTION OF WNP-3 AND WNP-5 DOCKET NUMBERS 50-508 AND 50-509

Reference:

1). Letter, G.S. Spencer to F.D. McElwee, NRC Inspection at WNP-3 AND WNP-5, dated January 9,1981.

This letter is in response to your letter of January 9,1981 which discussed the results of the inspection conducted December 8-19, 1980 of activities authorized by Nuclear Regulatory Commission Construction Permit Numbers CPPR-154 and CPPR-155. The letter identified one item of noncompliance and required the Supply System to provide a response to this item.

The specific Nuclear Regulatory Commission Finding, as stated in your letter, and the supply System response is provided in Attachment I to this letter.

Should you have any questions to desire further information, please feel free to contact me directly.

Very truly yours, P

T DOBSON Acting Program Director, WNP-3/5 Attachment cc: D. Smithpeter - BPA Ebasco - New York WNP-3/5 Files - Richland 8103250OSS 91-17

1 0 '

[

ATTACHMENT I NUCLEAR REGULATORY COM.9IS$'ON FINDING:

As a result of the inspection conducted on Decerber 8 to 19,1980, and in accordance with the Interim Enforcement Policy, 45 FR56750 (October 7,1980),

the following violation was identified:

10 CFR 50, Appendix 3. Criterien IX, states, in part, that, " Measures shall be established to assure that special processes, including, welding, ...are controlled and accocplished by qualified cersonnel using qualified procedures in accordance with applicaole coces..." ,

Paragraph 17.4.9 of the Quality Assurance Program documented in i the PSAR states, in part, tnat "...Pe. 'ncel performing special processes '

at the ccnstructicn site will be qualified as required by the applicable ccdes and standards..."

Construction contract no. 3240-232 specifies that the AWS Dl.1 Structural Walding Code is the applicable code for structural welding, including qualification. Figure 5.27 of the AWS code identifies the configuration of the guided-bend test jig to be used in testing welcer qualification test coupons. The figure specifies that for material with a yield strength of less than 50,000 PSI the plunger and interior die radii shall be 3/4" and 1-3/16" respectively.

Contrary to the above, on Decer,ber 16, 1980, it was fcund that the site HVAC contractor (contract 3240-232) has been qualifying welders using an improperly sized guided-bend test jig. Welders who have been r.aking qualification test coupens with ASTM A-36 caterial (yield strength r,f approximately 36,000 PSI) have been qualified based on testing with a jig naving plunger and interior die radii of 1" and 1-7/16", respar.tiveiy.

I This is a Severity Level IV violation.

Corrective Stecs Which Have Been Taken And The Results Achieved.

Wallace/ Superior issued Site Nonconformance Report #2853 fated December 17, 1950 for Class I welding and ceased all welder qualification act'vities. The Supply Systea imposed on Wallace/ Superior (letter G03-60-3207 dated December 17,1980)

Stop Work Order #232-02. This stop work order was issued to ensure tr -t corrective action was implemented prior to the resumption of Class I work.

The Contractor identified, as required by the NCR, those welders qualified with  !

the questioned guided bend test equipment and the corresponding Class I producticn welds perforced by those individuals. 'he welders were requalified to the requirements of AWS DI.1. The production welds had been inspected and 3:cepted to the requirements of AWS D1.1. Based on the above actions, the production Class I welds were accepted.

., , - - -.,--m, -

l- s ,

Corrective Steps Which Have Been Taken To Avoid Further Items of Noncompliance:

The guided-bend test jig has been segregated to prevent inadvertant use.

A new guided-bend test jig has been requisitioned by Wallace/ Superior.

The Date When Full Compliance Will Be Achieved:

The rew guided bend test jig arrived at the site in February 1981. Wallace/

Superior has performed receipt inspection of this fixture, and has confirmed conformance with applicable AWS Dl.1 requirements. The Engineer has also con-firmed dimensional conformance with appropriate AWs D1~.1 requirements. However, Stop Work Order 4232-02 documented additional deficiencies outside the bounds of this specific violation. The Stop Work Order will be rescinded when all deficiencies have been resolved satisfactorily.

The position stated in Wallace/ Superior's letter, 232WP-81-0176, dated December 18, 1980, regarding its interpretation of the configuration requirements of the guided-bend test jig as set forth in Figure 5.27 of AWS D.l. has since been confirmed as being valid by the American Welding Society. Therefore,Wallace/

Superior is preparing a response to WPPSS concerning this issue and may request that this violation be recinded.

I l

/< ,

I D. E. DOBSON, Being first .viy sworn, deposes and says: That he is the Acting Program Directc. , WNP-3/5, for the WASHINGTON PUBLIC POWER

~ SUPPLY SYSTEM, the applicant i.srein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the fore-  ;

going and knows the ents thereof; and believes the same to be true to the best of his Kr.owledge.

DATED E82u % (9 a

, 1981.

i m v

, D. E. D0BSON i

STATE OF WASHINGTON )

) ss

COUNTY OF GRAYS HARBOR)

. On this day personally appeared before me D. E. DOBSON to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein1 mentioned.

l 'GIVEN under my hand and seal this l@ day of E6eo n eu , 1981.

t I W

I )

Notary Public in and for the State

( '

of Washincton Residing at d3traaA__,