Text
-
e
,.#7 ana
/
o UNITED STATES
! 3 )"W [,}
NUCLEAR REGULATORY COMMISSION fp E WASHINGTON, D. C. 20555 f
g v*f isbruary 26, 1981 Docket No. 50-213 LS05-81-02-004 Mr. W.G. Counsil, Senior Vice President Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
RE:
INSERVICE INSPECTION AND VALVE TESTING PROGRAM The Commission has issued the enclosed Amendment No. 37 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. The amendment consists of changes to the Technical Specifications in response to your application transmitted by letter dated June 29, 1977, as revised by letters dated May 26,1978, May 29,1978, July 14,1978, April 27,1979, June 29,1979, March 25,1980, and November 4,1980, and your application transmitted by letter dated November 4,1980.
The amendment revises the Technical Soecifications to replace the current inservice inspection and testing Technical Specifications with an inservice inspection and valve testing program which meets the requirements of 10 CFR 50.55a(g).
It also revises the testing requirements for certain valves in the emergency core cooling systems.
Pursuant to 10 CFR Section 50.55a(g)(6)(i), we hereby grant relief from certain inservice inspection and testing requirements as discussed in the enclosed Safety Evaluation. We have determined that these require-ments would be impractical and that the granting of this relief is authorized by law,~will not endanger life or property or the comon defense and security and is otherwise in the public interest considering the burden upon Connecticut Yankee Atomic Power Company if the require-ments were imposed. This relief is granted, except for certain requirements as discussed in the Safety Evaluation, in response to your request.
During our review of your application, we found it necessary to modify the-proposed Technical Specifications. We have discussed these modifi-cations with your representative and have mutually agreed upon them.
The pump testing program you submitted will be handled by a separate action-at a later date.
08 240 E77
2-February 26, 1981
- Mr.' W.G. Counsil Copies of the Safety Evaluation and Notice of Issuance are also enclosed.
Sincerely, h.
l Dennis M. Crutchfield, ief Operating Reactors Bran h #5 Division of Licensing
Enclosures:
1.
Amendment No. 37 to License No. DPR-61 2.
Safe,'v Evaluation Notic' of Issuance
' 3.
e
- cc w/ enclosures:
See next page a
c
^
9 Mr. W. G. Counsil 3-cc w/ enclosures:
Day, Serry & Howard U. S. Environmental Protection Counselors at Law Agency One Constitution Plaza Region 1 Office Hartford, Connecticut 06103 ATIN: EIS C0ORDINATOR JFK Federal Building Superintendent Boston, Massachusetts 02203 Haddam Neck Plant RFD #1 Resident Inspector Post Office Box 127E Haddam Neck Nuclear Power Station East Hampton, Connecticut 06424 c/o U. S. NRC East Haddam Post Office Mr. James R. Himmelwright East Haddam, Connecticut 06423 Northeast Utilities Service Carpany P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street
- Middletown, Connecticut 06457 Soard of Selectmen.
Town Hall Haddam,. Connecticut 06103 Connecticut Energy Agency ATTN: Assistant Director Research and "olicy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut' 06106 Director, Criteria and Standards Division Office of Radiation Prograns (ANR-460).
~
U. S. Environmental Protection Agency Washington, D. C.
20460 O
_L.
_.-.