05000368/LER-1981-013, Forwards LER 81-013/03L-0

From kanterella
(Redirected from ML19343C513)
Jump to navigation Jump to search
Forwards LER 81-013/03L-0
ML19343C513
Person / Time
Site: Arkansas Nuclear 
Issue date: 03/19/1981
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19343C514 List:
References
2R-0381-14, 2R-381-14, NUDOCS 8103240415
Download: ML19343C513 (1)


LER-1981-013, Forwards LER 81-013/03L-0
Event date:
Report date:
3681981013R00 - NRC Website

text

l ARKANSAS POWER'S LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (50113716 March 19, 1981 [m eEC[jpg[/s

/,g~319 p

2R-0381-14 11 9

, e.x Mr. K. V. Seyfrit, Director i

I?d's

/

Office of Inspection & Enforcement

'f,

U. S. Nuclear Regulatory Commission Region IV M,,, m i*

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 SUBJECT: Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 81-013/03L-0 (File: 2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.9.b, attached is the subject report concerning the failure of a sigma indicator during mode 1 operation.

Very truly yours, 5$ Yh David C. Trimble Manager, Licensing DCT:GAC:1p Attachment cc: Mr. Victor Stello, Jr., Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Nonnan M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.

20555

(

[

810324041!i s aeen woots sours iiriuries sysresi