ML19343B730
| ML19343B730 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/14/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19343B731 | List: |
| References | |
| NUDOCS 8012300165 | |
| Download: ML19343B730 (2) | |
See also: IR 05000289/1980028
Text
g
.
.
[
(4
UNITED STATES
NUCLEAR REGULATORY COMMisslON
., e .
c.
,
REGION I
e * . ,3
.
s
' g
631 PARM AVENUE
KING OF PRUS$1 A, PENNSYLVANI A 19406
,
0CT 14 liiG
Docket No. 50-289
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold
Senior Vice President
100 Interpace Parkway
Parsippany, New Jersey 07054
Gentlemen:
Subject:
Inspection 50-289/80-28
This refers to the routine inspection conducted by Mr. P. Koltay of this office
on September 23-25, 1980, at Three Mile Island Nuclear Station, Unit 1, Middletown,
Pennsylvania of activities authorized by NRC License No. DPR-50 and to the
discussions of our findings held by Mr. Koltay with Messrs. J. Colit: and R.
Barth of your staff at the conclusion of the inspection.
-
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public.
Document Room.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
^^
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
_ ,
-
._
_
.
Metropolitan Edison Company
2
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-289/80-28
cc w/ encl:
J. G. Herbein, Vice President-Nuclear Operations
R. J. Toole, Manager, Unit 1
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Colitz, Manager, Plant Engineering, Unit 1
L. W. Harding, Supervisor of Licensing
R. F. Wilson, Director - Technical Functions
E. G. Wallace, Licensing bbnager
I. R. Finfrock, Jr.
R. W. Conrad
J. B. Lieberran, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment
(Without Report)
G. F. Trowbridge, Esquire
.
1
.
--
e