ML19343B476
| ML19343B476 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 10/30/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| Shared Package | |
| ML19343B477 | List: |
| References | |
| NUDOCS 8012240048 | |
| Download: ML19343B476 (2) | |
See also: IR 05000334/1980024
Text
- f %
[1c -
'
,
o
UNITED STATES
[
NUCLEAR REGULATORY COMMISSION
.c
7, -
j
REGION I
o
M1 PARK AVENUE
%,
,e,c
KING OF PRUSSIA, PENNSYLVANIA 19406
+....
OCT 3 0 1980
Docket No. 50-334
Duquesne Light Company
ATTN:
Mr. C. N. Dunn
Vice President
Operations Division
435 Sixth Avenue
Pittsburgh, Pennsylvania 15219
Gentlemen:
Subject:
Inspection 80-24
This refers to the routine inspection conducted by Mr. William Troskoski of
this office on August 25 - 29, 1980 of activities authorized by NRC License
DPR-66 and to the discussions of our findings held by Mr. Troskoski with Mr.
J. Werling at the conclusion of the inspection.
Areas examined dsring this inspection are described in the Office of Inspection
and Enforceme.it Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
However, based on discussions of our findings between Mr. Troskoski and Mr. J.
Werling on August 29, 1980 and subsequent discussions between the Senior
Resident Inspector, Mr. Beckman, and Mr. J. Werling on October 17,1980, it is
our understanding that all Design Change Packages will be reviewed to ensure
that any necessary technical specification changes will be obtained prior to
returning any equipment or systems to service.
If our understanding is not
j
correct, phase advise this office within seven days.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
l
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
l
will be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
'
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
1
!
I
l
r0122400 W
g
1
_
,.
--
-
-
.
-.
.
-
--
.
.
._.
,-
.
.
Duquesne Light Company
2
OCT 3 3 1980
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
-_/
'
- _- .
Edn . Brunner, Chief
Reptor Operations and Nuclear
%pport Branch
Enclosures:
1.
Office of Inspection and Enforcement Inspection ~
Report Number 50-334/80-24
cc w/encls:
F. Bissert, Technical Assistant Nuclear
R. Washabaugh, QA Manager
J. Werling, Station Superintendent
G. Moore, General Superintendent, Power Stations Department
J. J. Carey, Director of Nuclear Operations
,
l
R. Martin, Nuclear Engineer
J. Sieber, Superintendent of Licensing and Compliance, BVPS
!
I
1
_.
- . - , - - - , - -
. - . - - , - . , -
. .
.
.
, . .
-
-
. , - - -
-