Revised Tech Specs 3.5.3 & 4.5.J Re Operability Requirements of Standby Svc Water Pump
ML19343A617
Person / Time
Site: Hatch 
Issue date: 11/03/1980
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19343A615 List:
References
NUDOCS 8011190151
Download: ML19343A617 (1)


Text

qV LIMITING CONDITIONS FOR OPEPATION SURVEILLANCE REQUIRE!iENTS 3.5.3 Plant Service Water System a.5.J Plant Service Water System 1.

Normal Availability 1.

The automatic pump start func-tions and automatic isolation The reactor shall not be functions shall be tested once made critical from the per operating cycle.

cold shutdown condition unless the Plant Service Water Systen (including 4 plant service water pumps and the standby service water pump) is operable.

2.

Inoperable Components 2.

Inoperable Components a.

The standby service water a.

When the standby service pump may be inoperable for water pumn is rwie or found a period not to exceed 60 to be ino,nerable, the four days provided that an alter-remaining PSW pumps, both nate Unit 1 plant service PSU divisions, and all three water cooling source to the diesel generators, shall be 18 diesel generator is demonstrated to be operable OPERABLE.

immedia tely.

b.

One PSW pump may bc in-b.

When one PSW pump is made operable for a period not or found to be inoperable, to exceed 30 days provided the standby service water all diesel generators are pump, the three remaining operable.

PSW purps, both PSW divisions nd all three diesel genera-tors, shall be demonstrated to be operable immediately and weekly thereafter.

c.

One PSW pump and the stand-c.

When one PSW pump and the by service water pump may standby service water pump be inoperable for a period are made or found to be not to exceed 30 days pro-inoperable, the three re-vided all diesel generators maining PSW pumps, both PSW are operable.

divisions, and all three diesel generators, shall be demonstrated to be operable imediately and weekly there-after.

d.

Two PSW pumps or one PSW d.

When two PSW pumps or one division may be inoperable for PSW division are made or a period not to exceed 7 found to be inoperable, the days provided the diesel standby service water pump generators associated with the and all active components operable PSW components are of the operable division or operable.

divisions and the diesel generators associated with the operab7 PSW comoonents, shall be demonstrated to be operable imediately and daily thereafter.

Amendment No. 56 3.5-12 8011190 %