Text
i
" " %o,
UNITED STATES
f
l'
3,
3
NUCLEAR REGULATORY COMMISSION
.E
REGION 111
y,
"
,
g'f
799 ROOSEVELT ROAD
o,
CLEN ELLYN. ILLINOIS 60137
'
- ..*
AUG
7 080I
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the inspection conducted by Messrs. H. M. Wescott and
E. J. Gallagher of this office on July 9 and 10, 1980, of activities at
the Clinton Power Station, Unit 1, authorized by NRC Construction Permit
No. CPPR-137 and to the discussion of our findings with Messrs. L. J. Koch,
J. D. Geier, J. F. Hampton, and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
,
vations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
80091800'/3'
.
9
L.
A
Illinois Power Company
-2-
gg
7 gg30;
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
.
W!!?s'
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-461/80-13
cc w/ enc 1:
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
Mr. Gary N. Wright, Chief
Division of Nuclear Safety