Forwards IE Insp Repts 50-373/80-32 & 50-374/80-20 on 800806-08 & Notice of Violation
ML19343A481
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/27/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19343A482 List:
References
NUDOCS 8009180040
Download: ML19343A481 (2)


See also: IR 05000373/1980032

Text

.-

.

auc,

![c

u

,%,

UNITED STATES

j

NUCLEAR REGULATORY COMMISSION

.et

REGION ill

7 /, [c

.

'

799 ROOSEVELT Ro AD

o,

GLEN ELLYN. ILLINOls 60137

% .b'../

AUG 2 7 680l

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicage, IL 60690

Gentlemen:

This refers to the routine inspectica conducted by Mr. I. T. Yin of this

office on August 6-8, 1980, of activities at La Salle County Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-99 and

No. CPPR-100 and to the discussion of our findings with Mr. L. J. Burke

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office

within thirty days of your receipt of this notica a written statement

or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective

action to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

The findings of our inspection were discussed with Mr. Shewski and others

of your staff on August 13, 1980. The concerns presented vere acknowledged

by your staff and led to your decision to temporarily suspend small bore

pipe hanger and restraint design and installation activities. This action

was documented in our August 14, 1980, letter to you.

We will continue to

pursue this matter during future inspections to confirm the effectiveness

of your corrective actions.

'

8000180 G yo

. _ . _ -

_

.

-

- -

-.

_

- ._.

f

.

.

i

i

f

Commonwealth Edison Company

-2-

QUJG z 7 $601

I

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulatior.s, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

i

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

!

such information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

James G. Keppler

Director

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-373/80-32

and No. 50-374/80-20

cc w/ encl:

i

i

Mr. J. S. Abel, Director

of Nuclear Licensing

J

Mr. L. J. Burke, Site

Project Superintendent

<

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

i

AEOD

!

Resident Inspector, RIII

l'

PDR

Local PDR

NSIC

TIC

,

Mr. Dean Hansell, Office of

'

Assistant Attorney General

J

$-

RIII

RIII

RII y RIII

RII4-

RIII

,

Noh gs

DaIielon

Fiorelli

er

Sp sard

Ke, ler

Yin /np )

8/23/80

fgt gi,

g

Tuv

'g,

'

- .

.

.

.

.

.

-

---

-.

-