ML19343A445
| ML19343A445 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point, Palisades File:Consumers Energy icon.png |
| Issue date: | 08/22/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8009170415 | |
| Download: ML19343A445 (1) | |
Text
Y(
P Id 4,'o t
4 p
8 UNITED STATES
S
[
- 3,,,
g NUCLEAR REGULATORY COMMISSION
'- c REGION lil o,
f 799 ROOSEVER T ROAD 1.
o GLEN ELLYN. ILLINOIS 60137 b
'AUG 2 2 $804 Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN:
Mr. R. B. DeWitt Vice President Nuclear Operations -
212 West Michigan Avenue Jackson, MI 49201 Gentlemen:
The enclosed IE Circular No. 80-18, provides informatio. on the details of a safety evaluation that is necessary to adequately surport changes to radwaste systems. No written response is required.
Should you have any questions related to the enclosed information, please contact this office.
Sincerely, e_-
e James G. Keppler Directar
Enclosure:
IE Circular No. 80-18 cc w/ encl:
Mr. D. P. Hoffman, Nuclear Licensing Administrator Mr. C. J. Hartman, Plant Superintendent Mr. R. W. Montross, Manager Resident Inspectors, RIII Central Files Director, NRR/DPM Director, NRR/ DOR AEOD PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago 8009370
SSINS No.: 6830 Accession No.:
8006190038 IEC 80-18 y
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 August 22, 1980 IE Circular No. 80-18: 13 CFR 50.59 SAFETY EVALUATIONS FOR CHANGES TO 1
l RADI0 ACTIVE WASTE TREATMENT SYSTEMS Discription of Circumstances:
Recent inspection efforts at operating power reactors have revealed numerous instances in which licensees have failed to perform adequate safety evaluations to support changes made to the design and/or operation of facility radioactive waste treatment systems.
These safety evaluations are required by the regula-tions of 10 CFR 50.59 whenever changes are made in the facility as describad in the Safety Analysis Report (SAR).
The inadequacies of the evaluations have caused radiological safety hazards to occur unidentified and therefore to remain unevaluated and uncorrected.
In two particular cases, the inadequately evaluated system changes resulted in system failures that caused an uncontrolled release of radioactivity to the i
environment.
In each of these situations, a proper 10 CFR 50.59 safety evalua-I tion should have identified and corrected deficiencies in the system modifica-1 tion and/or operation and would have prevented the inadvertent release of radioactivity.
NRC followup examination of the situation indicates that the inconsistency and/or inadequacy of licensee safety evaluations may be widespread.
A wide range of opinions seems to exist among licensees as to what constitutes an appropriate 10 CFR 50.59 safety evaluation, particularly for radwaste systems.
Therefore, the following discussijn and/or guidance is provided for licensee use in preparing future 10 CFR 50.59 safety evaluations to support changes in the design and/or operation of the radioactive waste treatment systems of licensed facilities.
Although the contents of this guidance are specifically directed to the radioactive waste systems, the general principles and philosophy of the 10 CFR 50.59 safety evaluation guidance are also applicable to the facility design and operation as a whole; thus, the application of 10 CFR 50.59 should reflect a consistent approach.
Discussion:
The requirements of 10 CFR 50.59 are composed of three essential parts.
First, paragraph (a)(1) is permissive in that it allows the licensee to make changes _to *he facility and its operation as described in the. Safety Analysis Report wit
.t prior approval, provided that a change in Technical Specifica-tions is nov volved or an "unreviewed safety question" does not exist.
Criteria for catermining whether an "unreviewed safety question" exists are defined in paragraph (a)(2).
Second, paragraph (b) requires that records of changes made under the authority of paragraph (a)(1) be maintained.
These records are required to include a written safety evaluation that provides the 4
j
(
IEC 80-18 August 22, 1980 Page 2 of 3 a
basis for determining whether an "unreviewed safety question" exists.
7 Paragraph (b) also requires a report (at least annually) of such changes to the NRC.
Third, paragraph (c) requires that proposed changes in Technical Specifications be submitted to the NRC as an application for license amendment.
Likewise, proposed changes to the facility or procedures and the proposed conduct of tests that involve an "unreviewed safety question" are required to be submitted to the NRC as an application for license ameadment.
Any proposed change to a system or procedures described in the SAR, either by text or drawings, should be reviewed by the licensee to determine whether it it ilves an "unreviewed safety question." Maintenance activities that do not result in a change to a system (permanent or temporary), or that replace j
components with replacement parts procured with the same (or equivalent)
I purchase specification, do not require a written safety evaluation to meet 10 CFR 50.59 requirements.
However, a safety evaluation is required to meet the provisions of 10 CFR 50.59 and any change must be reported to the NRC as required by 10 CFR 50.59(b) if the following circumstances occur: (1) com-ponents described in the SAR are removed; (2) component functions are altered; (3) substitute components are utilized; or (4) changes remain following comple-tio' of a maintenance activity.
Not,ce to Licensees:
For all casr s requiring a written safety evaluation, the safety evaluation must set forth the bases and criteria used to determine that the proposed change does or does not involve an "unreviewed safety question." A simple statement of conclusion in itself is not sufficient.
However, depending upon the significance of the change, the safety evaluation may be brief.
The scope of the evaluation must be commensurate with the potential safety significance of the proposed change or test.
The depth of the evaluation must be sufficient to determine whether or not an "unreviewed safety question" is involved.
These evaluations and analyses should be reviewed and approved by an appro-priate level of management before the proposed change is made.
An important part of the "unreviewed safety question" determination is the evaluation and analysis of the proposed change by the licensee to assure that (1) potential safety hazards are identified, and (2) corrective actions are taken to eliminate, mitigate, or control the hazards to an acceptable level.
All realistic failure modes and/or malfunctions must be considered and protec-tion provided corvnensurate with the potential consequences.
All applicable regulatory requirements, including Technical Specifications, must be complied with so that the proposed change shall not represent an "unreview.:J safety question." Also, the margin of safety as defined in the bases of the Technical Specifications shall not be reduced by the proposed change.
For radioaciive waste systems, the appropriate portions of 10 CFR 20, 30, 50, 71, and 100, the facility Technical Specifications, and 40 CFR 190 (Environ-mental Dose Standard) are applicable.
Adottional specific criteria that should be reviewed prior to the modification of radioactive waste systems are presented below:
(1) System inodifications should be evaluated against the seismic, quality group and quality assurance criteria in Regulatory Guide 1.143.
Design
IEC 80-18 August 22, 1980 Page 3 of 3 g'
provisions for controlling releases of radioactive liquids, as presented in Regulatory Guide 1.143, should also be evaluated.
(2) Radiological controls should be evaluated against the criteria in Regulatory Guide 1.21 and Standard Review Plan Section 11.5, " Process and Effluent. Radiological Monitoring and Sampling Systems."
(3) Systems involving potentially explosive mixtures should be evaluated against the criteria in Standard Review Plan Secti n 11.3, " Gaseous Waste Management System," subsection II, item 6.
(4) System design and operation should be evaluated to assure that the radiological consequences of unexpected and unccntrolled releases of radioactivity that is stored or transferred in a waste system are a small fraction of the 10 CFR 100 guidelines; i.e., less than 0.5 rem whole body dose, 1.5 rem thyroid from gaseous releases, and less than the radionuclide concentrations of 10 CFR 20, Appendix B, Table II, Column 2 from liquid releases at the nearest water supplies.
(See Stardard Review Plan Sections 15.7.1, 15.7.2, and 15.7.3 for more details.)
The evaluation must include an analysis encompassing'the above criteria to the extent that the criteria are applicable to the proposed changes; i.e., if the modifications involve a change addressed by the above regulations and criteria, then the modifications must be evaluated in terms of these regulations and criteria.
1 In conclusion, for any change in a facility radioactive waste system as described in the SAR, a safety evaluation is required in accordance with 10 CFR 50.59.
In this safety evaluation and the "unreviewed safety question" determination, the evaluation criteria in Items 1-4 above should be used.
If the proposed modification (design, operation, or test) represents a departure from this evaluation criteria, one of the following actions
- should be taken:
(1) The proposal should be modified to meet the intent of the criteria; (2) The evaluation / determination must present sufficient analyses to demonstrate the acceptability of the departure; or, (3) Commission approval must be received prior to implementing the modification (i.e., an unreviewed safety issue may be involved).
No written response to this circular is required.
If additional information regarding this subject is required, contact the Director of this office.
IEC 80-18 August 22, 1980 RECENTLY ISSUED g
IE CIRCULARS Circular Date of No.
Subject Issue Issued to 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR
. ret from Baffle Plate Corner OLs and PWR CFs 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510DU Trip facilities with an Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contaminatioc of 6/24/80 All holders of power l
Plant Demineralized Water and research r0 actor System and Resultant Internal licenses (operating Contamination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor 4
Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP 80-10 Failure to Maintain 4/29/80 All holders of reactor Environmental Qualification OLs and cps i
of Equipment 80-09 Problems With Plant Internal 4/28/80 All holders of a power Communications Systems reactor OL or CP i
80-08 BWR Tecl.nical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWRs holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil System reactor OL or CP i
-