Text
$
4
[
%
UNITED STATES
.. - y
NUCLEAR REGULATORY COMMISSION
g
,j
REGION i
et
'g
431 PARK AVENUE
KING OF PRUS$1 A, PENNSYt.VANI A 19406
Docket No. 50-333
DEC 221980
Power Authority of the State of New York
-
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. R. J. Pasternak
Resident Manager
P. O. Box 41
Lycoming, New York 13093
Gentlemen:
Subject:
Inspection Report Number 50-333/80-03
This refers to the routine inspection conducted by fir. R. Nimitz of this office
on March 11-14, 1980 of activities authorized by NRC License No. DPR-59 and to
the discussions of our findings held by Mr. Nimitz with Mr. J. Leonard and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompliance and deviations brought to your attention in letters dated October
30, 1978 and January 31, 1979. We have no further questions regarding the steps
you took to correct item B of the October 30, 1978 letter and item A of the
January 31, 1979 letter. With regard to items B.1 and D of Appendix A to our
January. 31, 1979 letter, based on our letter dated fiay 21, 1979, your procedures
were to be revised to clearly define criteria for use or non-use of the half-
mask respirators. This revision remains to be completed.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
.has been categorized into the levels as described in our correspondence to you
dated December 31, 1974. This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
i
explanation in reply including:
(1) corrective steps which have been taken by
'
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
- 1%oso 755
.
.
'
i
Power Authority of the State of New York
2
DEC 2 2150
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
.
Ge rg
H.
mith, Chief
F -1 Facility and Materials Safety
ranch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-333/80-03
cc w/encls:
George T. Berry, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Site Quality Assurance Engineer
J. F. Davis, Chairman,' Safety Review Committee
C. M. Pratt, Assistant General Counsel
G. M. Wilverding, Manager-Nuclear Licensing