Forwards IE Insp Rept 50-333/80-03 on 800311-14 & Notice of Violation
ML19341D526
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/22/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19341D521 List:
References
NUDOCS 8103050755
Download: ML19341D526 (2)


See also: IR 05000333/1980003

Text

$

4

[

%

UNITED STATES

.. - y

NUCLEAR REGULATORY COMMISSION

g

,j

REGION i

et

'g

431 PARK AVENUE

KING OF PRUS$1 A, PENNSYt.VANI A 19406

Docket No. 50-333

DEC 221980

Power Authority of the State of New York

-

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. R. J. Pasternak

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject:

Inspection Report Number 50-333/80-03

This refers to the routine inspection conducted by fir. R. Nimitz of this office

on March 11-14, 1980 of activities authorized by NRC License No. DPR-59 and to

the discussions of our findings held by Mr. Nimitz with Mr. J. Leonard and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the items of

noncompliance and deviations brought to your attention in letters dated October

30, 1978 and January 31, 1979. We have no further questions regarding the steps

you took to correct item B of the October 30, 1978 letter and item A of the

January 31, 1979 letter. With regard to items B.1 and D of Appendix A to our

January. 31, 1979 letter, based on our letter dated fiay 21, 1979, your procedures

were to be revised to clearly define criteria for use or non-use of the half-

mask respirators. This revision remains to be completed.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

.has been categorized into the levels as described in our correspondence to you

dated December 31, 1974. This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

i

explanation in reply including:

(1) corrective steps which have been taken by

'

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

  • 1%oso 755

.

.

'

i

Power Authority of the State of New York

2

DEC 2 2150

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

.

Ge rg

H.

mith, Chief

F -1 Facility and Materials Safety

ranch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-333/80-03

cc w/encls:

George T. Berry, President and Chief Operating Officer

J. P. Bayne, Senior Vice President-Nuclear Generation

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Site Quality Assurance Engineer

J. F. Davis, Chairman,' Safety Review Committee

C. M. Pratt, Assistant General Counsel

G. M. Wilverding, Manager-Nuclear Licensing