Forwards IE Insp Rept 50-320/80-20 on 801209-11.No Noncompliance Noted
ML19341D327
Person / Time
Site: Crane 
Issue date: 01/09/1981
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hovey G
METROPOLITAN EDISON CO.
Shared Package
ML19341D328 List:
References
NUDOCS 8103050372
Download: ML19341D327 (2)


See also: IR 05000320/1980020

Text

o

UNITED STATES

["

'

NUCLEAR REGULATORY COMMISSION

3

j

REGION I

O,

631 PARK AVENUE

%

,o',s

KING OF PRUSSIA, PENNSYLVANIA 19406

January 9,1981

Docket No. 50-320

s

4

Metropolitan Edison Company

,

/Tg'

ATTN: Mr. G. K. Hovey

Vice President and Director of TMI-2

%%~

ISSlme '

P.O. Box 480

,

Middletown, Pennsylvania 17057

g,

[/

Gentlemen:

p

i

'

Subject:

Inspection 50-320/80-20

This refers to the special inspection conducted by Mr. D. Donaldson of this

office on December 9-11, 1980, at Unit 2 of the Three Mile Island Nuclear

Generating Station, of activities authorized by NRC License No. OPR-73 and to

the discussions of our findings held by Mr. Donaldson with Messrs. Herbein and

Barton at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any

such application must be accompanied by an affidavit executed by the owner of

the information, which identifies the document or part sought to be withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790.

The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Room.

El0805ODY

Q.

.

.

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

'

,

ge

mit , Chief

,

Fu 1 F cility and Materials

fe y Branch

Enclosure: Office of Inspection and Enforceme t Inspection Report Number

50-320/80-20

cc w/ enc 1:

J. J. Barton, Manager Site Operations, THI-2

E. D. Fuller, TMI-2 Licensing Supervisor

E. G. Wallace, PWR Licensing Manager

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without

Report)