Forwards IE Insp Rept 50-213/80-21 on 801006-1107.No Noncompliance Noted
ML19341D272
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/09/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19341D273 List:
References
NUDOCS 8103050261
Download: ML19341D272 (2)


See also: IR 05000213/1980021

Text

fy

'

  1. U%

o

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

3-

l

REGION 1

%

7

631 PARK AVENUE

%,,

g

KING OF PRUSSIA, PENNSYLVANIA 19406

'

.....

JAN

9 1981

g

'

Docket No. 50-213

f

Connecticut Yankee Atomic Power Company

I

Lh

ATTN: Mr. W. G. Counsil

f

I

'

4

Vice President - Nuclear

FED y 88N )

-

Engineering and Operations

pN " %%"""" . //

-

P.O. Box 270

Hartford, Connecticut 06101

'n

.

N<

.y

Gentlemen:

' 48 .M '

Subject:

Inspection Report Number 50-213/80-21

This refers to the routine inspection conducted by Mr. T. Smith of this

office on October 6 - November 7, 1980, at the Haddam Neck Plant, Haddam,

Connecticut of activities authorized by NRC License No. DPR-61 and to

the discussions of our findings held by Mr. Smith with Mr. R. Graves at

the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection f(eport which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by

the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Secticn 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any infomation that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must be accompanied by an affidavit executed by the owner

of the infomation, which identifies the document or part sought to be with-

held, and which contains a statement of reasons which addresses with specificity

the items which will be considered by the Comission as listed in subparagraph

(b) (4) of Section 2.790. The infomation sought to be withheld shall be in-

corporated as far as possible into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

i

8103050 M

--

_-.

_

. _ - -

.

.

Connecticut Yankee Atomic

2

JAN

9 1981

Power Company

.

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

_

nm

- -

d

r- runner, Chief

Re tor Operations and Nuclear

pport Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-213/80-21