ML19341C878
| ML19341C878 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 10/07/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19341C862 | List: |
| References | |
| NUDOCS 8103040350 | |
| Download: ML19341C878 (2) | |
See also: IR 05000460/1980011
Text
r
~
- ]
h72 bid...
_,
,
J
'
.,
- -
[pm%,,
,
-
UNITED STATES
-[
y
g
NUCLEAR REGULATORY COMMISSION
E
REGION V
O
1990 N. CALIFORNI A BOULEVARD
,&
SUITE 202. WALNUT CREEK PLAZA
- ee,*
WALNUT CREE K, CALIFORNIA 94596
GCT
- D80
Docket flo.
0
-50-51
N'
?(a{,%j. 4'gg
8
c'E
'r
Washington Public Power Supply System
g h
V,
P
,
P. O. Box 968
O
4
(i
~
C}C
Richland, Washington 99352
-
% .
'
Attention: Mr. R. L. Ferguson
,
'
!!anaging Director
4
Gentlemen:
Subject: llRC Inspection of WNP 1 and 4
This refers to the inspection conducted by Messrs. D. F. Kirsch, A. D. Toth
and G. Hernandez of this office on Augu:t 26-29 and September 9-12, 1980 of
activities authorized by URC Construction Permit flos. CPPR-134 and CPPR-174,
and to the discussion of our findings held by Mr. Kirsch with Mr. J. P. Thomas
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with flRC requirements, as set forth in
the flotice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance have been categorized into a level as described in our correspondence
to all fiRC licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201, of
the ilRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within thirty (30) days
of your receipt of this notice, a written statement or explanation in reply
including (1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further violations;
and (3) the date wnen full compliance will be achieved.
1
l
1
18at eso4 0356
<
.
. _ _ - _
,
..
,'
.
,
Mr. R. L. Ferguson
-2-
&T
7 i330
In accordance with Section 2.790 of the flRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the flRC's Public Document Room.
If this
report contains any information that vou believe to be proprietary, it is
f
necessary that you submit 2 written aplication to this office, within 30 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
O
_.
_
~ , _- . 3-
-
O
g G. S. Spen'cer, Chief
M
Reactor Construction and Engineering
,.
Support Branch
Enclosures:
A.
flotice of Violation
B.
IE Inspection Report
Nos. 50-460/80-11
50-513/80-11
cc w/o enclosure B:
M. E. Witherspoon, Division Manager
Quality Assurance, WPPSS
J. P. Thomas, Project Manacar, WPPSS
.
- ~.
.