Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-460/80-11 & 50-513/80-11.Addl Info Required Re Undersized Pipe Spool Lugs & Nondestructive Exam
ML19341C869
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/05/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19341C862 List:
References
NUDOCS 8103040332
Download: ML19341C869 (2)


See also: IR 05000460/1980011

Text

-

-

. _ .

_

_

. .

pa n co,

.,4lB e

,g

UNITED STATES

.

g

NUCLEAR REGULATORY COMMISSION

y

. ,

,

c. y

nEGION V

ei

1910 N. CALIFORNIA DOULEVARD

-

'w/

,e

  • UITE 202, WALNUT CREEK PLAZA

.

  • e..e

WALNUT CREEK, CALIFORNI A 94596

January 5, D81

Docket flos. 50 460

50-513

.

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. D. W. Mazur

'illP 1/4 Program Director

l

.

i

References:

(1) WPPSS letter from D. W. Mazur to G. S. Spencer

dated flovemoer 6,1980, G0-1-80-347

4

(2) f!RC letter from G. S. Spencer to R. L. Ferguson

<

dated Cctooer 7, 1980, Forwarding Inspection Report

!!o. 30-11

.

Gentlemen:

Thank you for your lettar, rieference (1), res$onding to the two items of

noncompliance provided to you 'oy Reference (2 . Your written response has been

'

reviewed and was found to lack sufficient information to permit our assessment

.

of your corrective actions. Rafarence to an undetermined disposition of a

'

nonconformance report is not sufficient information as required by 10 CFR 2.201.

Accordingly, pursuant to Section 2.201 of the fiRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, you are required to submit to

this effice, within twenty-five (25) days of the date of this letter, a written

statement or explanation addressing the following questions regarding the items

of noncompliance:

Findina A

1.

Your letter states that six of eight lugs were found to be

undersized on pipe spool flo. DHR-412030-2. Did these include the

,

two lugs with undersized fillet welds identified in the flotice of

4

Violation? What specific actions were or will be taken to correct

these nonconforming conditions? When will this action be completed?

2.

What specific actions have or will be taken to avoid further

violations? When will this action be completed?

""O10 30 4 OMW

-

-

.

.

-

_

-_

_

_

._.

.

.

,

-

.

,

,

,

,

4 $

Washington Public Power

-2-

January 5,1981

Supply System

Findina B

1.

When will the specific corrective action of nondestructive

examination of the affected areas on pipe spool No. DHR-412030-2 be

completed? If completed, what results were achieved?

2.

When will the actions taken to preclude recurrence be c.ompleted?

Please contact us if you have any questions reg *arding this matter. Your

cooperation with us is appreciated.

i

Sincerely,

A bl.)+e

G. S. Spencer, Chief