_.
_ ___
_
_ _ _ _ _ _ _ _
77c-
pa a<cg[o
UNITED STATES
8(
g.
NUCLEAR REGULATORY COMMISSION
n-
$(
c[5
REGION V-
1990 N. CALIFORNIA BOULEVARD
\\
,,,o
j'
SUITE 202, WALNUT CREEK PLAZA -
WALNUT CREE K. CALIFORNIA 94596
January 13, 1981
Docket Nos. 50-508
4'
'e
50-509
'
F
-
Or, % 8
-
/2
I
Washington Public Power Supply System
W
P. O. Box 1223
4-
Elma, Washington 98541
%
JJ
,
^
Attention: Mr. D. E. Dobson
% j"
,
'
Acting Program Director
.
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Projects
Nos. 3 and 5 (WNP-3/5)
This refers to the inspection conducted by Mr. T. W. Bishop of this
office from October 31, 1980 to December 4,1980 of activities authorized
by NRC Construction Permits Nos. CPPR-154 and -155, and to the discussion
of our findings held by Mr. Bishop with Mr. J. C. Lockhart of your staff
at the conclusion of the inspection.
[
Areas examined during this inspection are described in the enclosed
insoection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
.Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you believe to be
,
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
'
such information be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
'
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
l
the Public Document Room.
l
l
810304 0 M3
.- A
-
--
-
.-
._
-.
.
l
.
.
.
Washington Public Power Supply Syste.a -2-
January 13, 1981
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
l...,p .b c # -
G. S. Soencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
ilos. 50-503/80-16
50-509/80-16
cc w/ enclosure:
M. E. Witherspoon,
Quality Assurance Director
..