ML19341C304

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-266/80-23 & 50-301/80-23 on 801217-18.No Noncompliance Noted
ML19341C304
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/07/1981
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burnstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19341C305 List:
References
NUDOCS 8103020690
Download: ML19341C304 (2)


See also: IR 05000266/1980023

Text

5

'o,

UNITED STATES

//s'

8

NUCLEAR REGULATORY COMMISSION

,

o

REGION lli

g.

-l

799 ROOSEVELT ROAD

e

o-

[g

GLEN ELLYN,lLLINOls 60137

,

.....

rJAN

7 nm

u>

Docket No. 50-266

Docket No. 50-301

O

D

1

2

- kBy 279g7f

Wisconsin Electric Power Company

ATTN: Mr. Sol Burstein

' 8-

difgg,

, /

Executive Vice President

\\

Power Plants

js

231 West Michigan

9

S/

Milwaukee, WI 53201

=

6

Gentlemen:

This refers to the routine inspection conducted by Mr. N. D. Ward of

this office on December 17-18, 1980, of activities at the Point Beach

Nuclear Plant, Units 1 and 2,-authorized by NRC Operating Licer.se No.

DPR-24 and No. DPR-27 and to the discussions of our findings with

Mr. G. Reed and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified du .ng

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure. The application must

include'a ful' statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

.

.

8103020(A d

_. - - _ _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ - _ _

-

_ _ _ - _ - _ - -

- - _ _ _ __-_ - __________ _ ._

.

.

7

Wisconsin Electric Power

-2-

,

Company.

-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

s

.Fiorel[

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

.

Report No. 50-266/80-23

and No. 50-301/80-23

cc w/ encl:

G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

s.

.

G

.c+

,