Text
'Cmr f[^
5it UNITED STATES
[
,og NUCLEAR REGULATORY COMMISSION y
p v.
W ASHINGTON, D. C,2C555 R
g
/ 4{ h Y.
,g%
+:
i k...+.
N 4%
- t January 7, 1981 o
/.d M D '3
.h Docket No. 50-155 i
LS05-81-01-035 J
r; r
~
$~l e t
1
'M Q,
yqy y
Q('n; @_ f '-
Mr. David P. Hoffman f-Nuclear Licensing Administrator Q9' Consumers Power Company
'212 West Michigan Avenue Jackson, Michigan 49201
Dear Mr. Hoffman:
On. July 2,1980 we.sent a letter to all boiling water reactor licensees requesting that a license amendment application be submitted to incor-porate new technical specifications to provide reasonable assurance that facility operating will be maintained within the limits determined accept-able following tha implementation of the TMI ' Lessons Learned Category
" A i tems. The requested technical specificati ns for your facility are discussed in Enclosure 1.
Your response dated September 25, 1980 did not include proposed technical These
. specifications covering three of the items requested in our letter.
items are (1) revision of minimum shift manning reflecting the augmentation of a Shift Technical. Advisor (STA), (2) Systems Integrity Measuremer cs
. Program, and (3) Improved Iodine Measurements capability.
Your letter stated that Consumers Power Company has not addressed the STA technical specification because your position with regard to a long term program for the STA has not been finalized.
It is our position that a Technical Specification change as requested by our letter of July 2,1980 should be submitted promptly. Any future proposed modifications to the Big Rock-Point STA program, when approved, can be reflected in a further change to the Technical Specification. This subject it discussed in Item I. A.l.1 of NUREG-0737, "Clari fication of TMI Ac+. ion Plan Requirements".
Accordingly, you should fomard a proposed Technical Specification change related to the STA within 30 days of the receipt of this letter.
It is also o position that you shculd propose a Technical Specification This change that related to a System Integrity Measurements Program.
. specification can be included.in the " Administrative Controls" section of the Big Rock Point Technical Specifications. Accordingly, we request that you submit an ' appropriate technical specification change within 30 days of the. receipt of this lettar.
810so200W f
2-January 7,1981 With regard to the technical specification relating to Iodine Monitoring, your letter indicated that you are encountering difficulties in obtaining portable spectral analyzers.
Please inform us within 30 days the date that you expect to forward the requested technical specification change.
Sincerely, Ls 7>f. MJL1/
Dinnis'A. Crutchfield, Chi [
Operating Reactors Branch #5 Division of Licensing Enclosure :
As stated cc w/ enclosure:
See next page e
l 1
l 4
o 9
e e-*
-e,-%9
-ww g w s.
W em-g o,--w-
-r>,-a ee,
'rw-
+=ve-
-,vy
+,-
Mr. David P. Hoffman January 7, 1981 CC Mr. Paul A. Perry, Secretary U. S. Environmental Protection Consumers Power Cogany Agency 212 West Michigan Avenue Federal Activities Branch Jackson, Michigan 49201 Region V Office ATTN: EIS C0ORDINATOR Judd L. Bacon, Esquire 230 South
Dearborn Stri:
et Consumers Power Conany Chicago, Illinois 60604 212 West Michigan Avenue Jack son, - Michigan 49201 Herbert Grossman, Esq., Chairman Atomic Safety and Licensing Board Joseph Gallo, Esquire U. S. Nuclear Regulatory Comission Isham, Lincoln & Beale Washington, D. C.
20555 1120 Connecticut Avenue Room 325-Dr. Oscar H. Paris Washington, D. C.
20036 Atomic Safety and Licensing Board U. S. Nuclear Regulatory Lomission Peter W. Steketee, Esquire Washington, D. C.
20555 505 Peoples Building Grand Rapids, Michigan 49503 Mr. Frederick J. Shon Atomic Safety and Licensing Board Alan S. Rosenthal, Esq., Chairman U. S. Nuclear Regulatory Comission Atomic Safety & Licensing Appeal Boarc Washington, D. C.
20555 U. 5. Nuclear Regulatory Comission Washington, D. C.
20555 Big Rock Point Nuclear Power Plant ATTN: Mr. C. J. Hartman Mr. John O'Neill,11 Plant Superintendent Route 2, Box'44 Charlevoix, Michigan 49720 Maple City, Michigan 49664 Christa-Maria
~ Charlevoix Public Library Route 2, Box 108C 107 Clinton Street Charlevoix, Michigan 49720 Charlevoix, Michigan William J. Scanlon, Esquire Chairman 2034 Pauline Beulevard Cour.ty Board of Supervisors Ann Arbor, Michigan sib 3 Charlevoix County Charlevoix, Michigan 49720 Resident Inspector Big Rock Point Plant Office of the Governor (2) c/o U.S. NRC Room 1 - Capitol Building RP,f3, Box 600 Lansing, Michigan 48913 Charlevoix, Michigan 49/20 Director, Criteria and Standards Mr. Jim E. Mills Division Route 2, Bce.108C '
Office of Radiation Programs Charlevoix, Michigan 49720 (ANR-460).
. U. S. Environmental-Protection Thomas S. Moore Agency Atanic Safety & Licensing Appeal Board Washington, D. C.
20460 U. S. Nuclear Regulatory Comission Washington, D. C.
20555 9-
e Mr. David P. Hoffman 4-January 7,1981 1
.u CC Dr. John H. Buck Atomic Safety and Licensing Appeal Board U._ S. Nuclear Regulatory. Commission Washington, D. C.
20555'
~ Ms. JoAnn Bier 204 Clit. ton Street Charlevoix, Michigan 49720 b
[
h e
f 4
I
+.--<-+. -.u...
CORSum8fS F
0 Power g
Company
. w p....w 6N[d o.a.,., ome..; m w.. u.c~a.
4,..no.. ;.
u.cmo.n.oaoi. u.. coa. ei7 7es.o e so
.Se re=ber 25, 1980 Director, Nuclear Reactor Regulation Att M-De=is M Crutchfield, Chief Cperati=g Reacters Branch No 5 US Nuclea-Regulatory C H ssion Washinrten, DC 20555 DCC'GT 50-155 - LICInSE DFR 3:G ROCK POI 5T PLANT - TICENICAL S?ECIFI-CA"~C55 CE?liGE REQi. TEST IN RIS?ONSE TO NRC LE"'TER DATED JULY 2,1980 - CATEGORY "A" I~E'S FECM CC-2 LESSONS LEAP 27ED Attached are three (3) criginal and thirty-seven (37) copies of a reque e to change the 316 Ecek Point Technical Specifications.
"he enciesed Technical Jpeciff cations change is in direct respctse to NRC letter dated July 2,1980, which requested Cons =ers Power Cc=pany to sut=it a license e=endnent application to incorporate specifications addressing actions taken in response to Category "A" ite=s frc= SC-2 Lessens Learned. Specifically, the fclieving topics are addressed:
(1) Energency Pcver Supply /!nadequate Core Cccling, (2) Valve Pes'+'~
-dication, and (3) Centai=ent Isolation. Topie
( '. ) Shi't Technical Advisor (STA) is not audressed in th's change request be-cauce Cens=ers ?cver Cc=pany's position with respect to a long-ter= progra= for the STA (ref URC let' '
dated Septe=ber 5,1980; ite: I.A.l.1) has not been fi-naliced. Currently, STA's are provided in accordance with the pre pa= cutlined in cur sub=it:al dated March 1L, 1980. Cons =ers Fever Cc=pany vill request appropriate Technical Specifications changes upon for=alizatics of its long-te = progren.
Inclosure 2 of the HRC letter dated July 2,1980 requested license a=end=ents fcr Syste=s Integrity and Icdine Monitering. Censu=ers ?c er Cc=pany has pre-vicusly addressed b<>th tcpics in its sub=ittal dated March 1L, 1980. With re-spect o Syste=s I'.terity, the core spray recirculat:.:n syste= pc-tions cut-side of :entai=er.t are currer.iy required to be test.d each refueling cutage since testing cannot be perfo m ed during pov r operr. tion. Therefore, a li=iting
~~~ 'on for operation (LCO) reflecting test require =ents is nct censidered applicable and no changes to the cur en: Technical Specifications are proposed.
Cens=ers ?cver Cc=pany has encountered difficulties in cbtaining pertable spec-tra' analyzers; 'therefore, Technical Specifications changes vill not be requested frr !cdine Monitoring un*
=" details of the prog a= =ay be factored into the cha.ge request.
buPE: 8% 4BA@H
2 The pmsed change has been determined to be a Class III change pursuant to 10 : ~5?.170.22 because the change involves infor=ation previously reviewed and requested by the Com=ission to be incorporated into the Big Rock Point Techni-cal Specifications. A check in the amount of $k,000 is af,tached for the re-quf ei fee.
' David P Eoffman (Signed)
David P Hoffman Nuclear Licensing Administrator CO J Zeppler, USNRC EC Resident Inspector - Big Rock Point W
I 4 9
i s
t 9
Y 4'.-
y a%-
g
--y.,ey wr-m-9e<p p- -w - y g
g--.
u=- - +,en 9 p r,se-c y 9-s-...
~- w y9 r,,,
-=pr
,,*-g pr--w,,,er,-e,
-+gyewyyy
,g g9,-wy-,,. - -,.
..y-ww.w-
-, wry r,,r
1 CONSUMERS POWER COMPANY Docket 50-155 Request for Change to the Technical Specifications License DFR-6 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Facility Operating License DPR-6, Docket 50-155, issued to Consuners Power Company on May 1, 196h, for the Big Rock
-Point Plant be changed as described in Section I below:
I.
Changes-Saetion 3.h.2(f)
Add the folloving to the first sentence after..."s.gnal", "or on high radiation at either of two area monitors in the fuel storage area."
~~ Delete the last sentence of this section.
Section h.1.2(a) Safety Relief Valves Add the following verding:
" Acoustic Position Monitors" "6"
Section h.1.2(b) Cterating Recuirements after "...is not exceeded.",
- Add the following wordins "Af, least three (3) steam drum safety valve position =enitors shall be cperable during power operaticn. Also, one of every two (2) adjacent monitors oriented in each no-th-south plane
-shall be operable."
~
Sectien 6.h Replace the existing wording with, "The plant monitering systems include the process radiation monitoring systems, the area nonitor-ing system, and the reactor water level nonitors in the Reactor Depressurizing System."
.Section 6.h'2(b)
Add the folleving wording after "... provisions cf IC~FR 70.",
"Either.of. these two monitors is capable of tripping the ventilatien valves closed during power operatien or ^1el handling activities."
~Section'6.h.2(d)
' Add a.new section (d) as follows:
"(d).Four narrow range water level nonitors are provided in the sain contro1~ room as part of the ?eactor
~
Depressurizing System to be used for decection of.
D.uffuS4.L$ 93$910-
.