Forwards IE Insp Rept 50-317/80-19 on 801028-29 & 1112-14.No Noncompliance Noted
ML19341B960
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 12/22/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19341B961 List:
References
NUDOCS 8102280298
Download: ML19341B960 (2)


See also: IR 05000317/1980019

Text

W

. pSo n%'4

UNITED ST.

i

g$

4

NUCLEAR R EG ULATC;, Y COMMisslON

'

g*

j

RECION I

W .

C

631 P A R M AVENUE

D

of

KING OF PRUSSI A. PENN5Yl.,V ANI A 19406

DEC 2 2 tM0

Dock 9t No. 50-317

g .r%

e

.

Baltimore Gas and Electric Company

'

ATTN: Mr. A. E. Lundvall, Jr.

F2

JAN ;0'f981 =*%.

Vice President, Supply

Q u E55Mh'

P. O. Box 1475

-t

~

'#

Baltimore, Maryland 21203

h

Gentlemen:

_

'

Subject:

Inspection No. 50-317/80-19

This refers to the routine inspection conducted by Mr. William Troskoski of this

office on October 28-29 and November 12-14, 1980, of activities authorized by NRC

License "o. DPR-53 and to the discussions of our findings held by Mr. W. M.

Troskost with Mr. L. B. Russell of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures and

~

representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information frorn public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, whit- identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

-

you in this regard within the specii'ied period, the report will be placed in the

Public Document Room.

l

810228 0%

!

Q

..

DEC 2 2 GD

Baltimore Gas and Electric Company

2

fio reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

EldonJ.7Dl/:r'

n

Brunner,

ief

Reactor Operations and tiuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report tio. 50-317/80-19

cc w/ encl:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, fluclear Power .

R. E. Denton, General Supervisor Training and Technical Services

.