ML19341B960
| ML19341B960 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/22/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19341B961 | List: |
| References | |
| NUDOCS 8102280298 | |
| Download: ML19341B960 (2) | |
See also: IR 05000317/1980019
Text
W
. pSo n%'4
UNITED ST.
i
g$
4
NUCLEAR R EG ULATC;, Y COMMisslON
'
g*
j
RECION I
W .
C
631 P A R M AVENUE
D
of
KING OF PRUSSI A. PENN5Yl.,V ANI A 19406
DEC 2 2 tM0
Dock 9t No. 50-317
g .r%
e
.
Baltimore Gas and Electric Company
'
ATTN: Mr. A. E. Lundvall, Jr.
F2
JAN ;0'f981 =*%.
Vice President, Supply
Q u E55Mh'
P. O. Box 1475
-t
~
'#
Baltimore, Maryland 21203
h
Gentlemen:
_
'
Subject:
Inspection No. 50-317/80-19
This refers to the routine inspection conducted by Mr. William Troskoski of this
office on October 28-29 and November 12-14, 1980, of activities authorized by NRC
License "o. DPR-53 and to the discussions of our findings held by Mr. W. M.
Troskost with Mr. L. B. Russell of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures and
~
representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information frorn public disclosure.
Any such
application must be accompanied by an affidavit executed by the owner of the
information, whit- identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4) of
Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
-
you in this regard within the specii'ied period, the report will be placed in the
Public Document Room.
l
810228 0%
!
Q
..
DEC 2 2 GD
Baltimore Gas and Electric Company
2
fio reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
EldonJ.7Dl/:r'
n
Brunner,
ief
Reactor Operations and tiuclear
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report tio. 50-317/80-19
cc w/ encl:
R. M. Douglas, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
T. Sydnor, General Supervisor, Operations QA
R. C. L. Olson, Principal Engineer
J. A. Tiernan, Manager, fluclear Power .
R. E. Denton, General Supervisor Training and Technical Services
.