ML19341B760

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-443/80-10 & 50-444/80-10
ML19341B760
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 01/08/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML19341B761 List:
References
NUDOCS 8102270417
Download: ML19341B760 (1)


See also: IR 05000443/1980010

Text

Th

' *~ '

pu

/

g

ot

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y

e

p,

g

j

REGION I

o,

e

631 PARK AVENUE

%, ..... '

,o

KING OF PRUSSIA, PENNSYLVANIA 19406

January 8, 1981

Docket Nos. 50-443

50-444

s

&

Public Service Company of New Hampshire

8

'

ATTN:

Mr. W. C. Tallman

Q

%'<,O o/S [ J

O

-.

Chairman and Chief Executive Officer

f'i %

FCD

1000 Elm Street

'

<h

V

Manchester, New Hampshire 03105

% % NI

%^y

Gentlemen:

.

,r

e

'

Subject:

Combined Inspection 50-443/80-10 and 50-444/80-10

This refers to your letter dated December 2,1980, in response to our letter

dated October 29, 1980.

Thank you for informing us of the corrective and preventive actions documented

in your letter.

These actions will be examined during a future inspection of

your licensed program.

Not withstanding the results of your laboratory tests and your final evaluation

with regard to Item B (80-10-01) of the Notice of Violation, it appears that

your interpretation of the AISC requirements for the thermal cutting of edges

would permit 3/16 inch notches on structural steel bolted connection surfaces.

It is our position that this AISC reference to occasional notches or gouges

does not apply to the slotted hole surfaces of high-strength bolted, bearing-type

connections.

A more applicable reference would be the AISC definition of a

milled surface.

Our understanding of your corrective action in this area is

that future surveillance and inspection criteria will assure that all notches

have been removed.

If your planned actions differ in this regard, please

contact tris office immediately.

l

Your cooperation with us is appreciated.

l

l

Sincerely,

l

'

/

7 b,. h f

.

f

bert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

-

cc:

John DeVincentis, Project Manager

310227 ogn

9