ML19341B372

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amends 61 & 58 to Licenses DPR-39 & DPR-48,respectively
ML19341B372
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/15/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19341B368 List:
References
NUDOCS 8101300827
Download: ML19341B372 (3)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-295 AND 50-304 COMMONWEALTH EDIS0N COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 61 to Facility Operating License No. DPR-39, and Amendment No. 58 to Facility Operating License No. DPR-48 issued to the Commonwealth Edison Company (the licensee), which revised the licenses for operation of Zion Station, Units 1 and 2 (the facilities) located in Zion, Illinois. The amendments are effective as of the date of issuance.

The amendments combine license conditions for the Security Plan, Safeguards Contingency Plan, and add a condition to include the Commission-approved Guard Training and Qualification Plan. The amendments also remove license conditions on advance notification of heavy loads movement, implementation of a corrosion surveillance program for the spent fuel pool racks, and _in, situ neutron attenuation tests to verify boron in the racks in response to the decision of the Atomic Safety and Licensing Appeal Board decision (ALAP-616) dated October 2,1980.

The licensee's filing complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the_ Commission's rules and regulations. The Commission has made appropriate findings g130

1 7590-01

. as required by the Act and the Commission's rules and regulations in Prior 10 CFR Chapter I, which are set forth in the license amendments.

public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR Sl.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.-

The licensee's filing dated August 16,1979, as revised August 11, 1980, is being withheld from public disclosure pursuant to_10 CFR 2.790(d).

The withheld information is subject to disclosure in accordance with the.

provisions of 10 CFR 9.12.

For further details with respect to'this action, see (1) the licensee's filing dated August 16, as revised August 11,1980,(2) Amendment Nos. 61 and 58 to License Nos. DPR-39 and DPR-4 EL (3) the Commission's letter to the licensee dated January 15,1981, and (4) the decision of the Atomic All Safety and Licensing Appeal Board (ALAP-616) dated October 2, 1980.

of these items are available for public inspection at the Commission's

75'90-01

  • Public Document Room,1717 H Street, N.W., Washington, D.C. and at the Zion-Benton Public Library District, 2600 Emmaus Avenue, Zion, Illinois 60099.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission Washington, D.C.

20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 15th day of January 1981.

F01 THE NUCLEAR F ULATORY COMMISSION f

r

. \\% g hie Operating Reactors B 4 ch #1 Division of Licensing \\

l l

...